Terraformed Corridor
Ended
| Year | Action | Detail | Cost | Result |
|---|---|---|---|---|
| 2088 | Advance | 24 months | - | success |
| 2086 | Advance | 12 months | - | success |
| 2085 | Advance | 24 months | - | success |
| 2083 | Advance | 24 months | - | success |
| 2081 | Advance | 24 months | - | success |
| 2079 | Advance | 24 months | - | success |
| 2077 | Build Airport | (31, 64) | $260 | failed |
| 2077 | Advance | 24 months | - | success |
| 2075 | Advance | 24 months | - | success |
| 2073 | build_wire_line | - | $35 | success |
| 2073 | Build Police Station | (20, 64) | $500 | success |
| 2073 | Zone Commercial | (23, 67) | $115 | success |
| 2073 | Zone Residential | (20, 67) | $120 | success |
| 2073 | Zone Industrial | (17, 67) | $105 | success |
| 2073 | Zone Commercial | (23, 64) | $115 | success |
| 2073 | Zone Residential | (17, 64) | $105 | success |
| 2073 | Zone Commercial | (23, 61) | $145 | success |
| 2073 | Zone Residential | (20, 61) | $155 | success |
| 2073 | Zone Commercial | (17, 61) | $135 | success |
| 2073 | build_road_rect | (15, 59) | $400 | success |
| 2073 | Build Airport | (20, 64) | - | failed |
| 2073 | Advance | 24 months | - | success |
| 2071 | Advance | 24 months | - | success |
| 2069 | Build Airport | (20, 64) | - | failed |
| 2069 | Advance | 24 months | - | success |
| 2067 | Advance | 24 months | - | success |
| 2065 | Build Airport | (20, 64) | - | failed |
| 2065 | Advance | 24 months | - | success |
| 2063 | Advance | 24 months | - | success |
| 2061 | Build Airport | (20, 64) | - | failed |
| 2061 | Advance | 24 months | - | success |
| 2059 | Advance | 24 months | - | success |
| 2057 | Build Airport | (20, 64) | $20 | failed |
| 2057 | Advance | 24 months | - | success |
| 2055 | Advance | 24 months | - | success |
| 2053 | build_wire_line | - | $20 | success |
| 2053 | Build Fire Station | (9, 64) | $500 | success |
| 2053 | Zone Residential | (12, 67) | $115 | success |
| 2053 | Zone Commercial | (9, 67) | $130 | success |
| 2053 | Zone Residential | (6, 67) | $125 | success |
| 2053 | Zone Residential | (12, 64) | $115 | success |
| 2053 | Zone Industrial | (6, 64) | $190 | success |
| 2053 | Zone Residential | (12, 61) | $135 | success |
| 2053 | Zone Commercial | (9, 61) | $175 | success |
| 2053 | Zone Residential | (6, 61) | $185 | success |
| 2053 | build_road_rect | (4, 59) | $400 | success |
| 2053 | Build Airport | (9, 64) | - | failed |
| 2053 | Advance | 24 months | - | success |
| 2051 | Advance | 24 months | - | success |
| 2049 | Build Airport | (9, 64) | $120 | failed |
| 2049 | Advance | 24 months | - | success |
| 2047 | Advance | 24 months | - | success |
| 2045 | build_wire_line | - | $40 | success |
| 2045 | Build Park | (53, 53) | $20 | success |
| 2045 | Zone Commercial | (56, 56) | $100 | success |
| 2045 | Zone Residential | (53, 56) | $100 | success |
| 2045 | Zone Industrial | (50, 56) | $165 | success |
| 2045 | Zone Industrial | (56, 53) | $165 | success |
| 2045 | Zone Industrial | (50, 53) | $165 | success |
| 2045 | Zone Industrial | (56, 50) | $105 | success |
| 2045 | Zone Industrial | (53, 50) | $195 | success |
| 2045 | Zone Industrial | (50, 50) | $195 | success |
| 2045 | build_road_rect | (48, 48) | $370 | success |
| 2045 | Build Airport | (53, 53) | - | failed |
| 2045 | Advance | 24 months | - | success |
| 2043 | Advance | 24 months | - | success |
| 2041 | Build Airport | (53, 53) | - | failed |
| 2041 | Advance | 24 months | - | success |
| 2039 | Advance | 24 months | - | success |
| 2037 | Build Airport | (53, 53) | $150 | failed |
| 2037 | Advance | 24 months | - | success |
| 2035 | Advance | 24 months | - | success |
| 2033 | build_wire_line | - | $50 | success |
| 2033 | Build Park | (53, 42) | $20 | success |
| 2033 | Zone Residential | (56, 45) | $100 | success |
| 2033 | Zone Residential | (53, 45) | $100 | success |
| 2033 | Zone Industrial | (50, 45) | $120 | success |
| 2033 | Zone Commercial | (56, 42) | $165 | success |
| 2033 | Zone Commercial | (50, 42) | $105 | success |
| 2033 | Zone Commercial | (56, 39) | $100 | success |
| 2033 | Zone Residential | (53, 39) | $105 | success |
| 2033 | Zone Commercial | (50, 39) | $105 | success |
| 2033 | build_road_rect | (48, 37) | $380 | success |
| 2033 | Build Airport | (53, 42) | - | failed |
| 2033 | Advance | 24 months | - | success |
| 2031 | Advance | 24 months | - | success |
| 2029 | Build Airport | (53, 42) | - | failed |
| 2029 | Advance | 24 months | - | success |
| 2027 | Advance | 24 months | - | success |
| 2025 | Build Airport | (53, 42) | - | failed |
| 2025 | Advance | 24 months | - | success |
| 2023 | Advance | 24 months | - | success |
| 2021 | Build Airport | (53, 42) | - | failed |
| 2021 | Advance | 24 months | - | success |
| 2019 | Advance | 24 months | - | success |
| 2017 | Build Airport | (53, 42) | - | failed |
| 2017 | Advance | 24 months | - | success |
| 2015 | Advance | 24 months | - | success |
| 2013 | build_wire_line | - | $30 | success |
| 2013 | Build Fire Station | (53, 31) | $500 | success |
| 2013 | Zone Commercial | (56, 34) | - | failed |
| 2013 | Zone Residential | (53, 34) | $120 | success |
| 2013 | Zone Industrial | (50, 34) | $100 | success |
| 2013 | Zone Industrial | (56, 31) | - | failed |
| 2013 | Zone Industrial | (50, 31) | $125 | success |
| 2013 | Zone Industrial | (56, 28) | $155 | success |
| 2013 | Zone Industrial | (53, 28) | $185 | success |
| 2013 | Zone Industrial | (50, 28) | $145 | success |
| 2013 | build_road_rect | (48, 26) | $400 | success |
| 2013 | Build Airport | (53, 31) | - | failed |
| 2013 | Advance | 24 months | - | success |
| 2011 | Advance | 24 months | - | success |
| 2009 | Set Budget | - | - | success |
| 2009 | Build Airport | (53, 31) | $100 | failed |
| 2009 | Advance | 24 months | - | success |
| 2007 | Advance | 24 months | - | success |
| 2005 | build_wire_line | - | $5 | success |
| 2005 | Build Police Station | (53, 20) | $500 | success |
| 2005 | Zone Industrial | (56, 23) | $115 | success |
| 2005 | Zone Commercial | (53, 23) | $120 | success |
| 2005 | Zone Commercial | (50, 23) | $150 | success |
| 2005 | Zone Residential | (56, 20) | $120 | success |
| 2005 | Zone Residential | (50, 20) | $165 | success |
| 2005 | Zone Commercial | (56, 17) | $105 | success |
| 2005 | Zone Commercial | (53, 17) | $105 | success |
| 2005 | Zone Commercial | (50, 17) | $105 | success |
| 2005 | build_road_rect | (48, 15) | $400 | success |
| 2005 | Build Airport | (53, 20) | - | failed |
| 2005 | Advance | 24 months | - | success |
| 2003 | Advance | 24 months | - | success |
| 2001 | Build Airport | (53, 20) | $80 | failed |
| 2001 | Advance | 24 months | - | success |
| 1999 | Advance | 24 months | - | success |
| 1997 | build_wire_line | - | $15 | success |
| 1997 | Build Park | (53, 9) | $20 | success |
| 1997 | Zone Commercial | (56, 12) | $115 | success |
| 1997 | Zone Residential | (53, 12) | $120 | success |
| 1997 | Zone Industrial | (50, 12) | $145 | success |
| 1997 | Zone Commercial | (56, 9) | $130 | success |
| 1997 | Zone Residential | (50, 9) | $105 | success |
| 1997 | Zone Commercial | (56, 6) | $115 | success |
| 1997 | Zone Residential | (53, 6) | $130 | success |
| 1997 | Zone Commercial | (50, 6) | $105 | success |
| 1997 | build_road_rect | (48, 4) | $400 | success |
| 1997 | Build Airport | (53, 9) | - | failed |
| 1997 | Advance | 24 months | - | success |
| 1995 | Advance | 24 months | - | success |
| 1993 | build_wire_line | - | $25 | success |
| 1993 | Build Fire Station | (42, 53) | $500 | success |
| 1993 | Zone Residential | (45, 56) | $115 | success |
| 1993 | Zone Commercial | (42, 56) | $120 | success |
| 1993 | Zone Residential | (39, 56) | $115 | success |
| 1993 | Zone Residential | (45, 53) | $120 | success |
| 1993 | Zone Industrial | (39, 53) | $140 | success |
| 1993 | Zone Residential | (45, 50) | $125 | success |
| 1993 | Zone Commercial | (42, 50) | $105 | success |
| 1993 | Zone Residential | (39, 50) | $125 | success |
| 1993 | build_road_rect | (37, 48) | $400 | success |
| 1993 | Build Airport | (42, 53) | $110 | failed |
| 1993 | Advance | 24 months | - | success |
| 1991 | Advance | 24 months | - | success |
| 1989 | build_wire_line | - | $20 | success |
| 1989 | Build Park | (42, 9) | $20 | success |
| 1989 | Zone Residential | (45, 12) | $105 | success |
| 1989 | Zone Residential | (42, 12) | $105 | success |
| 1989 | Zone Industrial | (39, 12) | $125 | success |
| 1989 | Zone Commercial | (45, 9) | $120 | success |
| 1989 | Zone Commercial | (39, 9) | $115 | success |
| 1989 | Zone Residential | (45, 6) | $155 | success |
| 1989 | Zone Residential | (42, 6) | $140 | success |
| 1989 | Zone Residential | (39, 6) | $105 | success |
| 1989 | build_road_rect | (37, 4) | $400 | success |
| 1989 | Build Airport | (42, 9) | $50 | failed |
| 1989 | Advance | 24 months | - | success |
| 1987 | Advance | 24 months | - | success |
| 1985 | build_wire_line | - | $45 | success |
| 1985 | Build Park | (31, 53) | $20 | success |
| 1985 | Zone Residential | (34, 56) | $115 | success |
| 1985 | Zone Residential | (31, 56) | $120 | success |
| 1985 | Zone Residential | (28, 56) | $105 | success |
| 1985 | Zone Commercial | (34, 53) | $130 | success |
| 1985 | Zone Commercial | (28, 53) | $105 | success |
| 1985 | Zone Industrial | (34, 50) | $115 | success |
| 1985 | Zone Residential | (31, 50) | $120 | success |
| 1985 | Zone Residential | (28, 50) | $125 | success |
| 1985 | build_road_rect | (26, 48) | $400 | success |
| 1985 | Build Airport | (31, 53) | - | failed |
| 1985 | Advance | 24 months | - | success |
| 1981 | Set Budget | - | - | success |
| 1983 | Advance | 24 months | - | success |
| 1981 | Build Airport | (31, 53) | - | failed |
| 1981 | Advance | 24 months | - | success |
| 1979 | Advance | 24 months | - | success |
| 1977 | Build Airport | (31, 53) | - | failed |
| 1977 | Advance | 12 months | - | success |
| 1976 | Advance | 24 months | - | success |
| 1974 | Advance | 24 months | - | success |
| 1972 | Advance | 24 months | - | success |
| 1968 | Set Budget | - | - | success |
| 1970 | Advance | 24 months | - | success |
| 1968 | Build Coal Power | (26, 38) | $3,100 | success |
| 1968 | Build Coal Power | (14, 26) | - | failed |
| 1968 | Build Coal Power | (38, 26) | - | failed |
| 1968 | Build Coal Power | (26, 26) | - | failed |
| 1968 | Build Coal Power | (32, 26) | - | failed |
| 1968 | Build Coal Power | (20, 26) | - | failed |
| 1968 | Build Coal Power | (26, 32) | - | failed |
| 1968 | Build Coal Power | (26, 20) | - | failed |
| 1968 | Build Airport | (31, 53) | $10 | failed |
| 1968 | Advance | 24 months | - | success |
| 1966 | Advance | 24 months | - | success |
| 1964 | build_wire_line | - | $5 | success |
| 1964 | Build Police Station | (31, 9) | $500 | success |
| 1964 | Zone Industrial | (34, 12) | $100 | success |
| 1964 | Zone Commercial | (31, 12) | $105 | success |
| 1964 | Zone Commercial | (28, 12) | $105 | success |
| 1964 | Zone Residential | (34, 9) | $100 | success |
| 1964 | Zone Commercial | (28, 9) | $100 | success |
| 1964 | Zone Commercial | (34, 6) | $140 | success |
| 1964 | Zone Commercial | (31, 6) | $125 | success |
| 1964 | Zone Residential | (28, 6) | $100 | success |
| 1964 | build_road_rect | (26, 4) | $400 | success |
| 1964 | Build Airport | (31, 9) | - | failed |
| 1964 | Advance | 24 months | - | success |
| 1962 | Advance | 24 months | - | success |
| 1960 | Build Airport | (31, 9) | - | failed |
| 1960 | Advance | 24 months | - | success |
| 1958 | Advance | 24 months | - | success |
| 1956 | build_wire_line | - | $50 | success |
| 1956 | Build Park | (20, 53) | $20 | success |
| 1956 | Zone Commercial | (23, 56) | $115 | success |
| 1956 | Zone Residential | (20, 56) | $120 | success |
| 1956 | Zone Industrial | (17, 56) | $165 | success |
| 1956 | Zone Commercial | (23, 53) | $130 | success |
| 1956 | Zone Residential | (17, 53) | $195 | success |
| 1956 | Zone Commercial | (23, 50) | $155 | success |
| 1956 | Zone Residential | (20, 50) | $190 | success |
| 1956 | Zone Commercial | (17, 50) | $175 | success |
| 1956 | build_road_rect | (15, 48) | $400 | success |
| 1956 | Build Airport | (20, 53) | $180 | failed |
| 1956 | Advance | 24 months | - | success |
| 1954 | Advance | 24 months | - | success |
| 1952 | build_wire_line | - | $10 | success |
| 1952 | Build Park | (20, 9) | $20 | success |
| 1952 | Zone Residential | (23, 12) | $105 | success |
| 1952 | Zone Commercial | (20, 12) | $105 | success |
| 1952 | Zone Industrial | (17, 12) | $120 | success |
| 1952 | Zone Commercial | (23, 9) | $120 | success |
| 1952 | Zone Commercial | (17, 9) | $125 | success |
| 1952 | Zone Commercial | (23, 6) | $115 | success |
| 1952 | Zone Residential | (20, 6) | $130 | success |
| 1952 | Zone Residential | (17, 6) | $100 | success |
| 1952 | build_road_rect | (15, 4) | $380 | success |
| 1952 | Build Airport | (20, 9) | - | failed |
| 1952 | Advance | 24 months | - | success |
| 1950 | Advance | 24 months | - | success |
| 1948 | Build Airport | (20, 9) | - | failed |
| 1948 | Advance | 24 months | - | success |
| 1946 | Advance | 24 months | - | success |
| 1944 | build_wire_line | - | $35 | success |
| 1944 | Build Fire Station | (9, 53) | $500 | success |
| 1944 | Zone Commercial | (12, 56) | $115 | success |
| 1944 | Zone Residential | (9, 56) | $130 | success |
| 1944 | Zone Industrial | (6, 56) | $165 | success |
| 1944 | Zone Commercial | (12, 53) | $130 | success |
| 1944 | Zone Residential | (6, 53) | $180 | success |
| 1944 | Zone Industrial | (12, 50) | $160 | success |
| 1944 | Zone Commercial | (9, 50) | $195 | success |
| 1944 | Zone Residential | (6, 50) | $175 | success |
| 1944 | build_road_rect | (4, 48) | $400 | success |
| 1944 | Build Airport | (9, 53) | $330 | failed |
| 1944 | Advance | 24 months | - | success |
| 1942 | Advance | 24 months | - | success |
| 1940 | build_wire_line | - | $20 | success |
| 1940 | Build Park | (9, 42) | $20 | success |
| 1940 | Zone Commercial | (12, 45) | $115 | success |
| 1940 | Zone Commercial | (9, 45) | $130 | success |
| 1940 | Zone Commercial | (6, 45) | $155 | success |
| 1940 | Zone Residential | (12, 42) | $120 | success |
| 1940 | Zone Commercial | (6, 42) | $195 | success |
| 1940 | Zone Commercial | (12, 39) | $165 | success |
| 1940 | Zone Commercial | (9, 39) | $185 | success |
| 1940 | Zone Residential | (6, 39) | $120 | success |
| 1940 | build_road_rect | (4, 37) | $400 | success |
| 1940 | Build Airport | (9, 42) | $310 | failed |
| 1940 | Advance | 24 months | - | success |
| 1938 | Advance | 24 months | - | success |
| 1936 | build_wire_line | - | $15 | success |
| 1936 | Build Police Station | (9, 31) | $500 | success |
| 1936 | Zone Residential | (12, 34) | $100 | success |
| 1936 | Zone Residential | (9, 34) | $125 | success |
| 1936 | Zone Industrial | (6, 34) | $115 | success |
| 1936 | Zone Commercial | (12, 31) | $105 | success |
| 1936 | Zone Commercial | (6, 31) | $130 | success |
| 1936 | Zone Residential | (12, 28) | $125 | success |
| 1936 | Zone Residential | (9, 28) | $100 | success |
| 1936 | Zone Residential | (6, 28) | $105 | success |
| 1936 | build_road_rect | (4, 26) | $400 | success |
| 1936 | Build Airport | (9, 31) | $50 | failed |
| 1936 | Advance | 24 months | - | success |
| 1934 | Advance | 24 months | - | success |
| 1932 | build_wire_line | - | $10 | success |
| 1932 | Build Fire Station | (9, 20) | $500 | success |
| 1932 | Zone Commercial | (12, 23) | $100 | success |
| 1932 | Zone Residential | (9, 23) | $125 | success |
| 1932 | Zone Industrial | (6, 23) | $115 | success |
| 1932 | Zone Industrial | (12, 20) | $105 | success |
| 1932 | Zone Industrial | (6, 20) | $135 | success |
| 1932 | Zone Industrial | (12, 17) | $165 | success |
| 1932 | Zone Industrial | (9, 17) | $195 | success |
| 1932 | Zone Industrial | (6, 17) | $185 | success |
| 1932 | build_road_rect | (4, 15) | $400 | success |
| 1932 | Build Airport | (9, 20) | $40 | failed |
| 1932 | Advance | 24 months | - | success |
| 1930 | Advance | 24 months | - | success |
| 1928 | build_wire_line | - | $25 | success |
| 1928 | Build Park | (9, 9) | $20 | success |
| 1928 | Zone Residential | (12, 12) | $100 | success |
| 1928 | Zone Residential | (9, 12) | $100 | success |
| 1928 | Zone Industrial | (6, 12) | $150 | success |
| 1928 | Zone Commercial | (12, 9) | $120 | success |
| 1928 | Zone Commercial | (6, 9) | $160 | success |
| 1928 | Zone Industrial | (12, 6) | $115 | success |
| 1928 | Zone Commercial | (9, 6) | $180 | success |
| 1928 | Zone Residential | (6, 6) | $245 | success |
| 1928 | build_road_rect | (4, 4) | $400 | success |
| 1928 | Build Airport | (9, 9) | $120 | failed |
| 1928 | Advance | 24 months | - | success |
| 1926 | Advance | 24 months | - | success |
| 1924 | build_wire_line | - | $15 | success |
| 1924 | Build Park | (42, 42) | $20 | success |
| 1924 | Zone Commercial | (45, 45) | $115 | success |
| 1924 | Zone Commercial | (42, 45) | $130 | success |
| 1924 | Zone Commercial | (39, 45) | $165 | success |
| 1924 | Zone Residential | (45, 42) | $120 | success |
| 1924 | Zone Residential | (39, 42) | $140 | success |
| 1924 | Zone Commercial | (45, 39) | $105 | success |
| 1924 | Zone Commercial | (42, 39) | $125 | success |
| 1924 | Zone Commercial | (39, 39) | $105 | success |
| 1924 | build_road_rect | (37, 37) | $400 | success |
| 1924 | Build Airport | (42, 42) | $170 | failed |
| 1924 | Advance | 24 months | - | success |
| 1922 | Advance | 24 months | - | success |
| 1920 | build_wire_line | - | $10 | success |
| 1920 | Build Fire Station | (42, 31) | $500 | success |
| 1920 | Zone Residential | (45, 34) | $135 | success |
| 1920 | Zone Residential | (42, 34) | $130 | success |
| 1920 | Zone Residential | (39, 34) | $105 | success |
| 1920 | Zone Residential | (45, 31) | $140 | success |
| 1920 | Zone Industrial | (39, 31) | $105 | success |
| 1920 | Zone Residential | (45, 28) | $125 | success |
| 1920 | Zone Commercial | (42, 28) | $105 | success |
| 1920 | Zone Commercial | (39, 28) | $105 | success |
| 1920 | build_road_rect | (37, 26) | $400 | success |
| 1920 | Advance | 24 months | - | success |
| 1918 | Advance | 24 months | - | success |
| 1916 | build_wire_line | - | $10 | success |
| 1916 | Build Police Station | (42, 20) | $500 | success |
| 1916 | Zone Residential | (45, 23) | $115 | success |
| 1916 | Zone Commercial | (42, 23) | $120 | success |
| 1916 | Zone Industrial | (39, 23) | $105 | success |
| 1916 | Zone Commercial | (45, 20) | $130 | success |
| 1916 | Zone Commercial | (39, 20) | $110 | success |
| 1916 | Zone Commercial | (45, 17) | $155 | success |
| 1916 | Zone Residential | (42, 17) | $200 | success |
| 1916 | Zone Residential | (39, 17) | $110 | success |
| 1916 | build_road_rect | (37, 15) | $400 | success |
| 1916 | Build Stadium | (31, 42) | $5,060 | success |
| 1916 | Advance | 24 months | - | success |
| 1914 | Advance | 24 months | - | success |
| 1912 | Build Park | (31, 20) | $65 | success |
| 1912 | Zone Residential | (34, 23) | $105 | success |
| 1912 | Zone Commercial | (31, 23) | $155 | success |
| 1912 | Zone Residential | (28, 23) | $20 | failed |
| 1912 | Zone Residential | (34, 20) | $140 | success |
| 1912 | Zone Industrial | (28, 20) | $20 | failed |
| 1912 | Zone Residential | (34, 17) | $115 | success |
| 1912 | Zone Commercial | (31, 17) | $125 | success |
| 1912 | Zone Residential | (28, 17) | $100 | success |
| 1912 | build_road_rect | (26, 15) | $330 | success |
| 1912 | Build Seaport | (20, 42) | $3,120 | success |
| 1912 | Advance | 24 months | - | success |
| 1910 | Advance | 24 months | - | success |
| 1908 | build_wire_line | - | $10 | success |
| 1908 | Build Fire Station | (20, 31) | $500 | success |
| 1908 | Zone Residential | (23, 34) | $100 | success |
| 1908 | Zone Residential | (20, 34) | $125 | success |
| 1908 | Zone Residential | (17, 34) | $135 | success |
| 1908 | Zone Commercial | (23, 31) | $165 | success |
| 1908 | Zone Commercial | (17, 31) | $170 | success |
| 1908 | Zone Industrial | (23, 28) | $165 | success |
| 1908 | Zone Residential | (20, 28) | $150 | success |
| 1908 | Zone Residential | (17, 28) | $105 | success |
| 1908 | build_road_rect | (15, 26) | $400 | success |
| 1908 | Advance | 24 months | - | success |
| 1906 | Advance | 24 months | - | success |
| 1904 | build_wire_line | - | $10 | success |
| 1904 | Build Park | (20, 20) | $20 | success |
| 1904 | Zone Commercial | (23, 23) | - | failed |
| 1904 | Zone Residential | (20, 23) | $125 | success |
| 1904 | Zone Industrial | (17, 23) | $115 | success |
| 1904 | Zone Industrial | (23, 20) | $120 | success |
| 1904 | Zone Industrial | (17, 20) | $130 | success |
| 1904 | Zone Industrial | (23, 17) | $100 | success |
| 1904 | Zone Industrial | (20, 17) | $100 | success |
| 1904 | Zone Industrial | (17, 17) | $180 | success |
| 1904 | build_road_rect | (15, 15) | $350 | success |
| 1904 | Advance | 24 months | - | success |
| 1902 | Advance | 24 months | - | success |
| 1900 | build_wire_line | - | $20 | success |
| 1900 | Build Park | (31, 31) | $20 | success |
| 1900 | Zone Industrial | (34, 34) | $115 | success |
| 1900 | Zone Commercial | (31, 34) | $130 | success |
| 1900 | Zone Residential | (28, 34) | $155 | success |
| 1900 | Zone Residential | (34, 31) | $130 | success |
| 1900 | Zone Residential | (28, 31) | $120 | success |
| 1900 | Zone Residential | (34, 28) | $115 | success |
| 1900 | Zone Residential | (31, 28) | $115 | success |
| 1900 | Zone Residential | (28, 28) | $120 | success |
| 1900 | build_road_rect | (26, 26) | $400 | success |
| 1900 | Set Budget | - | - | success |
| 1900 | Advance | 1 month | - | success |
| 1900 | Build Coal Power | (26, 20) | $3,040 | success |
Population 57,920
Funds $0
Year 2088
Score 237
Class Capital
Approval
Demand
Population Breakdown
Residential 1,544
Commercial 85
Industrial 84
Assessed Value
Value $31,260,000
Top Problems
Infrastructure
5 Police
7 Fire
2 Power
1 Ports
0 Airports
1 Stadiums
1052 Roads
0 Rail
Power
Powered / Total 108 / 211 (51%)
Budget
Tax Rate 7%
Cash Flow $0
Fire 100%
Police 92%
Road 100%
Environment
Crime 35
Pollution 51
Land Value 77