Sonic Cistern
Ended
| Year | Action | Detail | Cost | Result |
|---|---|---|---|---|
| 2042 | Advance | 12 months | - | success |
| 2041 | Advance | 24 months | - | success |
| 2039 | Advance | 24 months | - | success |
| 2037 | Advance | 12 months | - | success |
| 2036 | Advance | 24 months | - | success |
| 2034 | Advance | 24 months | - | success |
| 2032 | Advance | 24 months | - | success |
| 2030 | build_wire_line | - | $50 | success |
| 2030 | Build Fire Station | (53, 42) | $10 | failed |
| 2030 | Zone Commercial | (56, 45) | $135 | success |
| 2030 | Zone Industrial | (53, 45) | $150 | success |
| 2030 | Zone Industrial | (50, 45) | $145 | success |
| 2030 | Zone Residential | (56, 42) | $170 | success |
| 2030 | Zone Residential | (50, 42) | $195 | success |
| 2030 | Zone Industrial | (56, 39) | $115 | success |
| 2030 | Zone Industrial | (53, 39) | $120 | success |
| 2030 | Zone Industrial | (50, 39) | $165 | success |
| 2030 | build_road_rect | (48, 37) | $400 | success |
| 2030 | Advance | 12 months | - | success |
| 2029 | Advance | 24 months | - | success |
| 2027 | Advance | 24 months | - | success |
| 2025 | Advance | 12 months | - | success |
| 2024 | Advance | 24 months | - | success |
| 2022 | Advance | 24 months | - | success |
| 2020 | Advance | 12 months | - | success |
| 2019 | Advance | 24 months | - | success |
| 2017 | Advance | 24 months | - | success |
| 2015 | Advance | 12 months | - | success |
| 2014 | Advance | 24 months | - | success |
| 2012 | Advance | 24 months | - | success |
| 2010 | Advance | 24 months | - | success |
| 2008 | build_wire_line | - | $30 | success |
| 2008 | Build Park | (42, 86) | $40 | success |
| 2008 | Zone Residential | (45, 89) | $115 | success |
| 2008 | Zone Industrial | (42, 89) | $120 | success |
| 2008 | Zone Industrial | (39, 89) | $105 | success |
| 2008 | Zone Industrial | (45, 86) | $150 | success |
| 2008 | Zone Commercial | (39, 86) | $115 | success |
| 2008 | Zone Industrial | (45, 83) | $150 | success |
| 2008 | Zone Residential | (42, 83) | $145 | success |
| 2008 | Zone Residential | (39, 83) | $115 | success |
| 2008 | build_road_rect | (37, 81) | $400 | success |
| 2008 | Advance | 12 months | - | success |
| 2007 | Advance | 24 months | - | success |
| 2005 | Advance | 24 months | - | success |
| 2003 | Advance | 12 months | - | success |
| 2002 | Advance | 24 months | - | success |
| 2000 | Advance | 24 months | - | success |
| 1998 | Advance | 12 months | - | success |
| 1997 | Advance | 24 months | - | success |
| 1995 | Advance | 24 months | - | success |
| 1993 | Advance | 24 months | - | success |
| 1991 | build_wire_line | - | $40 | success |
| 1991 | Build Park | (42, 42) | $40 | success |
| 1991 | Zone Industrial | (45, 45) | $145 | success |
| 1991 | Zone Industrial | (42, 45) | $165 | success |
| 1991 | Zone Residential | (39, 45) | $125 | success |
| 1991 | Zone Industrial | (45, 42) | $170 | success |
| 1991 | Zone Commercial | (39, 42) | $155 | success |
| 1991 | Zone Industrial | (45, 39) | $175 | success |
| 1991 | Zone Residential | (42, 39) | $210 | success |
| 1991 | Zone Residential | (39, 39) | $135 | success |
| 1991 | build_road_rect | (37, 37) | $400 | success |
| 1991 | Build Coal Power | (26, 93) | $40 | failed |
| 1991 | Build Coal Power | (26, 76) | - | failed |
| 1991 | Build Coal Power | (38, 81) | $50 | failed |
| 1991 | Build Coal Power | (21, 81) | - | failed |
| 1991 | Build Coal Power | (26, 49) | - | failed |
| 1991 | Build Coal Power | (26, 32) | $120 | failed |
| 1991 | Build Coal Power | (38, 37) | $140 | failed |
| 1991 | Build Coal Power | (21, 37) | - | failed |
| 1991 | Build Coal Power | (15, 93) | - | failed |
| 1991 | Build Coal Power | (15, 76) | - | failed |
| 1991 | Build Coal Power | (27, 81) | - | failed |
| 1991 | Build Coal Power | (10, 81) | - | failed |
| 1991 | Build Coal Power | (15, 49) | - | failed |
| 1991 | Build Coal Power | (15, 32) | $140 | failed |
| 1991 | Build Coal Power | (27, 37) | - | failed |
| 1991 | Build Coal Power | (10, 37) | $50 | failed |
| 1991 | Build Coal Power | (4, 93) | - | failed |
| 1991 | Build Coal Power | (4, 76) | - | failed |
| 1991 | Build Coal Power | (16, 81) | - | failed |
| 1991 | Build Coal Power | (26, 35) | $80 | failed |
| 1991 | Build Coal Power | (26, 83) | - | failed |
| 1991 | Build Coal Power | (2, 59) | - | failed |
| 1991 | Build Coal Power | (50, 59) | - | failed |
| 1991 | Build Coal Power | (26, 41) | - | failed |
| 1991 | Build Coal Power | (26, 77) | - | failed |
| 1991 | Build Coal Power | (8, 59) | - | failed |
| 1991 | Build Coal Power | (44, 59) | - | failed |
| 1991 | Build Coal Power | (14, 71) | $40 | failed |
| 1991 | Build Coal Power | (38, 47) | $10 | failed |
| 1991 | Build Coal Power | (14, 47) | - | failed |
| 1991 | Build Coal Power | (38, 71) | - | failed |
| 1991 | Build Coal Power | (26, 47) | - | failed |
| 1991 | Build Coal Power | (26, 71) | - | failed |
| 1991 | Build Coal Power | (14, 59) | - | failed |
| 1991 | Build Coal Power | (38, 59) | - | failed |
| 1991 | Build Coal Power | (26, 59) | - | failed |
| 1991 | Build Coal Power | (32, 59) | - | failed |
| 1991 | Build Coal Power | (20, 59) | - | failed |
| 1991 | Build Coal Power | (26, 65) | - | failed |
| 1991 | Build Coal Power | (26, 53) | - | failed |
| 1991 | Advance | 12 months | - | success |
| 1990 | Advance | 24 months | - | success |
| 1988 | Advance | 24 months | - | success |
| 1986 | Advance | 24 months | - | success |
| 1984 | build_wire_line | - | $10 | success |
| 1984 | Build Police Station | (31, 86) | $510 | success |
| 1984 | Zone Industrial | (34, 89) | $155 | success |
| 1984 | Zone Commercial | (31, 89) | $170 | success |
| 1984 | Zone Industrial | (28, 89) | $145 | success |
| 1984 | Zone Residential | (34, 86) | $165 | success |
| 1984 | Zone Commercial | (28, 86) | $165 | success |
| 1984 | Zone Industrial | (34, 83) | $125 | success |
| 1984 | Zone Residential | (31, 83) | $195 | success |
| 1984 | Zone Industrial | (28, 83) | $195 | success |
| 1984 | build_road_rect | (26, 81) | $400 | success |
| 1984 | Advance | 12 months | - | success |
| 1983 | Advance | 24 months | - | success |
| 1981 | Advance | 24 months | - | success |
| 1979 | Advance | 24 months | - | success |
| 1977 | build_wire_line | - | $30 | success |
| 1977 | Build Park | (31, 42) | $30 | success |
| 1977 | Zone Industrial | (34, 45) | $135 | success |
| 1977 | Zone Commercial | (31, 45) | $120 | success |
| 1977 | Zone Industrial | (28, 45) | $105 | success |
| 1977 | Zone Industrial | (34, 42) | $180 | success |
| 1977 | Zone Commercial | (28, 42) | $135 | success |
| 1977 | Zone Industrial | (34, 39) | $165 | success |
| 1977 | Zone Residential | (31, 39) | $160 | success |
| 1977 | Zone Residential | (28, 39) | $170 | success |
| 1977 | Set Budget | - | - | success |
| 1977 | build_road_rect | (26, 37) | $400 | success |
| 1977 | Advance | 12 months | - | success |
| 1976 | Advance | 24 months | - | success |
| 1974 | Advance | 24 months | - | success |
| 1972 | Advance | 24 months | - | success |
| 1970 | build_wire_line | - | $45 | success |
| 1970 | Build Fire Station | (20, 86) | $510 | success |
| 1970 | Zone Commercial | (23, 89) | $155 | success |
| 1970 | Zone Residential | (20, 89) | $120 | success |
| 1970 | Zone Industrial | (17, 89) | $155 | success |
| 1970 | Zone Commercial | (23, 86) | $150 | success |
| 1970 | Zone Residential | (17, 86) | $150 | success |
| 1970 | Zone Industrial | (23, 83) | $100 | success |
| 1970 | Zone Commercial | (20, 83) | $135 | success |
| 1970 | Zone Residential | (17, 83) | $175 | success |
| 1970 | build_road_rect | (15, 81) | $400 | success |
| 1970 | Advance | 12 months | - | success |
| 1969 | Advance | 24 months | - | success |
| 1967 | Advance | 24 months | - | success |
| 1965 | Advance | 24 months | - | success |
| 1963 | build_wire_line | - | $10 | success |
| 1963 | Build Park | (20, 42) | $40 | success |
| 1963 | Zone Residential | (23, 45) | $145 | success |
| 1963 | Zone Industrial | (20, 45) | $165 | success |
| 1963 | Zone Industrial | (17, 45) | $160 | success |
| 1963 | Zone Industrial | (23, 42) | $180 | success |
| 1963 | Zone Commercial | (17, 42) | $170 | success |
| 1963 | Zone Industrial | (23, 39) | $175 | success |
| 1963 | Zone Residential | (20, 39) | $220 | success |
| 1963 | Zone Residential | (17, 39) | $230 | success |
| 1963 | build_road_rect | (15, 37) | $390 | success |
| 1963 | Advance | 12 months | - | success |
| 1962 | Advance | 24 months | - | success |
| 1960 | Advance | 24 months | - | success |
| 1958 | Advance | 24 months | - | success |
| 1956 | build_wire_line | - | $65 | success |
| 1956 | Build Police Station | (9, 86) | $500 | success |
| 1956 | Zone Commercial | (12, 89) | $135 | success |
| 1956 | Zone Industrial | (9, 89) | $140 | success |
| 1956 | Zone Industrial | (6, 89) | $115 | success |
| 1956 | Zone Residential | (12, 86) | $120 | success |
| 1956 | Zone Residential | (6, 86) | $130 | success |
| 1956 | Zone Industrial | (12, 83) | $100 | success |
| 1956 | Zone Industrial | (9, 83) | $100 | success |
| 1956 | Zone Industrial | (6, 83) | $140 | success |
| 1956 | build_road_rect | (4, 81) | $400 | success |
| 1956 | Advance | 12 months | - | success |
| 1955 | Advance | 24 months | - | success |
| 1953 | Advance | 24 months | - | success |
| 1951 | Advance | 24 months | - | success |
| 1949 | Zone Residential | (12, 78) | - | failed |
| 1949 | Zone Residential | (9, 78) | - | failed |
| 1949 | Zone Residential | (6, 78) | - | failed |
| 1949 | Zone Residential | (12, 75) | - | failed |
| 1949 | Zone Residential | (6, 75) | - | failed |
| 1949 | Zone Residential | (12, 72) | - | failed |
| 1949 | Zone Residential | (9, 72) | - | failed |
| 1949 | Zone Residential | (6, 72) | - | failed |
| 1949 | build_road_rect | (4, 70) | - | failed |
| 1949 | Zone Residential | (12, 67) | - | failed |
| 1949 | Zone Residential | (9, 67) | - | failed |
| 1949 | Zone Residential | (6, 67) | - | failed |
| 1949 | Zone Residential | (12, 64) | - | failed |
| 1949 | Zone Residential | (6, 64) | - | failed |
| 1949 | Zone Residential | (12, 61) | $30 | failed |
| 1949 | Zone Residential | (9, 61) | $50 | failed |
| 1949 | Zone Residential | (6, 61) | - | failed |
| 1949 | build_road_rect | (4, 59) | $80 | success |
| 1949 | Zone Residential | (12, 56) | - | failed |
| 1949 | Zone Residential | (9, 56) | - | failed |
| 1949 | Zone Residential | (6, 56) | - | failed |
| 1949 | Zone Residential | (12, 53) | - | failed |
| 1949 | Zone Residential | (6, 53) | - | failed |
| 1949 | Zone Residential | (12, 50) | $20 | failed |
| 1949 | Zone Residential | (9, 50) | $40 | failed |
| 1949 | Zone Residential | (6, 50) | $100 | success |
| 1949 | build_road_rect | (4, 48) | $400 | success |
| 1949 | Build Airport | (9, 42) | $10,290 | success |
| 1949 | Advance | 12 months | - | success |
| 1948 | Advance | 24 months | - | success |
| 1946 | Advance | 24 months | - | success |
| 1944 | Advance | 24 months | - | success |
| 1942 | build_wire_line | - | $25 | success |
| 1942 | Build Park | (42, 75) | $20 | success |
| 1942 | Zone Residential | (45, 78) | $135 | success |
| 1942 | Zone Residential | (42, 78) | $180 | success |
| 1942 | Zone Industrial | (39, 78) | $115 | success |
| 1942 | Zone Commercial | (45, 75) | $160 | success |
| 1942 | Zone Commercial | (39, 75) | $105 | success |
| 1942 | Zone Residential | (45, 72) | $165 | success |
| 1942 | Zone Residential | (42, 72) | $185 | success |
| 1942 | Zone Residential | (39, 72) | $125 | success |
| 1942 | build_road_rect | (37, 70) | $400 | success |
| 1942 | Advance | 12 months | - | success |
| 1941 | Advance | 24 months | - | success |
| 1939 | Advance | 24 months | - | success |
| 1937 | Advance | 24 months | - | success |
| 1935 | build_wire_line | - | $40 | success |
| 1935 | Build Park | (42, 64) | $20 | success |
| 1935 | Zone Residential | (45, 67) | $155 | success |
| 1935 | Zone Commercial | (42, 67) | $145 | success |
| 1935 | Zone Residential | (39, 67) | $105 | success |
| 1935 | Zone Residential | (45, 64) | $140 | success |
| 1935 | Zone Industrial | (39, 64) | $105 | success |
| 1935 | Zone Residential | (45, 61) | $105 | success |
| 1935 | Zone Commercial | (42, 61) | $105 | success |
| 1935 | Zone Residential | (39, 61) | $105 | success |
| 1935 | build_road_rect | (37, 59) | $400 | success |
| 1935 | Advance | 12 months | - | success |
| 1934 | Advance | 24 months | - | success |
| 1932 | Advance | 24 months | - | success |
| 1930 | Advance | 24 months | - | success |
| 1928 | build_wire_line | - | $20 | success |
| 1928 | Build Fire Station | (42, 53) | $500 | success |
| 1928 | Zone Residential | (45, 56) | $135 | success |
| 1928 | Zone Commercial | (42, 56) | $130 | success |
| 1928 | Zone Residential | (39, 56) | $100 | success |
| 1928 | Zone Residential | (45, 53) | $150 | success |
| 1928 | Zone Industrial | (39, 53) | $100 | success |
| 1928 | Zone Residential | (45, 50) | $125 | success |
| 1928 | Zone Commercial | (42, 50) | $130 | success |
| 1928 | Zone Residential | (39, 50) | $140 | success |
| 1928 | build_road_rect | (37, 48) | $400 | success |
| 1928 | Advance | 12 months | - | success |
| 1927 | Advance | 24 months | - | success |
| 1925 | Advance | 24 months | - | success |
| 1923 | Advance | 24 months | - | success |
| 1921 | build_wire_line | - | - | failed |
| 1921 | Build Police Station | (31, 75) | $500 | success |
| 1921 | Zone Commercial | (34, 78) | $155 | success |
| 1921 | Zone Industrial | (31, 78) | $160 | success |
| 1921 | Zone Industrial | (28, 78) | $105 | success |
| 1921 | Zone Residential | (34, 75) | $130 | success |
| 1921 | Zone Residential | (28, 75) | $105 | success |
| 1921 | Zone Industrial | (34, 72) | $160 | success |
| 1921 | Zone Industrial | (31, 72) | $165 | success |
| 1921 | Zone Industrial | (28, 72) | $115 | success |
| 1921 | build_road_rect | (26, 70) | $400 | success |
| 1921 | Build Seaport | (31, 53) | $3,035 | success |
| 1921 | Advance | 12 months | - | success |
| 1920 | Advance | 24 months | - | success |
| 1918 | Advance | 24 months | - | success |
| 1916 | Advance | 24 months | - | success |
| 1914 | build_wire_line | - | $55 | success |
| 1914 | Build Park | (20, 75) | $20 | success |
| 1914 | Zone Industrial | (23, 78) | $115 | success |
| 1914 | Zone Residential | (20, 78) | $130 | success |
| 1914 | Zone Residential | (17, 78) | $115 | success |
| 1914 | Zone Residential | (23, 75) | $120 | success |
| 1914 | Zone Residential | (17, 75) | $130 | success |
| 1914 | Zone Commercial | (23, 72) | $100 | success |
| 1914 | Zone Residential | (20, 72) | $140 | success |
| 1914 | Zone Residential | (17, 72) | $140 | success |
| 1914 | build_road_rect | (15, 70) | $400 | success |
| 1914 | Build Stadium | (20, 64) | $5,045 | success |
| 1914 | Advance | 12 months | - | success |
| 1913 | Advance | 24 months | - | success |
| 1911 | Advance | 24 months | - | success |
| 1909 | Advance | 24 months | - | success |
| 1907 | build_wire_line | - | $10 | success |
| 1907 | Build Park | (20, 53) | $20 | success |
| 1907 | Zone Residential | (23, 56) | $20 | failed |
| 1907 | Zone Commercial | (20, 56) | $125 | success |
| 1907 | Zone Residential | (17, 56) | $115 | success |
| 1907 | Zone Residential | (23, 53) | $180 | success |
| 1907 | Zone Commercial | (17, 53) | $150 | success |
| 1907 | Zone Residential | (23, 50) | $140 | success |
| 1907 | Zone Industrial | (20, 50) | $100 | success |
| 1907 | Zone Residential | (17, 50) | $225 | success |
| 1907 | build_road_rect | (15, 48) | $350 | success |
| 1907 | Advance | 12 months | - | success |
| 1906 | Advance | 24 months | - | success |
| 1904 | Advance | 24 months | - | success |
| 1902 | Advance | 24 months | - | success |
| 1900 | build_wire_line | - | $15 | success |
| 1900 | Build Park | (31, 64) | $20 | success |
| 1900 | Zone Residential | (34, 67) | $115 | success |
| 1900 | Zone Industrial | (31, 67) | $180 | success |
| 1900 | Zone Industrial | (28, 67) | $115 | success |
| 1900 | Zone Industrial | (34, 64) | $130 | success |
| 1900 | Zone Commercial | (28, 64) | $120 | success |
| 1900 | Zone Industrial | (34, 61) | $115 | success |
| 1900 | Zone Residential | (31, 61) | $115 | success |
| 1900 | Zone Residential | (28, 61) | $140 | success |
| 1900 | Set Budget | - | - | success |
| 1900 | build_road_rect | (26, 59) | $400 | success |
| 1900 | Advance | 1 month | - | success |
| 1900 | Build Coal Power | (26, 53) | $3,120 | success |
Population 27,840
Funds $314
Year 2042
Score 192
Class City
Approval
Demand
Population Breakdown
Residential 720
Commercial 29
Industrial 55
Assessed Value
Value $29,360,000
Top Problems
Infrastructure
3 Police
2 Fire
1 Power
1 Ports
1 Airports
1 Stadiums
672 Roads
0 Rail
Power
Powered / Total 48 / 129 (37%)
Budget
Tax Rate 7%
Cash Flow $0
Fire 100%
Police 100%
Road 100%
Environment
Crime 32
Pollution 56
Land Value 85