Storm Complex
Ended
| Year | Action | Detail | Cost | Result |
|---|---|---|---|---|
| 2100 | Advance | 12 months | - | success |
| 2099 | Advance | 24 months | - | success |
| 2097 | Advance | 24 months | - | success |
| 2095 | Advance | 12 months | - | success |
| 2094 | Advance | 24 months | - | success |
| 2092 | Advance | 24 months | - | success |
| 2090 | Advance | 12 months | - | success |
| 2089 | Advance | 24 months | - | success |
| 2087 | Advance | 24 months | - | success |
| 2085 | Advance | 12 months | - | success |
| 2084 | Advance | 24 months | - | success |
| 2082 | Advance | 24 months | - | success |
| 2080 | Advance | 12 months | - | success |
| 2079 | Advance | 24 months | - | success |
| 2077 | Advance | 24 months | - | success |
| 2075 | build_wire_line | - | $65 | success |
| 2075 | Build Police Station | (31, 58) | $500 | success |
| 2075 | Zone Industrial | (34, 61) | $115 | success |
| 2075 | Zone Commercial | (31, 61) | $125 | success |
| 2075 | Zone Industrial | (28, 61) | $165 | success |
| 2075 | Zone Residential | (34, 58) | $120 | success |
| 2075 | Zone Commercial | (28, 58) | $105 | success |
| 2075 | Zone Industrial | (34, 55) | $105 | success |
| 2075 | Zone Residential | (31, 55) | $145 | success |
| 2075 | Zone Industrial | (28, 55) | $125 | success |
| 2075 | build_road_rect | (26, 53) | $400 | success |
| 2075 | Build Airport | (31, 58) | - | failed |
| 2075 | Advance | 12 months | - | success |
| 2074 | Advance | 24 months | - | success |
| 2072 | Advance | 24 months | - | success |
| 2070 | Build Airport | (31, 58) | - | failed |
| 2070 | Advance | 12 months | - | success |
| 2069 | Advance | 24 months | - | success |
| 2067 | Advance | 24 months | - | success |
| 2065 | Build Airport | (31, 58) | - | failed |
| 2065 | Advance | 12 months | - | success |
| 2064 | Advance | 24 months | - | success |
| 2062 | Advance | 24 months | - | success |
| 2060 | Build Airport | (31, 58) | - | failed |
| 2060 | Advance | 12 months | - | success |
| 2059 | Advance | 24 months | - | success |
| 2057 | Advance | 24 months | - | success |
| 2055 | Build Airport | (31, 58) | $10 | failed |
| 2055 | Advance | 12 months | - | success |
| 2054 | Advance | 24 months | - | success |
| 2052 | Advance | 24 months | - | success |
| 2050 | build_wire_line | - | $30 | success |
| 2050 | Build Park | (20, 58) | $20 | success |
| 2050 | Zone Residential | (23, 61) | $100 | success |
| 2050 | Zone Commercial | (20, 61) | $145 | success |
| 2050 | Zone Industrial | (17, 61) | $110 | success |
| 2050 | Zone Commercial | (23, 58) | $120 | success |
| 2050 | Zone Commercial | (17, 58) | $110 | success |
| 2050 | Zone Commercial | (23, 55) | $125 | success |
| 2050 | Zone Residential | (20, 55) | $140 | success |
| 2050 | Zone Residential | (17, 55) | $105 | success |
| 2050 | build_road_rect | (15, 53) | $400 | success |
| 2050 | Build Airport | (20, 58) | - | failed |
| 2050 | Advance | 12 months | - | success |
| 2049 | Advance | 24 months | - | success |
| 2047 | Advance | 24 months | - | success |
| 2045 | Build Airport | (20, 58) | - | failed |
| 2045 | Advance | 12 months | - | success |
| 2044 | Advance | 24 months | - | success |
| 2042 | Advance | 24 months | - | success |
| 2040 | Build Airport | (20, 58) | - | failed |
| 2040 | Advance | 12 months | - | success |
| 2039 | Advance | 24 months | - | success |
| 2037 | Advance | 24 months | - | success |
| 2035 | Build Airport | (20, 58) | $40 | failed |
| 2035 | Advance | 12 months | - | success |
| 2034 | Advance | 24 months | - | success |
| 2032 | Advance | 24 months | - | success |
| 2030 | build_wire_line | - | $15 | success |
| 2030 | Build Park | (9, 58) | $20 | success |
| 2030 | Zone Residential | (12, 61) | $115 | success |
| 2030 | Zone Commercial | (9, 61) | $130 | success |
| 2030 | Zone Industrial | (6, 61) | $145 | success |
| 2030 | Zone Commercial | (12, 58) | $120 | success |
| 2030 | Zone Commercial | (6, 58) | $180 | success |
| 2030 | Zone Commercial | (12, 55) | $100 | success |
| 2030 | Zone Residential | (9, 55) | $105 | success |
| 2030 | Zone Residential | (6, 55) | $105 | success |
| 2030 | build_road_rect | (4, 53) | $400 | success |
| 2030 | Build Airport | (9, 58) | - | failed |
| 2030 | Advance | 12 months | - | success |
| 2029 | Advance | 24 months | - | success |
| 2027 | Advance | 24 months | - | success |
| 2025 | Build Airport | (9, 58) | - | failed |
| 2025 | Advance | 12 months | - | success |
| 2024 | Advance | 24 months | - | success |
| 2022 | Advance | 24 months | - | success |
| 2020 | Build Airport | (9, 58) | - | failed |
| 2020 | Advance | 12 months | - | success |
| 2019 | Advance | 24 months | - | success |
| 2017 | Advance | 24 months | - | success |
| 2015 | Build Airport | (9, 58) | - | failed |
| 2015 | Advance | 12 months | - | success |
| 2014 | Advance | 24 months | - | success |
| 2012 | Advance | 24 months | - | success |
| 2010 | Build Airport | (9, 58) | - | failed |
| 2010 | Advance | 12 months | - | success |
| 2009 | Advance | 24 months | - | success |
| 2007 | Advance | 24 months | - | success |
| 2005 | Build Airport | (9, 58) | - | failed |
| 2005 | Advance | 12 months | - | success |
| 2004 | Advance | 24 months | - | success |
| 2002 | Advance | 24 months | - | success |
| 2000 | Build Airport | (9, 58) | $280 | failed |
| 2000 | Advance | 12 months | - | success |
| 1999 | Advance | 24 months | - | success |
| 1997 | Advance | 24 months | - | success |
| 1995 | Advance | 12 months | - | success |
| 1994 | Advance | 24 months | - | success |
| 1990 | Set Budget | - | - | success |
| 1992 | Advance | 24 months | - | success |
| 1990 | Advance | 12 months | - | success |
| 1989 | Advance | 24 months | - | success |
| 1987 | Advance | 24 months | - | success |
| 1985 | build_wire_line | - | $15 | success |
| 1985 | Build Fire Station | (53, 47) | - | failed |
| 1985 | Zone Industrial | (56, 50) | $115 | success |
| 1985 | Zone Commercial | (53, 50) | - | failed |
| 1985 | Zone Commercial | (50, 50) | - | failed |
| 1985 | Zone Residential | (56, 47) | $120 | success |
| 1985 | Zone Residential | (50, 47) | - | failed |
| 1985 | Zone Commercial | (56, 44) | $170 | success |
| 1985 | Zone Commercial | (53, 44) | $20 | failed |
| 1985 | Zone Commercial | (50, 44) | - | failed |
| 1985 | build_road_rect | (48, 42) | $310 | success |
| 1985 | Build Airport | (53, 47) | - | failed |
| 1985 | Advance | 12 months | - | success |
| 1984 | Advance | 24 months | - | success |
| 1982 | Advance | 24 months | - | success |
| 1980 | Build Airport | (53, 47) | - | failed |
| 1980 | Advance | 12 months | - | success |
| 1979 | Advance | 24 months | - | success |
| 1977 | Advance | 24 months | - | success |
| 1975 | Advance | 12 months | - | success |
| 1974 | Advance | 24 months | - | success |
| 1972 | Advance | 24 months | - | success |
| 1970 | build_wire_line | - | $40 | success |
| 1970 | Build Park | (53, 36) | $75 | success |
| 1970 | Zone Commercial | (56, 39) | $115 | success |
| 1970 | Zone Residential | (53, 39) | $105 | success |
| 1970 | Zone Industrial | (50, 39) | - | failed |
| 1970 | Zone Commercial | (56, 36) | $120 | success |
| 1970 | Zone Residential | (50, 36) | - | failed |
| 1970 | Zone Residential | (56, 33) | $165 | success |
| 1970 | Zone Commercial | (53, 33) | $175 | success |
| 1970 | Zone Industrial | (50, 33) | $155 | success |
| 1970 | build_road_rect | (48, 31) | $400 | success |
| 1970 | Build Airport | (53, 36) | $110 | failed |
| 1970 | Advance | 12 months | - | success |
| 1969 | Advance | 24 months | - | success |
| 1967 | Advance | 24 months | - | success |
| 1965 | build_wire_line | - | $50 | success |
| 1965 | Build Park | (53, 25) | $85 | success |
| 1965 | Zone Industrial | (56, 28) | $140 | success |
| 1965 | Zone Commercial | (53, 28) | $140 | success |
| 1965 | Zone Commercial | (50, 28) | $130 | success |
| 1965 | Zone Residential | (56, 25) | $215 | success |
| 1965 | Zone Residential | (50, 25) | $120 | success |
| 1965 | Zone Commercial | (56, 22) | - | failed |
| 1965 | Zone Commercial | (53, 22) | $20 | failed |
| 1965 | Zone Commercial | (50, 22) | $10 | failed |
| 1965 | build_road_rect | (48, 20) | $350 | success |
| 1965 | Zone Industrial | (56, 17) | - | failed |
| 1965 | Zone Commercial | (53, 17) | - | failed |
| 1965 | Zone Commercial | (50, 17) | - | failed |
| 1965 | Zone Residential | (56, 14) | - | failed |
| 1965 | Zone Residential | (50, 14) | - | failed |
| 1965 | Zone Commercial | (56, 11) | - | failed |
| 1965 | Zone Commercial | (53, 11) | - | failed |
| 1965 | Zone Commercial | (50, 11) | $105 | success |
| 1965 | build_road_rect | (48, 9) | $280 | success |
| 1965 | Build Airport | (53, 14) | - | failed |
| 1965 | Advance | 12 months | - | success |
| 1964 | Advance | 24 months | - | success |
| 1962 | Advance | 24 months | - | success |
| 1960 | build_wire_line | - | $60 | success |
| 1960 | Build Police Station | (42, 47) | $500 | success |
| 1960 | Zone Commercial | (45, 50) | $115 | success |
| 1960 | Zone Commercial | (42, 50) | $130 | success |
| 1960 | Zone Commercial | (39, 50) | $120 | success |
| 1960 | Zone Residential | (45, 47) | - | failed |
| 1960 | Zone Residential | (39, 47) | $105 | success |
| 1960 | Zone Commercial | (45, 44) | - | failed |
| 1960 | Zone Commercial | (42, 44) | $100 | success |
| 1960 | Zone Commercial | (39, 44) | $125 | success |
| 1960 | build_road_rect | (37, 42) | $310 | success |
| 1960 | Build Airport | (42, 47) | $30 | failed |
| 1960 | Advance | 12 months | - | success |
| 1959 | Advance | 24 months | - | success |
| 1957 | Advance | 24 months | - | success |
| 1955 | build_wire_line | - | $65 | success |
| 1955 | Build Park | (31, 47) | $20 | success |
| 1955 | Zone Residential | (34, 50) | $115 | success |
| 1955 | Zone Residential | (31, 50) | $125 | success |
| 1955 | Zone Residential | (28, 50) | $165 | success |
| 1955 | Zone Residential | (34, 47) | $130 | success |
| 1955 | Zone Residential | (28, 47) | $155 | success |
| 1955 | Zone Residential | (34, 44) | $175 | success |
| 1955 | Zone Residential | (31, 44) | $200 | success |
| 1955 | Zone Residential | (28, 44) | $125 | success |
| 1955 | build_road_rect | (26, 42) | $400 | success |
| 1955 | Set Budget | - | - | success |
| 1955 | Build Airport | (31, 47) | $250 | failed |
| 1955 | Advance | 12 months | - | success |
| 1954 | Advance | 24 months | - | success |
| 1952 | Advance | 24 months | - | success |
| 1950 | build_wire_line | - | $20 | success |
| 1950 | Build Park | (20, 47) | $40 | success |
| 1950 | Zone Residential | (23, 50) | $140 | success |
| 1950 | Zone Commercial | (20, 50) | $195 | success |
| 1950 | Zone Industrial | (17, 50) | $165 | success |
| 1950 | Zone Commercial | (23, 47) | $180 | success |
| 1950 | Zone Commercial | (17, 47) | $105 | success |
| 1950 | Zone Commercial | (23, 44) | $165 | success |
| 1950 | Zone Residential | (20, 44) | $185 | success |
| 1950 | Zone Residential | (17, 44) | $120 | success |
| 1950 | build_road_rect | (15, 42) | $400 | success |
| 1950 | Advance | 12 months | - | success |
| 1949 | Advance | 24 months | - | success |
| 1947 | Advance | 24 months | - | success |
| 1945 | build_wire_line | - | $10 | success |
| 1945 | Build Fire Station | (9, 47) | $500 | success |
| 1945 | Zone Residential | (12, 50) | $115 | success |
| 1945 | Zone Residential | (9, 50) | $130 | success |
| 1945 | Zone Residential | (6, 50) | $115 | success |
| 1945 | Zone Residential | (12, 47) | $120 | success |
| 1945 | Zone Residential | (6, 47) | $120 | success |
| 1945 | Zone Residential | (12, 44) | $105 | success |
| 1945 | Zone Residential | (9, 44) | $105 | success |
| 1945 | Zone Residential | (6, 44) | $110 | success |
| 1945 | build_road_rect | (4, 42) | $400 | success |
| 1945 | Build Airport | (9, 47) | - | failed |
| 1945 | Advance | 12 months | - | success |
| 1944 | Advance | 24 months | - | success |
| 1942 | Advance | 24 months | - | success |
| 1940 | build_wire_line | - | $25 | success |
| 1940 | Build Park | (9, 36) | $20 | success |
| 1940 | Zone Residential | (12, 39) | $100 | success |
| 1940 | Zone Commercial | (9, 39) | $125 | success |
| 1940 | Zone Industrial | (6, 39) | $115 | success |
| 1940 | Zone Commercial | (12, 36) | $105 | success |
| 1940 | Zone Commercial | (6, 36) | $130 | success |
| 1940 | Zone Commercial | (12, 33) | $145 | success |
| 1940 | Zone Residential | (9, 33) | $100 | success |
| 1940 | Zone Residential | (6, 33) | $105 | success |
| 1940 | build_road_rect | (4, 31) | $400 | success |
| 1940 | Build Airport | (9, 36) | $20 | failed |
| 1940 | Advance | 12 months | - | success |
| 1939 | Advance | 24 months | - | success |
| 1937 | Advance | 24 months | - | success |
| 1935 | build_wire_line | - | $20 | success |
| 1935 | Build Park | (9, 25) | $20 | success |
| 1935 | Zone Commercial | (12, 28) | $100 | success |
| 1935 | Zone Residential | (9, 28) | $125 | success |
| 1935 | Zone Industrial | (6, 28) | $115 | success |
| 1935 | Zone Industrial | (12, 25) | $105 | success |
| 1935 | Zone Industrial | (6, 25) | $170 | success |
| 1935 | Zone Industrial | (12, 22) | $105 | success |
| 1935 | Zone Industrial | (9, 22) | $110 | success |
| 1935 | Zone Industrial | (6, 22) | $165 | success |
| 1935 | build_road_rect | (4, 20) | $400 | success |
| 1935 | Build Airport | (9, 25) | $20 | failed |
| 1935 | Advance | 12 months | - | success |
| 1934 | Advance | 24 months | - | success |
| 1932 | Advance | 24 months | - | success |
| 1930 | Advance | 12 months | - | success |
| 1929 | Advance | 24 months | - | success |
| 1927 | Advance | 24 months | - | success |
| 1925 | build_wire_line | - | $10 | success |
| 1925 | Build Police Station | (9, 14) | $500 | success |
| 1925 | Zone Residential | (12, 17) | $120 | success |
| 1925 | Zone Residential | (9, 17) | $165 | success |
| 1925 | Zone Industrial | (6, 17) | $145 | success |
| 1925 | Zone Commercial | (12, 14) | $145 | success |
| 1925 | Zone Commercial | (6, 14) | $130 | success |
| 1925 | Zone Residential | (12, 11) | $105 | success |
| 1925 | Zone Residential | (9, 11) | $100 | success |
| 1925 | Zone Residential | (6, 11) | $135 | success |
| 1925 | build_road_rect | (4, 9) | $400 | success |
| 1925 | Zone Residential | (45, 39) | - | failed |
| 1925 | Zone Residential | (42, 39) | - | failed |
| 1925 | Zone Industrial | (39, 39) | - | failed |
| 1925 | Zone Commercial | (45, 36) | - | failed |
| 1925 | Zone Commercial | (39, 36) | - | failed |
| 1925 | Zone Residential | (45, 33) | - | failed |
| 1925 | Zone Residential | (42, 33) | - | failed |
| 1925 | Zone Residential | (39, 33) | - | failed |
| 1925 | build_road_rect | (37, 31) | $400 | success |
| 1925 | Zone Residential | (45, 28) | - | failed |
| 1925 | Zone Residential | (42, 28) | - | failed |
| 1925 | Zone Industrial | (39, 28) | - | failed |
| 1925 | Zone Commercial | (45, 25) | - | failed |
| 1925 | Zone Commercial | (39, 25) | - | failed |
| 1925 | Zone Residential | (45, 22) | - | failed |
| 1925 | Zone Residential | (42, 22) | - | failed |
| 1925 | Zone Residential | (39, 22) | - | failed |
| 1925 | build_road_rect | (37, 20) | $370 | success |
| 1925 | Advance | 12 months | - | success |
| 1924 | Advance | 24 months | - | success |
| 1922 | Advance | 24 months | - | success |
| 1920 | build_wire_line | - | $30 | success |
| 1920 | Build Park | (42, 14) | $95 | success |
| 1920 | Zone Residential | (45, 17) | - | failed |
| 1920 | Zone Commercial | (42, 17) | - | failed |
| 1920 | Zone Residential | (39, 17) | $160 | success |
| 1920 | Zone Residential | (45, 14) | $130 | success |
| 1920 | Zone Industrial | (39, 14) | $120 | success |
| 1920 | Zone Residential | (45, 11) | $115 | success |
| 1920 | Zone Commercial | (42, 11) | $130 | success |
| 1920 | Zone Residential | (39, 11) | $140 | success |
| 1920 | build_road_rect | (37, 9) | $400 | success |
| 1920 | Build Seaport | (31, 36) | $3,065 | success |
| 1920 | Build Stadium | (31, 14) | $5,085 | success |
| 1920 | Advance | 12 months | - | success |
| 1919 | Advance | 24 months | - | success |
| 1917 | Advance | 24 months | - | success |
| 1915 | build_wire_line | - | $15 | success |
| 1915 | Build Park | (20, 36) | $20 | success |
| 1915 | Zone Commercial | (23, 39) | $100 | success |
| 1915 | Zone Industrial | (20, 39) | $145 | success |
| 1915 | Zone Industrial | (17, 39) | $115 | success |
| 1915 | Zone Industrial | (23, 36) | $120 | success |
| 1915 | Zone Industrial | (17, 36) | $150 | success |
| 1915 | Zone Industrial | (23, 33) | $105 | success |
| 1915 | Zone Industrial | (20, 33) | $100 | success |
| 1915 | Zone Residential | (17, 33) | $115 | success |
| 1915 | build_road_rect | (15, 31) | $400 | success |
| 1915 | Advance | 12 months | - | success |
| 1914 | Advance | 24 months | - | success |
| 1912 | Advance | 24 months | - | success |
| 1910 | build_wire_line | - | $10 | success |
| 1910 | Build Fire Station | (20, 25) | $500 | success |
| 1910 | Zone Industrial | (23, 28) | $100 | success |
| 1910 | Zone Commercial | (20, 28) | $135 | success |
| 1910 | Zone Residential | (17, 28) | $125 | success |
| 1910 | Zone Residential | (23, 25) | $105 | success |
| 1910 | Zone Residential | (17, 25) | $150 | success |
| 1910 | Zone Residential | (23, 22) | $105 | success |
| 1910 | Zone Residential | (20, 22) | $100 | success |
| 1910 | Zone Residential | (17, 22) | $105 | success |
| 1910 | build_road_rect | (15, 20) | $400 | success |
| 1910 | Advance | 12 months | - | success |
| 1909 | Advance | 24 months | - | success |
| 1907 | Advance | 24 months | - | success |
| 1905 | build_wire_line | - | $10 | success |
| 1905 | Build Park | (20, 14) | $20 | success |
| 1905 | Zone Commercial | (23, 17) | - | failed |
| 1905 | Zone Residential | (20, 17) | $125 | success |
| 1905 | Zone Industrial | (17, 17) | $115 | success |
| 1905 | Zone Commercial | (23, 14) | $120 | success |
| 1905 | Zone Residential | (17, 14) | $130 | success |
| 1905 | Zone Industrial | (23, 11) | $100 | success |
| 1905 | Zone Commercial | (20, 11) | $100 | success |
| 1905 | Zone Residential | (17, 11) | $150 | success |
| 1905 | build_road_rect | (15, 9) | $360 | success |
| 1905 | Advance | 12 months | - | success |
| 1904 | Advance | 24 months | - | success |
| 1902 | Advance | 24 months | - | success |
| 1900 | build_wire_line | - | $20 | success |
| 1900 | Build Park | (31, 25) | $20 | success |
| 1900 | Zone Commercial | (34, 28) | $115 | success |
| 1900 | Zone Residential | (31, 28) | $130 | success |
| 1900 | Zone Industrial | (28, 28) | $115 | success |
| 1900 | Zone Commercial | (34, 25) | $130 | success |
| 1900 | Zone Residential | (28, 25) | $120 | success |
| 1900 | Zone Industrial | (34, 22) | $115 | success |
| 1900 | Zone Commercial | (31, 22) | $115 | success |
| 1900 | Zone Residential | (28, 22) | $120 | success |
| 1900 | build_road_rect | (26, 20) | $400 | success |
| 1900 | Set Budget | - | - | success |
| 1900 | Advance | 1 month | - | success |
| 1900 | Build Coal Power | (26, 14) | $3,040 | success |
Population 27,200
Funds $0
Year 2100
Score 2
Class City
Approval
Demand
Population Breakdown
Residential 704
Commercial 39
Industrial 43
Assessed Value
Value $22,045,000
Top Problems
Infrastructure
3 Police
2 Fire
1 Power
1 Ports
0 Airports
1 Stadiums
1234 Roads
0 Rail
Power
Powered / Total 54 / 138 (39%)
Budget
Tax Rate 7%
Cash Flow $0
Fire 100%
Police 44%
Road 100%
Environment
Crime 40
Pollution 42
Land Value 82