Sunset Summit
Ended
| Year | Action | Detail | Cost | Result |
|---|---|---|---|---|
| 2137 | Advance | 12 months | - | success |
| 2136 | Advance | 24 months | - | success |
| 2134 | Advance | 24 months | - | success |
| 2132 | Advance | 12 months | - | success |
| 2131 | Advance | 24 months | - | success |
| 2129 | Advance | 24 months | - | success |
| 2127 | Advance | 12 months | - | success |
| 2126 | Advance | 24 months | - | success |
| 2124 | Advance | 24 months | - | success |
| 2122 | Advance | 12 months | - | success |
| 2121 | Advance | 24 months | - | success |
| 2119 | Advance | 24 months | - | success |
| 2117 | Advance | 12 months | - | success |
| 2116 | Advance | 24 months | - | success |
| 2114 | Advance | 24 months | - | success |
| 2112 | Advance | 12 months | - | success |
| 2111 | Advance | 24 months | - | success |
| 2109 | Advance | 24 months | - | success |
| 2107 | Advance | 12 months | - | success |
| 2106 | Advance | 24 months | - | success |
| 2104 | Advance | 24 months | - | success |
| 2102 | Advance | 12 months | - | success |
| 2101 | Advance | 24 months | - | success |
| 2099 | Advance | 24 months | - | success |
| 2097 | Advance | 12 months | - | success |
| 2096 | Advance | 24 months | - | success |
| 2094 | Advance | 24 months | - | success |
| 2092 | Advance | 12 months | - | success |
| 2091 | Advance | 24 months | - | success |
| 2089 | Advance | 24 months | - | success |
| 2087 | Advance | 12 months | - | success |
| 2086 | Advance | 24 months | - | success |
| 2084 | Advance | 24 months | - | success |
| 2082 | Advance | 12 months | - | success |
| 2081 | Advance | 24 months | - | success |
| 2079 | Advance | 24 months | - | success |
| 2077 | Advance | 12 months | - | success |
| 2076 | Advance | 24 months | - | success |
| 2074 | Advance | 24 months | - | success |
| 2072 | Advance | 12 months | - | success |
| 2071 | Advance | 24 months | - | success |
| 2069 | Advance | 24 months | - | success |
| 2067 | Advance | 12 months | - | success |
| 2066 | Advance | 24 months | - | success |
| 2064 | Advance | 24 months | - | success |
| 2062 | Advance | 12 months | - | success |
| 2061 | Advance | 24 months | - | success |
| 2059 | Advance | 24 months | - | success |
| 2057 | Advance | 24 months | - | success |
| 2055 | Advance | 24 months | - | success |
| 2053 | Advance | 24 months | - | success |
| 2051 | Advance | 24 months | - | success |
| 2049 | Advance | 24 months | - | success |
| 2047 | Advance | 24 months | - | success |
| 2045 | Advance | 24 months | - | success |
| 2043 | Advance | 24 months | - | success |
| 2041 | Advance | 24 months | - | success |
| 2039 | Advance | 24 months | - | success |
| 2037 | Advance | 24 months | - | success |
| 2035 | Advance | 24 months | - | success |
| 2033 | Advance | 24 months | - | success |
| 2031 | Advance | 24 months | - | success |
| 2029 | build_wire_line | - | $5 | success |
| 2029 | Build Fire Station | (17, 75) | $510 | success |
| 2029 | Zone Industrial | (20, 78) | $120 | success |
| 2029 | Zone Commercial | (17, 78) | $205 | success |
| 2029 | Zone Residential | (14, 78) | $175 | success |
| 2029 | Zone Residential | (20, 75) | $160 | success |
| 2029 | Zone Residential | (14, 75) | $170 | success |
| 2029 | Zone Residential | (20, 72) | $165 | success |
| 2029 | Zone Residential | (17, 72) | $140 | success |
| 2029 | Zone Residential | (14, 72) | $105 | success |
| 2029 | build_road_rect | (12, 70) | $400 | success |
| 2029 | Advance | 24 months | - | success |
| 2027 | Advance | 24 months | - | success |
| 2025 | build_wire_line | - | $50 | success |
| 2025 | Build Park | (72, 64) | $20 | success |
| 2025 | Zone Industrial | (75, 67) | $100 | success |
| 2025 | Zone Commercial | (72, 67) | $130 | success |
| 2025 | Zone Residential | (69, 67) | $115 | success |
| 2025 | Zone Residential | (75, 64) | $120 | success |
| 2025 | Zone Residential | (69, 64) | $120 | success |
| 2025 | Zone Residential | (75, 61) | $105 | success |
| 2025 | Zone Residential | (72, 61) | $105 | success |
| 2025 | Zone Residential | (69, 61) | $105 | success |
| 2025 | build_road_rect | (67, 59) | $400 | success |
| 2025 | Advance | 24 months | - | success |
| 2023 | Advance | 24 months | - | success |
| 2021 | build_wire_line | - | $20 | success |
| 2021 | Build Park | (72, 53) | $30 | success |
| 2021 | Zone Residential | (75, 56) | $145 | success |
| 2021 | Zone Residential | (72, 56) | $190 | success |
| 2021 | Zone Residential | (69, 56) | $150 | success |
| 2021 | Zone Residential | (75, 53) | $170 | success |
| 2021 | Zone Residential | (69, 53) | $185 | success |
| 2021 | Zone Residential | (75, 50) | $155 | success |
| 2021 | Zone Residential | (72, 50) | $145 | success |
| 2021 | Zone Residential | (69, 50) | $135 | success |
| 2021 | build_road_rect | (67, 48) | $400 | success |
| 2021 | Advance | 24 months | - | success |
| 2019 | Advance | 24 months | - | success |
| 2017 | build_wire_line | - | $25 | success |
| 2017 | Build Police Station | (72, 42) | $500 | success |
| 2017 | Zone Industrial | (75, 45) | $115 | success |
| 2017 | Zone Residential | (72, 45) | $120 | success |
| 2017 | Zone Residential | (69, 45) | $100 | success |
| 2017 | Zone Residential | (75, 42) | $120 | success |
| 2017 | Zone Residential | (69, 42) | $105 | success |
| 2017 | Zone Commercial | (75, 39) | $105 | success |
| 2017 | Zone Residential | (72, 39) | $105 | success |
| 2017 | Zone Residential | (69, 39) | $105 | success |
| 2017 | build_road_rect | (67, 37) | $400 | success |
| 2017 | Advance | 24 months | - | success |
| 2015 | Advance | 24 months | - | success |
| 2013 | build_wire_line | - | $30 | success |
| 2013 | Build Park | (72, 31) | $20 | success |
| 2013 | Zone Residential | (75, 34) | $115 | success |
| 2013 | Zone Residential | (72, 34) | $120 | success |
| 2013 | Zone Residential | (69, 34) | $105 | success |
| 2013 | Zone Residential | (75, 31) | $120 | success |
| 2013 | Zone Residential | (69, 31) | $105 | success |
| 2013 | Zone Residential | (75, 28) | $105 | success |
| 2013 | Zone Residential | (72, 28) | $105 | success |
| 2013 | Zone Residential | (69, 28) | $110 | success |
| 2013 | build_road_rect | (67, 26) | $400 | success |
| 2013 | Advance | 24 months | - | success |
| 2011 | Advance | 24 months | - | success |
| 2009 | build_wire_line | - | $30 | success |
| 2009 | Build Park | (72, 20) | $30 | success |
| 2009 | Zone Residential | (75, 23) | $155 | success |
| 2009 | Zone Residential | (72, 23) | $180 | success |
| 2009 | Zone Industrial | (69, 23) | $145 | success |
| 2009 | Zone Commercial | (75, 20) | $185 | success |
| 2009 | Zone Residential | (69, 20) | $195 | success |
| 2009 | Zone Commercial | (75, 17) | $160 | success |
| 2009 | Zone Residential | (72, 17) | $175 | success |
| 2009 | Zone Residential | (69, 17) | $195 | success |
| 2009 | build_road_rect | (67, 15) | $400 | success |
| 2009 | Advance | 24 months | - | success |
| 2007 | Advance | 24 months | - | success |
| 2005 | build_wire_line | - | $50 | success |
| 2005 | Build Fire Station | (72, 9) | $500 | success |
| 2005 | Zone Residential | (75, 12) | $155 | success |
| 2005 | Zone Commercial | (72, 12) | $120 | success |
| 2005 | Zone Residential | (69, 12) | $145 | success |
| 2005 | Zone Residential | (75, 9) | $150 | success |
| 2005 | Zone Industrial | (69, 9) | $195 | success |
| 2005 | Zone Residential | (75, 6) | $115 | success |
| 2005 | Zone Commercial | (72, 6) | $125 | success |
| 2005 | Zone Residential | (69, 6) | $105 | success |
| 2005 | build_road_rect | (67, 4) | $400 | success |
| 2005 | Advance | 24 months | - | success |
| 2003 | Advance | 24 months | - | success |
| 2001 | Advance | 24 months | - | success |
| 1999 | Advance | 24 months | - | success |
| 1997 | Zone Residential | (64, 67) | - | failed |
| 1997 | Zone Residential | (61, 67) | - | failed |
| 1997 | Zone Industrial | (58, 67) | - | failed |
| 1997 | Zone Commercial | (64, 64) | - | failed |
| 1997 | Zone Commercial | (58, 64) | - | failed |
| 1997 | Zone Residential | (64, 61) | - | failed |
| 1997 | Zone Residential | (61, 61) | - | failed |
| 1997 | Zone Residential | (58, 61) | - | failed |
| 1997 | build_road_rect | (56, 59) | - | failed |
| 1997 | Zone Residential | (53, 67) | - | failed |
| 1997 | Zone Residential | (50, 67) | - | failed |
| 1997 | Zone Industrial | (47, 67) | - | failed |
| 1997 | Zone Commercial | (53, 64) | - | failed |
| 1997 | Zone Commercial | (47, 64) | - | failed |
| 1997 | Zone Residential | (53, 61) | - | failed |
| 1997 | Zone Residential | (50, 61) | - | failed |
| 1997 | Zone Residential | (47, 61) | - | failed |
| 1997 | build_road_rect | (45, 59) | - | failed |
| 1997 | Zone Residential | (42, 67) | - | failed |
| 1997 | Zone Residential | (39, 67) | - | failed |
| 1997 | Zone Industrial | (36, 67) | - | failed |
| 1997 | Zone Commercial | (42, 64) | - | failed |
| 1997 | Zone Commercial | (36, 64) | - | failed |
| 1997 | Zone Residential | (42, 61) | - | failed |
| 1997 | Zone Residential | (39, 61) | $40 | failed |
| 1997 | Zone Residential | (36, 61) | $20 | failed |
| 1997 | Set Budget | - | - | success |
| 1997 | build_road_rect | (34, 59) | $280 | success |
| 1997 | Build Airport | (28, 64) | $10,195 | success |
| 1997 | Advance | 24 months | - | success |
| 1995 | Advance | 24 months | - | success |
| 1993 | build_wire_line | - | $55 | success |
| 1993 | Build Park | (17, 64) | $20 | success |
| 1993 | Zone Residential | (20, 67) | $100 | success |
| 1993 | Zone Commercial | (17, 67) | $145 | success |
| 1993 | Zone Residential | (14, 67) | $135 | success |
| 1993 | Zone Residential | (20, 64) | $120 | success |
| 1993 | Zone Industrial | (14, 64) | $200 | success |
| 1993 | Zone Residential | (20, 61) | $165 | success |
| 1993 | Zone Commercial | (17, 61) | $190 | success |
| 1993 | Zone Residential | (14, 61) | $185 | success |
| 1993 | build_road_rect | (12, 59) | $400 | success |
| 1993 | Build Airport | (17, 64) | $110 | failed |
| 1993 | Advance | 24 months | - | success |
| 1991 | Advance | 24 months | - | success |
| 1989 | build_wire_line | - | $40 | success |
| 1989 | Build Park | (61, 53) | $20 | success |
| 1989 | Zone Commercial | (64, 56) | $115 | success |
| 1989 | Zone Industrial | (61, 56) | $120 | success |
| 1989 | Zone Industrial | (58, 56) | $100 | success |
| 1989 | Zone Industrial | (64, 53) | $120 | success |
| 1989 | Zone Industrial | (58, 53) | $180 | success |
| 1989 | Zone Industrial | (64, 50) | $125 | success |
| 1989 | Zone Industrial | (61, 50) | $195 | success |
| 1989 | Zone Residential | (58, 50) | $125 | success |
| 1989 | build_road_rect | (56, 48) | $370 | success |
| 1989 | Build Airport | (61, 53) | $140 | failed |
| 1989 | Advance | 24 months | - | success |
| 1987 | Advance | 24 months | - | success |
| 1985 | build_wire_line | - | $25 | success |
| 1985 | Build Police Station | (61, 42) | $500 | success |
| 1985 | Zone Commercial | (64, 45) | $115 | success |
| 1985 | Zone Residential | (61, 45) | $130 | success |
| 1985 | Zone Industrial | (58, 45) | - | failed |
| 1985 | Zone Commercial | (64, 42) | $120 | success |
| 1985 | Zone Residential | (58, 42) | - | failed |
| 1985 | Zone Industrial | (64, 39) | $105 | success |
| 1985 | Zone Commercial | (61, 39) | $105 | success |
| 1985 | Zone Residential | (58, 39) | - | failed |
| 1985 | build_road_rect | (56, 37) | $310 | success |
| 1985 | Build Airport | (61, 42) | $170 | failed |
| 1985 | Advance | 24 months | - | success |
| 1983 | Advance | 24 months | - | success |
| 1981 | build_wire_line | - | $50 | success |
| 1981 | Build Park | (61, 31) | $105 | success |
| 1981 | Zone Industrial | (64, 34) | $100 | success |
| 1981 | Zone Commercial | (61, 34) | $145 | success |
| 1981 | Zone Residential | (58, 34) | - | failed |
| 1981 | Zone Residential | (64, 31) | $120 | success |
| 1981 | Zone Residential | (58, 31) | - | failed |
| 1981 | Zone Residential | (64, 28) | $120 | success |
| 1981 | Zone Residential | (61, 28) | $140 | success |
| 1981 | Zone Residential | (58, 28) | - | failed |
| 1981 | build_road_rect | (56, 26) | $300 | success |
| 1981 | Build Airport | (61, 31) | - | failed |
| 1981 | Advance | 24 months | - | success |
| 1979 | Advance | 24 months | - | success |
| 1977 | Build Airport | (61, 31) | - | failed |
| 1977 | Advance | 24 months | - | success |
| 1975 | Advance | 24 months | - | success |
| 1973 | build_wire_line | - | $40 | success |
| 1973 | Build Park | (61, 20) | $95 | success |
| 1973 | Zone Residential | (64, 23) | $100 | success |
| 1973 | Zone Residential | (61, 23) | $145 | success |
| 1973 | Zone Industrial | (58, 23) | - | failed |
| 1973 | Zone Commercial | (64, 20) | $120 | success |
| 1973 | Zone Commercial | (58, 20) | - | failed |
| 1973 | Zone Residential | (64, 17) | $180 | success |
| 1973 | Zone Residential | (61, 17) | $30 | failed |
| 1973 | Zone Residential | (58, 17) | - | failed |
| 1973 | build_road_rect | (56, 15) | $270 | success |
| 1973 | Build Nuclear Power | (18, 4) | $5,170 | success |
| 1973 | Build Nuclear Power | (34, 2) | - | failed |
| 1973 | Build Nuclear Power | (34, 50) | - | failed |
| 1973 | Build Nuclear Power | (10, 26) | - | failed |
| 1973 | Build Nuclear Power | (58, 26) | $30 | failed |
| 1973 | Build Nuclear Power | (34, 8) | - | failed |
| 1973 | Build Nuclear Power | (34, 44) | $60 | failed |
| 1973 | Build Nuclear Power | (16, 26) | - | failed |
| 1973 | Build Nuclear Power | (52, 26) | - | failed |
| 1973 | Build Nuclear Power | (22, 38) | - | failed |
| 1973 | Build Nuclear Power | (46, 14) | - | failed |
| 1973 | Build Nuclear Power | (22, 14) | - | failed |
| 1973 | Build Nuclear Power | (46, 38) | - | failed |
| 1973 | Build Nuclear Power | (34, 14) | - | failed |
| 1973 | Build Nuclear Power | (34, 38) | $10 | failed |
| 1973 | Build Nuclear Power | (22, 26) | - | failed |
| 1973 | Build Nuclear Power | (46, 26) | - | failed |
| 1973 | Build Nuclear Power | (34, 26) | - | failed |
| 1973 | Build Nuclear Power | (40, 26) | - | failed |
| 1973 | Build Nuclear Power | (28, 26) | - | failed |
| 1973 | Build Nuclear Power | (34, 32) | - | failed |
| 1973 | Build Nuclear Power | (34, 20) | - | failed |
| 1973 | Build Airport | (61, 20) | $220 | failed |
| 1973 | Advance | 24 months | - | success |
| 1971 | Advance | 24 months | - | success |
| 1969 | build_wire_line | - | $10 | success |
| 1969 | Build Fire Station | (61, 9) | $500 | success |
| 1969 | Zone Commercial | (64, 12) | $135 | success |
| 1969 | Zone Residential | (61, 12) | $135 | success |
| 1969 | Zone Commercial | (58, 12) | $100 | success |
| 1969 | Zone Commercial | (64, 9) | $130 | success |
| 1969 | Zone Residential | (58, 9) | $105 | success |
| 1969 | Zone Commercial | (64, 6) | $115 | success |
| 1969 | Zone Commercial | (61, 6) | $120 | success |
| 1969 | Zone Commercial | (58, 6) | $105 | success |
| 1969 | build_road_rect | (56, 4) | $400 | success |
| 1969 | Zone Commercial | (53, 56) | - | failed |
| 1969 | Zone Residential | (50, 56) | - | failed |
| 1969 | Zone Commercial | (47, 56) | - | failed |
| 1969 | Zone Commercial | (53, 53) | - | failed |
| 1969 | Zone Residential | (47, 53) | $105 | success |
| 1969 | Zone Commercial | (53, 50) | - | failed |
| 1969 | Zone Commercial | (50, 50) | - | failed |
| 1969 | Zone Commercial | (47, 50) | $105 | success |
| 1969 | build_road_rect | (45, 48) | $320 | success |
| 1969 | Zone Commercial | (53, 12) | - | failed |
| 1969 | Zone Residential | (50, 12) | - | failed |
| 1969 | Zone Commercial | (47, 12) | - | failed |
| 1969 | Zone Commercial | (53, 9) | $130 | success |
| 1969 | Zone Residential | (47, 9) | - | failed |
| 1969 | Zone Commercial | (53, 6) | $130 | success |
| 1969 | Zone Commercial | (50, 6) | - | failed |
| 1969 | Zone Commercial | (47, 6) | - | failed |
| 1969 | build_road_rect | (45, 4) | $300 | success |
| 1969 | Build Airport | (50, 9) | $40 | failed |
| 1969 | Advance | 24 months | - | success |
| 1967 | Advance | 24 months | - | success |
| 1965 | build_wire_line | - | $55 | success |
| 1965 | Build Park | (39, 53) | $20 | success |
| 1965 | Zone Residential | (42, 56) | $115 | success |
| 1965 | Zone Commercial | (39, 56) | $120 | success |
| 1965 | Zone Residential | (36, 56) | $165 | success |
| 1965 | Zone Residential | (42, 53) | $130 | success |
| 1965 | Zone Industrial | (36, 53) | $175 | success |
| 1965 | Zone Residential | (42, 50) | $155 | success |
| 1965 | Zone Commercial | (39, 50) | $180 | success |
| 1965 | Zone Residential | (36, 50) | $145 | success |
| 1965 | build_road_rect | (34, 48) | $400 | success |
| 1965 | Build Airport | (39, 53) | $120 | failed |
| 1965 | Advance | 24 months | - | success |
| 1963 | Advance | 24 months | - | success |
| 1961 | build_wire_line | - | $10 | success |
| 1961 | Build Park | (39, 9) | $105 | success |
| 1961 | Zone Commercial | (42, 12) | - | failed |
| 1961 | Zone Residential | (39, 12) | $105 | success |
| 1961 | Zone Industrial | (36, 12) | $105 | success |
| 1961 | Zone Industrial | (42, 9) | - | failed |
| 1961 | Zone Industrial | (36, 9) | $105 | success |
| 1961 | Zone Industrial | (42, 6) | - | failed |
| 1961 | Zone Industrial | (39, 6) | $130 | success |
| 1961 | Zone Industrial | (36, 6) | $100 | success |
| 1961 | build_road_rect | (34, 4) | $280 | success |
| 1961 | Build Airport | (39, 9) | - | failed |
| 1961 | Advance | 24 months | - | success |
| 1959 | Advance | 24 months | - | success |
| 1957 | build_wire_line | - | $10 | success |
| 1957 | Build Police Station | (28, 53) | $500 | success |
| 1957 | Zone Residential | (31, 56) | $115 | success |
| 1957 | Zone Residential | (28, 56) | $125 | success |
| 1957 | Zone Industrial | (25, 56) | $165 | success |
| 1957 | Zone Industrial | (31, 53) | $115 | success |
| 1957 | Zone Commercial | (25, 53) | $195 | success |
| 1957 | Zone Industrial | (31, 50) | $155 | success |
| 1957 | Zone Industrial | (28, 50) | $185 | success |
| 1957 | Zone Residential | (25, 50) | $195 | success |
| 1957 | build_road_rect | (23, 48) | $400 | success |
| 1957 | Build Airport | (28, 53) | $310 | failed |
| 1957 | Advance | 24 months | - | success |
| 1955 | Advance | 24 months | - | success |
| 1953 | build_wire_line | - | $10 | success |
| 1953 | Build Park | (28, 9) | $20 | success |
| 1953 | Zone Commercial | (31, 12) | $105 | success |
| 1953 | Zone Residential | (28, 12) | $105 | success |
| 1953 | Zone Industrial | (25, 12) | $150 | success |
| 1953 | Zone Commercial | (31, 9) | $120 | success |
| 1953 | Zone Residential | (25, 9) | $190 | success |
| 1953 | Zone Commercial | (31, 6) | $165 | success |
| 1953 | Zone Residential | (28, 6) | $180 | success |
| 1953 | Zone Commercial | (25, 6) | $200 | success |
| 1953 | Set Budget | - | - | success |
| 1953 | build_road_rect | (23, 4) | $400 | success |
| 1953 | Build Airport | (28, 9) | $230 | failed |
| 1953 | Advance | 24 months | - | success |
| 1951 | Advance | 24 months | - | success |
| 1949 | build_wire_line | - | $25 | success |
| 1949 | Build Park | (17, 53) | $20 | success |
| 1949 | Zone Residential | (20, 56) | $100 | success |
| 1949 | Zone Commercial | (17, 56) | $145 | success |
| 1949 | Zone Residential | (14, 56) | $155 | success |
| 1949 | Zone Residential | (20, 53) | $120 | success |
| 1949 | Zone Industrial | (14, 53) | $180 | success |
| 1949 | Zone Residential | (20, 50) | $165 | success |
| 1949 | Zone Commercial | (17, 50) | $110 | success |
| 1949 | Zone Residential | (14, 50) | $115 | success |
| 1949 | build_road_rect | (12, 48) | $400 | success |
| 1949 | Build Airport | (17, 53) | $290 | failed |
| 1949 | Advance | 24 months | - | success |
| 1947 | Advance | 24 months | - | success |
| 1945 | build_wire_line | - | $15 | success |
| 1945 | Build Fire Station | (17, 42) | $500 | success |
| 1945 | Zone Commercial | (20, 45) | $100 | success |
| 1945 | Zone Commercial | (17, 45) | $125 | success |
| 1945 | Zone Commercial | (14, 45) | $115 | success |
| 1945 | Zone Residential | (20, 42) | $145 | success |
| 1945 | Zone Residential | (14, 42) | $130 | success |
| 1945 | Zone Commercial | (20, 39) | $165 | success |
| 1945 | Zone Commercial | (17, 39) | $140 | success |
| 1945 | Zone Commercial | (14, 39) | $135 | success |
| 1945 | build_road_rect | (12, 37) | $400 | success |
| 1945 | Advance | 24 months | - | success |
| 1943 | Advance | 24 months | - | success |
| 1941 | build_wire_line | - | $25 | success |
| 1941 | Build Park | (17, 31) | $40 | success |
| 1941 | Zone Industrial | (20, 34) | $140 | success |
| 1941 | Zone Commercial | (17, 34) | $175 | success |
| 1941 | Zone Residential | (14, 34) | $155 | success |
| 1941 | Zone Residential | (20, 31) | $125 | success |
| 1941 | Zone Residential | (14, 31) | $160 | success |
| 1941 | Zone Residential | (20, 28) | $145 | success |
| 1941 | Zone Residential | (17, 28) | $160 | success |
| 1941 | Zone Residential | (14, 28) | $185 | success |
| 1941 | build_road_rect | (12, 26) | $400 | success |
| 1941 | Advance | 24 months | - | success |
| 1939 | Advance | 24 months | - | success |
| 1937 | build_wire_line | - | $15 | success |
| 1937 | Build Park | (17, 20) | $40 | success |
| 1937 | Zone Commercial | (20, 23) | $140 | success |
| 1937 | Zone Industrial | (17, 23) | $165 | success |
| 1937 | Zone Residential | (14, 23) | $155 | success |
| 1937 | Zone Industrial | (20, 20) | $155 | success |
| 1937 | Zone Industrial | (14, 20) | $190 | success |
| 1937 | Zone Industrial | (20, 17) | $115 | success |
| 1937 | Zone Industrial | (17, 17) | $150 | success |
| 1937 | Zone Industrial | (14, 17) | $185 | success |
| 1937 | build_road_rect | (12, 15) | $390 | success |
| 1937 | Advance | 24 months | - | success |
| 1935 | Advance | 24 months | - | success |
| 1933 | Advance | 12 months | - | success |
| 1932 | Advance | 24 months | - | success |
| 1930 | Advance | 24 months | - | success |
| 1928 | Advance | 24 months | - | success |
| 1926 | Advance | 24 months | - | success |
| 1924 | Build Seaport | (17, 9) | $3,260 | success |
| 1924 | Advance | 24 months | - | success |
| 1922 | Advance | 24 months | - | success |
| 1920 | build_wire_line | - | $25 | success |
| 1920 | Build Police Station | (50, 42) | - | failed |
| 1920 | Zone Commercial | (53, 45) | - | failed |
| 1920 | Zone Residential | (50, 45) | - | failed |
| 1920 | Zone Industrial | (47, 45) | $115 | success |
| 1920 | Zone Commercial | (53, 42) | - | failed |
| 1920 | Zone Residential | (47, 42) | $150 | success |
| 1920 | Zone Industrial | (53, 39) | - | failed |
| 1920 | Zone Commercial | (50, 39) | - | failed |
| 1920 | Zone Residential | (47, 39) | $130 | success |
| 1920 | build_road_rect | (45, 37) | $310 | success |
| 1920 | Zone Commercial | (53, 34) | - | failed |
| 1920 | Zone Residential | (50, 34) | - | failed |
| 1920 | Zone Industrial | (47, 34) | $110 | success |
| 1920 | Zone Commercial | (53, 31) | - | failed |
| 1920 | Zone Residential | (47, 31) | - | failed |
| 1920 | Zone Industrial | (53, 28) | - | failed |
| 1920 | Zone Commercial | (50, 28) | - | failed |
| 1920 | Zone Residential | (47, 28) | - | failed |
| 1920 | build_road_rect | (45, 26) | $280 | success |
| 1920 | Zone Commercial | (53, 23) | - | failed |
| 1920 | Zone Residential | (50, 23) | - | failed |
| 1920 | Zone Industrial | (47, 23) | - | failed |
| 1920 | Zone Commercial | (53, 20) | - | failed |
| 1920 | Zone Residential | (47, 20) | - | failed |
| 1920 | Zone Industrial | (53, 17) | - | failed |
| 1920 | Zone Commercial | (50, 17) | - | failed |
| 1920 | Zone Residential | (47, 17) | - | failed |
| 1920 | build_road_rect | (45, 15) | $270 | success |
| 1920 | Build Seaport | (50, 20) | - | failed |
| 1920 | Build Stadium | (39, 42) | $5,190 | success |
| 1920 | Advance | 24 months | - | success |
| 1918 | Advance | 24 months | - | success |
| 1916 | Build Park | (39, 20) | $25 | success |
| 1916 | Zone Industrial | (42, 23) | $115 | success |
| 1916 | Zone Commercial | (39, 23) | $105 | success |
| 1916 | Zone Residential | (36, 23) | - | failed |
| 1916 | Zone Residential | (42, 20) | $130 | success |
| 1916 | Zone Residential | (36, 20) | - | failed |
| 1916 | Zone Residential | (42, 17) | - | failed |
| 1916 | Zone Residential | (39, 17) | $110 | success |
| 1916 | Zone Residential | (36, 17) | $100 | success |
| 1916 | build_road_rect | (34, 15) | $310 | success |
| 1916 | Advance | 24 months | - | success |
| 1914 | Advance | 24 months | - | success |
| 1912 | build_wire_line | - | $15 | success |
| 1912 | Build Park | (28, 42) | $20 | success |
| 1912 | Zone Residential | (31, 45) | $115 | success |
| 1912 | Zone Commercial | (28, 45) | $130 | success |
| 1912 | Zone Residential | (25, 45) | $135 | success |
| 1912 | Zone Residential | (31, 42) | $120 | success |
| 1912 | Zone Industrial | (25, 42) | $190 | success |
| 1912 | Zone Residential | (31, 39) | $125 | success |
| 1912 | Zone Commercial | (28, 39) | $170 | success |
| 1912 | Zone Residential | (25, 39) | $195 | success |
| 1912 | build_road_rect | (23, 37) | $400 | success |
| 1912 | Advance | 24 months | - | success |
| 1910 | Advance | 24 months | - | success |
| 1908 | build_wire_line | - | $10 | success |
| 1908 | Build Fire Station | (28, 31) | $510 | success |
| 1908 | Zone Commercial | (31, 34) | $100 | success |
| 1908 | Zone Industrial | (28, 34) | $145 | success |
| 1908 | Zone Industrial | (25, 34) | $175 | success |
| 1908 | Zone Residential | (31, 31) | $115 | success |
| 1908 | Zone Industrial | (25, 31) | $220 | success |
| 1908 | Zone Residential | (31, 28) | $115 | success |
| 1908 | Zone Industrial | (28, 28) | $130 | success |
| 1908 | Zone Industrial | (25, 28) | $135 | success |
| 1908 | build_road_rect | (23, 26) | $400 | success |
Population 52,440
Funds $0
Year 2137
Score 354
Class Capital
Approval
Demand
Population Breakdown
Residential 1,198
Commercial 72
Industrial 106
Assessed Value
Value $42,955,000
Top Problems
Infrastructure
3 Police
5 Fire
2 Power
1 Ports
1 Airports
1 Stadiums
1601 Roads
0 Rail
Power
Powered / Total 122 / 211 (58%)
Budget
Tax Rate 7%
Cash Flow $0
Fire 100%
Police 85%
Road 100%
Environment
Crime 54
Pollution 60
Land Value 66