| Year | Action | Detail | Cost | Result |
|---|---|---|---|---|
| 2260 | Advance | 12 months | - | success |
| 2259 | Advance | 24 months | - | success |
| 2257 | Advance | 24 months | - | success |
| 2255 | Advance | 12 months | - | success |
| 2254 | Advance | 24 months | - | success |
| 2252 | Advance | 24 months | - | success |
| 2250 | Advance | 12 months | - | success |
| 2249 | Advance | 24 months | - | success |
| 2247 | Advance | 24 months | - | success |
| 2245 | Advance | 12 months | - | success |
| 2244 | Advance | 24 months | - | success |
| 2242 | Advance | 24 months | - | success |
| 2240 | Advance | 12 months | - | success |
| 2239 | Advance | 24 months | - | success |
| 2237 | Advance | 24 months | - | success |
| 2235 | Advance | 12 months | - | success |
| 2234 | Advance | 24 months | - | success |
| 2232 | Advance | 24 months | - | success |
| 2230 | Advance | 12 months | - | success |
| 2229 | Advance | 24 months | - | success |
| 2227 | Advance | 24 months | - | success |
| 2225 | Advance | 12 months | - | success |
| 2224 | Advance | 24 months | - | success |
| 2222 | Advance | 24 months | - | success |
| 2220 | Advance | 12 months | - | success |
| 2219 | Advance | 24 months | - | success |
| 2217 | Advance | 24 months | - | success |
| 2215 | Advance | 12 months | - | success |
| 2214 | Advance | 24 months | - | success |
| 2212 | Advance | 24 months | - | success |
| 2210 | Advance | 12 months | - | success |
| 2209 | Advance | 24 months | - | success |
| 2207 | Advance | 24 months | - | success |
| 2205 | Advance | 12 months | - | success |
| 2204 | Advance | 24 months | - | success |
| 2202 | Advance | 24 months | - | success |
| 2200 | Advance | 12 months | - | success |
| 2199 | Advance | 24 months | - | success |
| 2197 | Advance | 24 months | - | success |
| 2195 | Advance | 12 months | - | success |
| 2194 | Advance | 24 months | - | success |
| 2192 | Advance | 24 months | - | success |
| 2190 | Advance | 12 months | - | success |
| 2189 | Advance | 24 months | - | success |
| 2187 | Advance | 24 months | - | success |
| 2185 | Advance | 12 months | - | success |
| 2184 | Advance | 24 months | - | success |
| 2182 | Advance | 24 months | - | success |
| 2180 | Advance | 12 months | - | success |
| 2179 | Advance | 24 months | - | success |
| 2177 | Advance | 24 months | - | success |
| 2175 | Advance | 12 months | - | success |
| 2174 | Advance | 24 months | - | success |
| 2172 | Advance | 24 months | - | success |
| 2170 | Advance | 12 months | - | success |
| 2169 | Advance | 24 months | - | success |
| 2167 | Advance | 24 months | - | success |
| 2165 | build_wire_line | - | $15 | success |
| 2165 | Build Fire Station | (105, 81) | $500 | success |
| 2165 | Zone Commercial | (108, 84) | $100 | success |
| 2165 | Zone Residential | (105, 84) | $100 | success |
| 2165 | Zone Industrial | (102, 84) | $120 | success |
| 2165 | Zone Commercial | (108, 81) | $100 | success |
| 2165 | Zone Residential | (102, 81) | $160 | success |
| 2165 | Zone Industrial | (108, 78) | $100 | success |
| 2165 | Zone Commercial | (105, 78) | $100 | success |
| 2165 | Zone Residential | (102, 78) | $100 | success |
| 2165 | build_road_rect | (100, 76) | $400 | success |
| 2165 | Advance | 12 months | - | success |
| 2164 | Advance | 24 months | - | success |
| 2162 | Advance | 24 months | - | success |
| 2160 | build_wire_line | - | $40 | success |
| 2160 | Build Park | (105, 70) | $20 | success |
| 2160 | Zone Industrial | (108, 73) | $100 | success |
| 2160 | Zone Commercial | (105, 73) | $100 | success |
| 2160 | Zone Commercial | (102, 73) | $100 | success |
| 2160 | Zone Residential | (108, 70) | $100 | success |
| 2160 | Zone Residential | (102, 70) | $100 | success |
| 2160 | Zone Commercial | (108, 67) | $100 | success |
| 2160 | Zone Commercial | (105, 67) | $100 | success |
| 2160 | Zone Commercial | (102, 67) | $100 | success |
| 2160 | build_road_rect | (100, 65) | $400 | success |
| 2160 | Advance | 12 months | - | success |
| 2159 | Advance | 24 months | - | success |
| 2157 | Advance | 24 months | - | success |
| 2155 | build_wire_line | - | $35 | success |
| 2155 | Build Park | (105, 59) | $20 | success |
| 2155 | Zone Residential | (108, 62) | $120 | success |
| 2155 | Zone Residential | (105, 62) | $110 | success |
| 2155 | Zone Residential | (102, 62) | $140 | success |
| 2155 | Zone Residential | (108, 59) | $150 | success |
| 2155 | Zone Residential | (102, 59) | $150 | success |
| 2155 | Zone Residential | (108, 56) | $130 | success |
| 2155 | Zone Residential | (105, 56) | $160 | success |
| 2155 | Zone Residential | (102, 56) | $160 | success |
| 2155 | build_road_rect | (100, 54) | $400 | success |
| 2155 | Advance | 12 months | - | success |
| 2154 | Advance | 24 months | - | success |
| 2152 | Advance | 24 months | - | success |
| 2150 | build_wire_line | - | $50 | success |
| 2150 | Build Police Station | (105, 48) | $500 | success |
| 2150 | Zone Industrial | (108, 51) | $100 | success |
| 2150 | Zone Commercial | (105, 51) | $100 | success |
| 2150 | Zone Commercial | (102, 51) | $100 | success |
| 2150 | Zone Residential | (108, 48) | $100 | success |
| 2150 | Zone Residential | (102, 48) | $105 | success |
| 2150 | Zone Commercial | (108, 45) | $120 | success |
| 2150 | Zone Commercial | (105, 45) | $125 | success |
| 2150 | Zone Commercial | (102, 45) | $175 | success |
| 2150 | build_road_rect | (100, 43) | $400 | success |
| 2150 | Advance | 12 months | - | success |
| 2149 | Advance | 24 months | - | success |
| 2147 | Advance | 24 months | - | success |
| 2145 | build_wire_line | - | $50 | success |
| 2145 | Build Park | (105, 37) | $20 | success |
| 2145 | Zone Industrial | (108, 40) | $115 | success |
| 2145 | Zone Commercial | (105, 40) | $120 | success |
| 2145 | Zone Commercial | (102, 40) | $100 | success |
| 2145 | Zone Residential | (108, 37) | $120 | success |
| 2145 | Zone Residential | (102, 37) | $105 | success |
| 2145 | Zone Commercial | (108, 34) | $105 | success |
| 2145 | Zone Commercial | (105, 34) | $115 | success |
| 2145 | Zone Commercial | (102, 34) | $165 | success |
| 2145 | build_road_rect | (100, 32) | $400 | success |
| 2145 | Advance | 12 months | - | success |
| 2144 | Advance | 24 months | - | success |
| 2142 | Advance | 24 months | - | success |
| 2140 | build_wire_line | - | $50 | success |
| 2140 | Build Park | (105, 26) | $40 | success |
| 2140 | Zone Residential | (108, 29) | $135 | success |
| 2140 | Zone Commercial | (105, 29) | $185 | success |
| 2140 | Zone Industrial | (102, 29) | $145 | success |
| 2140 | Zone Commercial | (108, 26) | $180 | success |
| 2140 | Zone Commercial | (102, 26) | $165 | success |
| 2140 | Zone Commercial | (108, 23) | $165 | success |
| 2140 | Zone Residential | (105, 23) | $195 | success |
| 2140 | Zone Residential | (102, 23) | $185 | success |
| 2140 | build_road_rect | (100, 21) | $400 | success |
| 2140 | Advance | 12 months | - | success |
| 2139 | Advance | 24 months | - | success |
| 2137 | Advance | 24 months | - | success |
| 2135 | build_wire_line | - | $45 | success |
| 2135 | Build Fire Station | (105, 15) | $500 | success |
| 2135 | Zone Industrial | (108, 18) | $135 | success |
| 2135 | Zone Commercial | (105, 18) | $150 | success |
| 2135 | Zone Commercial | (102, 18) | $160 | success |
| 2135 | Zone Residential | (108, 15) | $140 | success |
| 2135 | Zone Residential | (102, 15) | $125 | success |
| 2135 | Zone Commercial | (108, 12) | $115 | success |
| 2135 | Zone Commercial | (105, 12) | $120 | success |
| 2135 | Zone Commercial | (102, 12) | $105 | success |
| 2135 | build_road_rect | (100, 10) | $400 | success |
| 2135 | Zone Industrial | (97, 84) | - | failed |
| 2135 | Zone Commercial | (94, 84) | - | failed |
| 2135 | Zone Commercial | (91, 84) | - | failed |
| 2135 | Zone Residential | (97, 81) | $120 | success |
| 2135 | Zone Residential | (91, 81) | - | failed |
| 2135 | Zone Commercial | (97, 78) | $100 | success |
| 2135 | Zone Commercial | (94, 78) | - | failed |
| 2135 | Zone Commercial | (91, 78) | - | failed |
| 2135 | build_road_rect | (89, 76) | $320 | success |
| 2135 | Advance | 12 months | - | success |
| 2134 | Advance | 24 months | - | success |
| 2132 | Advance | 24 months | - | success |
| 2130 | build_wire_line | - | $30 | success |
| 2130 | Build Park | (94, 70) | $20 | success |
| 2130 | Zone Commercial | (97, 73) | $100 | success |
| 2130 | Zone Commercial | (94, 73) | $100 | success |
| 2130 | Zone Commercial | (91, 73) | - | failed |
| 2130 | Zone Commercial | (97, 70) | $100 | success |
| 2130 | Zone Residential | (91, 70) | $100 | success |
| 2130 | Zone Commercial | (97, 67) | $100 | success |
| 2130 | Zone Commercial | (94, 67) | $100 | success |
| 2130 | Zone Residential | (91, 67) | $100 | success |
| 2130 | build_road_rect | (89, 65) | $400 | success |
| 2130 | Advance | 12 months | - | success |
| 2129 | Advance | 24 months | - | success |
| 2127 | Advance | 24 months | - | success |
| 2125 | build_wire_line | - | $40 | success |
| 2125 | Build Park | (94, 59) | $30 | success |
| 2125 | Zone Commercial | (97, 62) | $100 | success |
| 2125 | Zone Residential | (94, 62) | $100 | success |
| 2125 | Zone Industrial | (91, 62) | $100 | success |
| 2125 | Zone Commercial | (97, 59) | $100 | success |
| 2125 | Zone Residential | (91, 59) | $115 | success |
| 2125 | Zone Commercial | (97, 56) | $130 | success |
| 2125 | Zone Residential | (94, 56) | $195 | success |
| 2125 | Zone Commercial | (91, 56) | $155 | success |
| 2125 | build_road_rect | (89, 54) | $400 | success |
| 2125 | Advance | 12 months | - | success |
| 2124 | Advance | 24 months | - | success |
| 2122 | Advance | 24 months | - | success |
| 2120 | build_wire_line | - | $20 | success |
| 2120 | Build Police Station | (94, 48) | $510 | success |
| 2120 | Zone Industrial | (97, 51) | $135 | success |
| 2120 | Zone Residential | (94, 51) | $175 | success |
| 2120 | Zone Industrial | (91, 51) | $155 | success |
| 2120 | Zone Industrial | (97, 48) | $180 | success |
| 2120 | Zone Commercial | (91, 48) | $195 | success |
| 2120 | Zone Industrial | (97, 45) | $165 | success |
| 2120 | Zone Industrial | (94, 45) | $155 | success |
| 2120 | Zone Industrial | (91, 45) | $195 | success |
| 2120 | build_road_rect | (89, 43) | $400 | success |
| 2120 | Advance | 12 months | - | success |
| 2119 | Advance | 24 months | - | success |
| 2117 | Advance | 24 months | - | success |
| 2115 | build_wire_line | - | $65 | success |
| 2115 | Build Park | (94, 37) | $40 | success |
| 2115 | Zone Commercial | (97, 40) | $155 | success |
| 2115 | Zone Residential | (94, 40) | $170 | success |
| 2115 | Zone Industrial | (91, 40) | $160 | success |
| 2115 | Zone Commercial | (97, 37) | $175 | success |
| 2115 | Zone Residential | (91, 37) | $195 | success |
| 2115 | Zone Industrial | (97, 34) | $175 | success |
| 2115 | Zone Commercial | (94, 34) | $195 | success |
| 2115 | Zone Residential | (91, 34) | $185 | success |
| 2115 | build_road_rect | (89, 32) | $400 | success |
| 2115 | Advance | 12 months | - | success |
| 2114 | Advance | 24 months | - | success |
| 2112 | Advance | 24 months | - | success |
| 2110 | build_wire_line | - | $40 | success |
| 2110 | Build Park | (94, 26) | $95 | success |
| 2110 | Zone Residential | (97, 29) | $115 | success |
| 2110 | Zone Commercial | (94, 29) | $120 | success |
| 2110 | Zone Commercial | (91, 29) | $165 | success |
| 2110 | Zone Industrial | (97, 26) | $150 | success |
| 2110 | Zone Commercial | (91, 26) | $40 | failed |
| 2110 | Zone Commercial | (97, 23) | $155 | success |
| 2110 | Zone Residential | (94, 23) | $105 | success |
| 2110 | Zone Residential | (91, 23) | - | failed |
| 2110 | build_road_rect | (89, 21) | $400 | success |
| 2110 | Advance | 12 months | - | success |
| 2109 | Advance | 24 months | - | success |
| 2107 | Advance | 24 months | - | success |
| 2105 | build_wire_line | - | $30 | success |
| 2105 | Build Fire Station | (94, 15) | $510 | success |
| 2105 | Zone Industrial | (97, 18) | $135 | success |
| 2105 | Zone Commercial | (94, 18) | $170 | success |
| 2105 | Zone Commercial | (91, 18) | $145 | success |
| 2105 | Zone Residential | (97, 15) | $190 | success |
| 2105 | Zone Residential | (91, 15) | $180 | success |
| 2105 | Zone Commercial | (97, 12) | $155 | success |
| 2105 | Zone Commercial | (94, 12) | $215 | success |
| 2105 | Zone Commercial | (91, 12) | $190 | success |
| 2105 | build_road_rect | (89, 10) | $400 | success |
| 2105 | Advance | 12 months | - | success |
| 2104 | Advance | 24 months | - | success |
| 2102 | Advance | 24 months | - | success |
| 2100 | build_wire_line | - | $30 | success |
| 2100 | Build Park | (83, 81) | $70 | success |
| 2100 | Zone Industrial | (86, 84) | $20 | failed |
| 2100 | Zone Residential | (83, 84) | $110 | success |
| 2100 | Zone Commercial | (80, 84) | $160 | success |
| 2100 | Zone Commercial | (86, 81) | - | failed |
| 2100 | Zone Residential | (80, 81) | $130 | success |
| 2100 | Zone Commercial | (86, 78) | - | failed |
| 2100 | Zone Commercial | (83, 78) | - | failed |
| 2100 | Zone Commercial | (80, 78) | - | failed |
| 2100 | build_road_rect | (78, 76) | $300 | success |
| 2100 | Zone Industrial | (86, 73) | - | failed |
| 2100 | Zone Residential | (83, 73) | - | failed |
| 2100 | Zone Commercial | (80, 73) | - | failed |
| 2100 | Zone Commercial | (86, 70) | - | failed |
| 2100 | Zone Residential | (80, 70) | $20 | failed |
| 2100 | Zone Commercial | (86, 67) | $160 | success |
| 2100 | Zone Commercial | (83, 67) | $170 | success |
| 2100 | Zone Commercial | (80, 67) | $30 | failed |
| 2100 | build_road_rect | (78, 65) | $220 | success |
| 2100 | Advance | 12 months | - | success |
| 2099 | Advance | 24 months | - | success |
| 2097 | Advance | 24 months | - | success |
| 2095 | build_wire_line | - | $35 | success |
| 2095 | Build Park | (83, 59) | - | failed |
| 2095 | Zone Residential | (86, 62) | $155 | success |
| 2095 | Zone Residential | (83, 62) | $145 | success |
| 2095 | Zone Residential | (80, 62) | - | failed |
| 2095 | Zone Residential | (86, 59) | $185 | success |
| 2095 | Zone Residential | (80, 59) | - | failed |
| 2095 | Zone Residential | (86, 56) | $115 | success |
| 2095 | Zone Residential | (83, 56) | - | failed |
| 2095 | Zone Residential | (80, 56) | - | failed |
| 2095 | build_road_rect | (78, 54) | $310 | success |
| 2095 | Advance | 12 months | - | success |
| 2094 | Advance | 24 months | - | success |
| 2092 | Advance | 24 months | - | success |
| 2090 | build_wire_line | - | $30 | success |
| 2090 | Build Police Station | (83, 48) | $500 | success |
| 2090 | Zone Residential | (86, 51) | $155 | success |
| 2090 | Zone Commercial | (83, 51) | $155 | success |
| 2090 | Zone Industrial | (80, 51) | $160 | success |
| 2090 | Zone Commercial | (86, 48) | $150 | success |
| 2090 | Zone Commercial | (80, 48) | $60 | failed |
| 2090 | Zone Commercial | (86, 45) | $165 | success |
| 2090 | Zone Residential | (83, 45) | $30 | failed |
| 2090 | Zone Residential | (80, 45) | - | failed |
| 2090 | build_road_rect | (78, 43) | $340 | success |
| 2090 | Zone Residential | (86, 40) | $150 | success |
| 2090 | Zone Commercial | (83, 40) | - | failed |
| 2090 | Zone Industrial | (80, 40) | - | failed |
| 2090 | Zone Commercial | (86, 37) | $180 | success |
| 2090 | Zone Commercial | (80, 37) | - | failed |
| 2090 | Zone Commercial | (86, 34) | $10 | failed |
| 2090 | Zone Residential | (83, 34) | - | failed |
| 2090 | Zone Residential | (80, 34) | - | failed |
| 2090 | build_road_rect | (78, 32) | $310 | success |
| 2090 | Advance | 12 months | - | success |
| 2089 | Advance | 24 months | - | success |
| 2087 | Advance | 24 months | - | success |
| 2085 | Zone Industrial | (86, 29) | - | failed |
| 2085 | Zone Commercial | (83, 29) | - | failed |
| 2085 | Zone Residential | (80, 29) | - | failed |
| 2085 | Zone Residential | (86, 26) | - | failed |
| 2085 | Zone Residential | (80, 26) | - | failed |
| 2085 | Zone Residential | (86, 23) | - | failed |
| 2085 | Zone Residential | (83, 23) | - | failed |
| 2085 | Zone Residential | (80, 23) | - | failed |
| 2085 | build_road_rect | (78, 21) | $370 | success |
| 2085 | Zone Industrial | (86, 18) | $20 | failed |
| 2085 | Zone Commercial | (83, 18) | - | failed |
| 2085 | Zone Residential | (80, 18) | - | failed |
| 2085 | Zone Residential | (86, 15) | $135 | success |
| 2085 | Zone Residential | (80, 15) | - | failed |
| 2085 | Zone Residential | (86, 12) | - | failed |
| 2085 | Zone Residential | (83, 12) | - | failed |
| 2085 | Zone Residential | (80, 12) | - | failed |
| 2085 | build_road_rect | (78, 10) | $360 | success |
| 2085 | Zone Industrial | (75, 84) | - | failed |
| 2085 | Zone Commercial | (72, 84) | - | failed |
| 2085 | Zone Residential | (69, 84) | - | failed |
| 2085 | Zone Residential | (75, 81) | - | failed |
| 2085 | Zone Residential | (69, 81) | - | failed |
| 2085 | Zone Residential | (75, 78) | - | failed |
| 2085 | Zone Residential | (72, 78) | - | failed |
| 2085 | Zone Residential | (69, 78) | $105 | success |
| 2085 | build_road_rect | (67, 76) | $380 | success |
| 2085 | Advance | 12 months | - | success |
| 2084 | Advance | 24 months | - | success |
| 2082 | Advance | 24 months | - | success |
| 2080 | build_wire_line | - | $20 | success |
| 2080 | Build Park | (61, 81) | $30 | success |
| 2080 | Zone Residential | (64, 84) | - | failed |
| 2080 | Zone Residential | (61, 84) | $120 | success |
| 2080 | Zone Commercial | (58, 84) | $105 | success |
| 2080 | Zone Residential | (64, 81) | $155 | success |
| 2080 | Zone Industrial | (58, 81) | $105 | success |
| 2080 | Zone Residential | (64, 78) | $165 | success |
| 2080 | Zone Commercial | (61, 78) | $185 | success |
| 2080 | Zone Residential | (58, 78) | $145 | success |
| 2080 | build_road_rect | (56, 76) | $400 | success |
| 2080 | Advance | 12 months | - | success |
| 2079 | Advance | 24 months | - | success |
| 2077 | Advance | 24 months | - | success |
| 2075 | build_wire_line | - | $30 | success |
| 2075 | Build Park | (50, 81) | $20 | success |
| 2075 | Zone Residential | (53, 84) | $115 | success |
| 2075 | Zone Commercial | (50, 84) | $130 | success |
| 2075 | Zone Residential | (47, 84) | $145 | success |
| 2075 | Zone Residential | (53, 81) | $125 | success |
| 2075 | Zone Industrial | (47, 81) | $185 | success |
| 2075 | Zone Residential | (53, 78) | $155 | success |
| 2075 | Zone Commercial | (50, 78) | $135 | success |
| 2075 | Zone Residential | (47, 78) | $135 | success |
| 2075 | build_road_rect | (45, 76) | $400 | success |
| 2075 | Advance | 12 months | - | success |
| 2074 | Advance | 24 months | - | success |
| 2072 | Advance | 24 months | - | success |
| 2070 | build_wire_line | - | $15 | success |
| 2070 | Build Fire Station | (39, 81) | $510 | success |
| 2070 | Zone Commercial | (42, 84) | $155 | success |
| 2070 | Zone Residential | (39, 84) | $170 | success |
| 2070 | Zone Industrial | (36, 84) | $115 | success |
| 2070 | Zone Industrial | (42, 81) | $135 | success |
| 2070 | Zone Industrial | (36, 81) | $145 | success |
| 2070 | Zone Industrial | (42, 78) | $105 | success |
| 2070 | Zone Industrial | (39, 78) | $135 | success |
| 2070 | Zone Industrial | (36, 78) | $195 | success |
| 2070 | build_road_rect | (34, 76) | $400 | success |
| 2070 | Advance | 12 months | - | success |
| 2069 | Advance | 24 months | - | success |
| 2067 | Advance | 24 months | - | success |
| 2065 | build_wire_line | - | $55 | success |
| 2065 | Build Park | (28, 81) | $20 | success |
| 2065 | Zone Commercial | (31, 84) | $115 | success |
| 2065 | Zone Residential | (28, 84) | $150 | success |
| 2065 | Zone Industrial | (25, 84) | $150 | success |
| 2065 | Zone Commercial | (31, 81) | $115 | success |
| 2065 | Zone Residential | (25, 81) | $125 | success |
| 2065 | Zone Commercial | (31, 78) | $105 | success |
| 2065 | Zone Residential | (28, 78) | $105 | success |
| 2065 | Zone Commercial | (25, 78) | $105 | success |
| 2065 | build_road_rect | (23, 76) | $400 | success |
| 2065 | Advance | 12 months | - | success |
| 2064 | Advance | 24 months | - | success |
| 2062 | Advance | 24 months | - | success |
| 2060 | build_wire_line | - | $60 | success |
| 2060 | Build Park | (17, 81) | $20 | success |
| 2060 | Zone Residential | (20, 84) | $135 | success |
| 2060 | Zone Commercial | (17, 84) | $130 | success |
| 2060 | Zone Industrial | (14, 84) | $115 | success |
| 2060 | Zone Commercial | (20, 81) | $120 | success |
| 2060 | Zone Commercial | (14, 81) | $120 | success |
| 2060 | Zone Commercial | (20, 78) | $100 | success |
| 2060 | Zone Residential | (17, 78) | $105 | success |
| 2060 | Zone Residential | (14, 78) | $105 | success |
| 2060 | build_road_rect | (12, 76) | $400 | success |
| 2060 | Advance | 12 months | - | success |
| 2059 | Advance | 24 months | - | success |
| 2057 | Advance | 24 months | - | success |
| 2055 | build_wire_line | - | $20 | success |
| 2055 | Build Police Station | (72, 70) | - | failed |
| 2055 | Zone Industrial | (75, 73) | - | failed |
| 2055 | Zone Commercial | (72, 73) | - | failed |
| 2055 | Zone Commercial | (69, 73) | $145 | success |
| 2055 | Zone Residential | (75, 70) | - | failed |
| 2055 | Zone Residential | (69, 70) | $105 | success |
| 2055 | Zone Commercial | (75, 67) | - | failed |
| 2055 | Zone Commercial | (72, 67) | - | failed |
| 2055 | Zone Commercial | (69, 67) | $105 | success |
| 2055 | build_road_rect | (67, 65) | $310 | success |
| 2055 | Advance | 12 months | - | success |
| 2054 | Advance | 24 months | - | success |
| 2052 | Advance | 24 months | - | success |
| 2050 | build_wire_line | - | $35 | success |
| 2050 | Build Park | (72, 59) | $85 | success |
| 2050 | Zone Residential | (75, 62) | - | failed |
| 2050 | Zone Residential | (72, 62) | - | failed |
| 2050 | Zone Residential | (69, 62) | $125 | success |
| 2050 | Zone Residential | (75, 59) | - | failed |
| 2050 | Zone Residential | (69, 59) | $135 | success |
| 2050 | Zone Residential | (75, 56) | - | failed |
| 2050 | Zone Residential | (72, 56) | $40 | failed |
| 2050 | Zone Residential | (69, 56) | $155 | success |
| 2050 | build_road_rect | (67, 54) | $310 | success |
| 2050 | Advance | 12 months | - | success |
| 2049 | Advance | 24 months | - | success |
| 2047 | Advance | 24 months | - | success |
| 2045 | build_wire_line | - | $20 | success |
| 2045 | Build Park | (72, 48) | - | failed |
| 2045 | Zone Residential | (75, 51) | - | failed |
| 2045 | Zone Commercial | (72, 51) | - | failed |
| 2045 | Zone Residential | (69, 51) | $110 | success |
| 2045 | Zone Commercial | (75, 48) | - | failed |
| 2045 | Zone Commercial | (69, 48) | $125 | success |
| 2045 | Zone Commercial | (75, 45) | - | failed |
| 2045 | Zone Residential | (72, 45) | - | failed |
| 2045 | Zone Industrial | (69, 45) | $175 | success |
| 2045 | build_road_rect | (67, 43) | $310 | success |
| 2045 | Advance | 12 months | - | success |
| 2044 | Advance | 24 months | - | success |
| 2042 | Advance | 24 months | - | success |
| 2040 | build_wire_line | - | $40 | success |
| 2040 | Build Fire Station | (72, 37) | $510 | success |
| 2040 | Zone Commercial | (75, 40) | - | failed |
| 2040 | Zone Residential | (72, 40) | $130 | success |
| 2040 | Zone Industrial | (69, 40) | $160 | success |
| 2040 | Zone Commercial | (75, 37) | $195 | success |
| 2040 | Zone Residential | (69, 37) | $195 | success |
| 2040 | Zone Commercial | (75, 34) | $130 | success |
| 2040 | Zone Residential | (72, 34) | $195 | success |
| 2040 | Zone Commercial | (69, 34) | $185 | success |
| 2040 | build_road_rect | (67, 32) | $310 | success |
| 2040 | Advance | 12 months | - | success |
| 2039 | Advance | 24 months | - | success |
| 2037 | Advance | 24 months | - | success |
| 2035 | build_wire_line | - | $40 | success |
| 2035 | Build Park | (72, 26) | $30 | success |
| 2035 | Zone Industrial | (75, 29) | - | failed |
| 2035 | Zone Commercial | (72, 29) | $180 | success |
| 2035 | Zone Residential | (69, 29) | $150 | success |
| 2035 | Zone Residential | (75, 26) | $170 | success |
| 2035 | Zone Residential | (69, 26) | $165 | success |
| 2035 | Zone Residential | (75, 23) | $165 | success |
| 2035 | Zone Residential | (72, 23) | $195 | success |
| 2035 | Zone Residential | (69, 23) | $125 | success |
| 2035 | build_road_rect | (67, 21) | $400 | success |
| 2035 | Advance | 12 months | - | success |
| 2034 | Advance | 24 months | - | success |
| 2032 | Advance | 24 months | - | success |
| 2030 | build_wire_line | - | $15 | success |
| 2030 | Build Park | (72, 15) | $30 | success |
| 2030 | Zone Commercial | (75, 18) | $145 | success |
| 2030 | Zone Industrial | (72, 18) | $160 | success |
| 2030 | Zone Industrial | (69, 18) | $160 | success |
| 2030 | Zone Residential | (75, 15) | $140 | success |
| 2030 | Zone Residential | (69, 15) | $185 | success |
| 2030 | Zone Industrial | (75, 12) | $115 | success |
| 2030 | Zone Industrial | (72, 12) | $140 | success |
| 2030 | Zone Industrial | (69, 12) | $185 | success |
| 2030 | build_road_rect | (67, 10) | $400 | success |
| 2030 | Advance | 12 months | - | success |
| 2029 | Advance | 24 months | - | success |
| 2027 | Advance | 24 months | - | success |
| 2025 | build_wire_line | - | $20 | success |
| 2025 | Build Police Station | (61, 70) | $500 | success |
| 2025 | Zone Industrial | (64, 73) | $145 | success |
| 2025 | Zone Commercial | (61, 73) | $180 | success |
| 2025 | Zone Industrial | (58, 73) | $105 | success |
| 2025 | Zone Residential | (64, 70) | $130 | success |
| 2025 | Zone Commercial | (58, 70) | $145 | success |
| 2025 | Zone Industrial | (64, 67) | $100 | success |
Population 105,760
Funds $0
Year 2260
Score 231
Class Metropolis
Approval
Demand
Population Breakdown
Residential 2,784
Commercial 153
Industrial 160
Assessed Value
Value $57,820,000
Top Problems
Infrastructure
7 Police
9 Fire
2 Power
1 Ports
1 Airports
1 Stadiums
2954 Roads
0 Rail
Power
Powered / Total 196 / 402 (49%)
Budget
Tax Rate 7%
Cash Flow $0
Fire 100%
Police 5%
Road 100%
Environment
Crime 75
Pollution 54
Land Value 52