Photon Turbine
Ended
| Year | Action | Detail | Cost | Result |
|---|---|---|---|---|
| 2105 | Advance | 12 months | - | success |
| 2104 | Advance | 24 months | - | success |
| 2102 | Advance | 24 months | - | success |
| 2100 | Build Park | (50, 45) | - | failed |
| 2100 | Build Park | (55, 50) | - | failed |
| 2100 | Build Park | (60, 55) | - | failed |
| 2100 | Zone Commercial | (24, 71) | $180 | success |
| 2100 | Zone Commercial | (18, 73) | $130 | success |
| 2100 | Build Road | (22, 73) | $20 | success |
| 2100 | Build Road | (21, 74) | $135 | success |
| 2100 | Build Road | (20, 75) | $20 | success |
| 2100 | Zone Residential | (61, 48) | - | failed |
| 2100 | Zone Residential | (58, 45) | - | failed |
| 2100 | Zone Residential | (55, 42) | - | failed |
| 2100 | Zone Residential | (52, 42) | - | failed |
| 2100 | Build Road | (54, 44) | - | failed |
| 2100 | Build Road | (55, 45) | - | failed |
| 2100 | Build Road | (56, 46) | - | failed |
| 2100 | Build Road | (57, 47) | - | failed |
| 2100 | Build Road | (58, 48) | - | failed |
| 2100 | Build Road | (59, 49) | - | failed |
| 2100 | Set Budget | - | - | success |
| 2100 | Build Road | (60, 50) | - | failed |
| 2100 | Advance | 12 months | - | success |
| 2099 | Advance | 24 months | - | success |
| 2097 | Advance | 24 months | - | success |
| 2095 | Build Power Line | (45, 36) | - | failed |
| 2095 | Build Power Line | (40, 36) | - | failed |
| 2095 | Build Power Line | (35, 36) | - | failed |
| 2095 | Build Park | (35, 32) | - | failed |
| 2095 | Build Park | (34, 31) | - | failed |
| 2095 | Build Park | (33, 30) | - | failed |
| 2095 | Build Park | (32, 29) | - | failed |
| 2095 | Zone Residential | (43, 37) | - | failed |
| 2095 | Zone Residential | (40, 34) | - | failed |
| 2095 | Zone Residential | (37, 31) | $10 | failed |
| 2095 | Zone Residential | (34, 28) | $195 | success |
| 2095 | Zone Residential | (31, 25) | $155 | success |
| 2095 | Zone Residential | (28, 28) | - | failed |
| 2095 | Build Road | (36, 36) | - | failed |
| 2095 | Build Road | (35, 35) | - | failed |
| 2095 | Build Road | (34, 34) | - | failed |
| 2095 | Build Road | (33, 33) | - | failed |
| 2095 | Build Road | (32, 32) | - | failed |
| 2095 | Build Road | (31, 31) | - | failed |
| 2095 | Build Road | (30, 30) | - | failed |
| 2095 | Advance | 12 months | - | success |
| 2094 | Advance | 24 months | - | success |
| 2092 | Advance | 24 months | - | success |
| 2090 | Build Road | (43, 87) | $25 | success |
| 2090 | Build Road | (42, 87) | $40 | success |
| 2090 | Zone Residential | (40, 85) | $295 | success |
| 2090 | Build Park | (59, 22) | $20 | success |
| 2090 | Build Park | (61, 21) | - | failed |
| 2090 | Build Park | (59, 26) | $10 | success |
| 2090 | Build Power Line | (63, 28) | $5 | success |
| 2090 | Build Power Line | (62, 27) | - | failed |
| 2090 | Build Power Line | (61, 26) | - | failed |
| 2090 | Zone Commercial | (62, 23) | - | failed |
| 2090 | Zone Residential | (58, 23) | - | failed |
| 2090 | Zone Commercial | (62, 20) | $30 | failed |
| 2090 | Zone Residential | (58, 20) | - | failed |
| 2090 | Build Road | (60, 25) | - | failed |
| 2090 | Build Road | (60, 24) | - | failed |
| 2090 | Build Road | (60, 23) | - | failed |
| 2090 | Build Road | (60, 22) | - | failed |
| 2090 | Build Road | (60, 21) | - | failed |
| 2090 | Set Budget | - | - | success |
| 2090 | Build Road | (60, 20) | - | failed |
| 2090 | Advance | 12 months | - | success |
| 2089 | Advance | 24 months | - | success |
| 2087 | Advance | 24 months | - | success |
| 2085 | Build Power Line | (52, 52) | - | failed |
| 2085 | Build Power Line | (42, 42) | - | failed |
| 2085 | Build Power Line | (32, 32) | - | failed |
| 2085 | Build Power Line | (22, 22) | - | failed |
| 2085 | Build Power Line | (12, 12) | - | failed |
| 2085 | Build Road | (75, 75) | $50 | success |
| 2085 | Build Road | (65, 65) | - | failed |
| 2085 | Build Road | (55, 55) | - | failed |
| 2085 | Build Road | (45, 45) | - | failed |
| 2085 | Build Road | (35, 35) | - | failed |
| 2085 | Build Road | (25, 25) | - | failed |
| 2085 | Build Road | (15, 15) | - | failed |
| 2085 | Zone Residential | (80, 80) | - | failed |
| 2085 | Zone Residential | (70, 70) | $265 | success |
| 2085 | Zone Residential | (60, 60) | - | failed |
| 2085 | Zone Residential | (50, 50) | - | failed |
| 2085 | Zone Residential | (40, 40) | - | failed |
| 2085 | Zone Residential | (30, 30) | - | failed |
| 2085 | Zone Residential | (20, 20) | - | failed |
| 2085 | Set Budget | - | - | success |
| 2085 | Zone Residential | (10, 10) | - | failed |
| 2085 | Advance | 12 months | - | success |
| 2084 | Advance | 24 months | - | success |
| 2082 | Advance | 24 months | - | success |
| 2080 | Build Park | (25, 23) | - | failed |
| 2080 | Build Park | (23, 25) | - | failed |
| 2080 | Build Park | (23, 21) | - | failed |
| 2080 | Build Park | (24, 20) | - | failed |
| 2080 | Build Power Line | (25, 25) | - | failed |
| 2080 | Build Power Line | (19, 19) | - | failed |
| 2080 | Zone Residential | (29, 18) | $105 | success |
| 2080 | Zone Residential | (18, 29) | $10 | failed |
| 2080 | Zone Residential | (29, 29) | - | failed |
| 2080 | Zone Residential | (18, 18) | - | failed |
| 2080 | Build Road | (27, 27) | - | failed |
| 2080 | Build Road | (26, 26) | - | failed |
| 2080 | Build Road | (25, 25) | - | failed |
| 2080 | Build Road | (24, 24) | - | failed |
| 2080 | Build Road | (23, 23) | - | failed |
| 2080 | Build Road | (22, 22) | - | failed |
| 2080 | Build Road | (21, 21) | - | failed |
| 2080 | Build Road | (20, 20) | - | failed |
| 2080 | Advance | 12 months | - | success |
| 2079 | Advance | 24 months | - | success |
| 2077 | Advance | 24 months | - | success |
| 2075 | Build Power Line | (50, 60) | $90 | success |
| 2075 | Build Power Line | (55, 55) | - | failed |
| 2075 | Build Power Line | (60, 50) | - | failed |
| 2075 | Build Park | (56, 66) | - | failed |
| 2075 | Build Park | (58, 64) | - | failed |
| 2075 | Zone Industrial | (50, 70) | $120 | success |
| 2075 | Zone Industrial | (51, 69) | - | failed |
| 2075 | Zone Residential | (63, 57) | - | failed |
| 2075 | Zone Residential | (62, 58) | - | failed |
| 2075 | Zone Residential | (61, 59) | - | failed |
| 2075 | Build Road | (52, 68) | $20 | success |
| 2075 | Build Road | (53, 67) | $50 | success |
| 2075 | Build Road | (54, 66) | - | failed |
| 2075 | Build Road | (55, 65) | - | failed |
| 2075 | Build Road | (56, 64) | - | failed |
| 2075 | Build Road | (57, 63) | - | failed |
| 2075 | Build Road | (58, 62) | - | failed |
| 2075 | Build Road | (59, 61) | - | failed |
| 2075 | Set Budget | - | - | success |
| 2075 | Build Road | (60, 60) | - | failed |
| 2075 | Advance | 12 months | - | success |
| 2074 | Advance | 24 months | - | success |
| 2072 | Advance | 24 months | - | success |
| 2070 | Build Park | (47, 26) | $20 | success |
| 2070 | Build Park | (45, 24) | - | failed |
| 2070 | Build Park | (43, 22) | - | failed |
| 2070 | Build Park | (41, 20) | - | failed |
| 2070 | Zone Industrial | (42, 25) | $40 | failed |
| 2070 | Zone Commercial | (45, 29) | $20 | failed |
| 2070 | Zone Residential | (48, 25) | $60 | failed |
| 2070 | Zone Industrial | (45, 19) | $30 | failed |
| 2070 | Zone Commercial | (42, 19) | $20 | failed |
| 2070 | Zone Residential | (39, 19) | - | failed |
| 2070 | Build Road | (48, 28) | $40 | success |
| 2070 | Build Road | (47, 27) | $35 | success |
| 2070 | Build Road | (46, 26) | $20 | success |
| 2070 | Build Road | (45, 25) | $55 | success |
| 2070 | Build Road | (44, 24) | - | failed |
| 2070 | Build Road | (43, 23) | - | failed |
| 2070 | Build Road | (42, 22) | - | failed |
| 2070 | Build Road | (41, 21) | $10 | success |
| 2070 | Set Budget | - | - | success |
| 2070 | Build Road | (40, 20) | - | failed |
| 2070 | Advance | 12 months | - | success |
| 2069 | Advance | 24 months | - | success |
| 2067 | Advance | 24 months | - | success |
| 2065 | Build Park | (34, 64) | - | failed |
| 2065 | Build Park | (29, 59) | - | failed |
| 2065 | Zone Commercial | (33, 63) | - | failed |
| 2065 | Zone Residential | (28, 58) | $180 | success |
| 2065 | Build Road | (32, 62) | $15 | success |
| 2065 | Build Road | (31, 61) | $10 | success |
| 2065 | Build Road | (30, 60) | $40 | success |
| 2065 | Build Park | (60, 26) | - | failed |
| 2065 | Build Park | (60, 19) | $10 | success |
| 2065 | Zone Industrial | (62, 25) | - | failed |
| 2065 | Zone Commercial | (58, 24) | $100 | success |
| 2065 | Zone Residential | (62, 22) | $20 | failed |
| 2065 | Zone Residential | (58, 20) | - | failed |
| 2065 | Build Road | (60, 25) | $10 | success |
| 2065 | Build Road | (60, 24) | - | failed |
| 2065 | Build Road | (60, 23) | $10 | success |
| 2065 | Build Road | (60, 22) | - | failed |
| 2065 | Build Road | (60, 21) | $10 | success |
| 2065 | Set Budget | - | - | success |
| 2065 | Build Road | (60, 20) | - | failed |
| 2065 | Advance | 12 months | - | success |
| 2064 | Advance | 24 months | - | success |
| 2062 | Advance | 24 months | - | success |
| 2060 | Build Park | (48, 52) | $25 | success |
| 2060 | Build Park | (52, 48) | - | failed |
| 2060 | Build Park | (54, 58) | - | failed |
| 2060 | Build Park | (58, 54) | - | failed |
| 2060 | Zone Residential | (45, 45) | - | failed |
| 2060 | Zone Residential | (61, 61) | - | failed |
| 2060 | Zone Residential | (48, 48) | - | failed |
| 2060 | Build Road | (49, 49) | $10 | success |
| 2060 | Build Road | (50, 50) | - | failed |
| 2060 | Build Road | (51, 51) | $10 | success |
| 2060 | Build Road | (52, 52) | - | failed |
| 2060 | Build Road | (53, 53) | - | failed |
| 2060 | Build Road | (54, 54) | - | failed |
| 2060 | Build Road | (55, 55) | - | failed |
| 2060 | Build Road | (56, 56) | - | failed |
| 2060 | Build Road | (57, 57) | - | failed |
| 2060 | Build Road | (58, 58) | - | failed |
| 2060 | Build Road | (59, 59) | - | failed |
| 2060 | Build Road | (60, 60) | - | failed |
| 2060 | Set Budget | - | - | success |
| 2060 | Advance | 12 months | - | success |
| 2059 | Advance | 24 months | - | success |
| 2057 | Advance | 24 months | - | success |
| 2055 | Build Road | (92, 82) | $20 | success |
| 2055 | Zone Industrial | (90, 80) | $250 | success |
| 2055 | Build Park | (67, 52) | - | failed |
| 2055 | Zone Residential | (75, 61) | - | failed |
| 2055 | Zone Residential | (59, 61) | - | failed |
| 2055 | Build Road | (74, 60) | - | failed |
| 2055 | Build Road | (73, 59) | - | failed |
| 2055 | Build Road | (72, 58) | - | failed |
| 2055 | Build Road | (71, 57) | - | failed |
| 2055 | Build Road | (70, 56) | - | failed |
| 2055 | Build Road | (69, 55) | - | failed |
| 2055 | Build Road | (68, 54) | - | failed |
| 2055 | Build Road | (67, 53) | - | failed |
| 2055 | Build Road | (66, 54) | - | failed |
| 2055 | Build Road | (65, 55) | - | failed |
| 2055 | Build Road | (64, 56) | - | failed |
| 2055 | Build Road | (63, 57) | - | failed |
| 2055 | Build Road | (62, 58) | - | failed |
| 2055 | Build Road | (61, 59) | - | failed |
| 2055 | Set Budget | - | - | success |
| 2055 | Build Road | (60, 60) | - | failed |
| 2055 | Advance | 12 months | - | success |
| 2054 | Advance | 24 months | - | success |
| 2052 | Advance | 24 months | - | success |
| 2050 | Build Road | (87, 77) | - | failed |
| 2050 | Zone Industrial | (85, 75) | - | failed |
| 2050 | Build Power Line | (42, 33) | - | failed |
| 2050 | Build Power Line | (43, 32) | - | failed |
| 2050 | Build Power Line | (44, 31) | - | failed |
| 2050 | Build Power Line | (45, 30) | $180 | success |
| 2050 | Build Park | (36, 23) | $45 | success |
| 2050 | Build Park | (34, 21) | $30 | success |
| 2050 | Build Park | (32, 19) | $20 | success |
| 2050 | Zone Residential | (40, 25) | $70 | failed |
| 2050 | Zone Residential | (35, 15) | $205 | success |
| 2050 | Zone Residential | (28, 18) | - | failed |
| 2050 | Build Road | (37, 27) | $40 | success |
| 2050 | Build Road | (36, 26) | $30 | success |
| 2050 | Build Road | (35, 25) | $20 | success |
| 2050 | Build Road | (34, 24) | $20 | success |
| 2050 | Build Road | (33, 23) | $20 | success |
| 2050 | Build Road | (32, 22) | $15 | success |
| 2050 | Build Road | (31, 21) | $10 | success |
| 2050 | Build Road | (30, 20) | $105 | success |
| 2050 | Advance | 12 months | - | success |
| 2049 | Advance | 24 months | - | success |
| 2047 | Advance | 24 months | - | success |
| 2045 | Build Park | (59, 62) | - | failed |
| 2045 | Build Park | (58, 62) | - | failed |
| 2045 | Zone Residential | (61, 65) | - | failed |
| 2045 | Zone Residential | (57, 65) | $10 | failed |
| 2045 | Zone Residential | (61, 60) | - | failed |
| 2045 | Zone Residential | (57, 60) | - | failed |
| 2045 | Build Road | (56, 60) | - | failed |
| 2045 | Build Road | (56, 61) | - | failed |
| 2045 | Build Road | (56, 62) | $20 | success |
| 2045 | Build Road | (56, 63) | - | failed |
| 2045 | Build Road | (56, 64) | - | failed |
| 2045 | Build Road | (57, 64) | $20 | success |
| 2045 | Build Road | (58, 64) | - | failed |
| 2045 | Build Road | (59, 64) | - | failed |
| 2045 | Build Road | (60, 64) | $10 | success |
| 2045 | Build Road | (60, 63) | $15 | success |
| 2045 | Build Road | (60, 62) | - | failed |
| 2045 | Build Road | (60, 61) | - | failed |
| 2045 | Build Road | (60, 60) | - | failed |
| 2045 | Advance | 12 months | - | success |
| 2044 | Advance | 24 months | - | success |
| 2042 | Advance | 24 months | - | success |
| 2040 | Zone Commercial | (92, 68) | $140 | success |
| 2040 | Zone Residential | (28, 28) | - | failed |
| 2040 | Build Road | (90, 70) | $125 | success |
| 2040 | Build Road | (30, 30) | - | failed |
| 2040 | Build Park | (62, 64) | - | failed |
| 2040 | Build Park | (61, 63) | - | failed |
| 2040 | Zone Industrial | (66, 62) | - | failed |
| 2040 | Zone Commercial | (58, 58) | - | failed |
| 2040 | Zone Residential | (65, 65) | - | failed |
| 2040 | Zone Residential | (55, 59) | $10 | failed |
| 2040 | Build Road | (56, 64) | - | failed |
| 2040 | Build Road | (57, 63) | - | failed |
| 2040 | Build Road | (58, 62) | $10 | success |
| 2040 | Build Road | (59, 61) | - | failed |
| 2040 | Build Road | (64, 64) | - | failed |
| 2040 | Build Road | (63, 63) | - | failed |
| 2040 | Build Road | (62, 62) | - | failed |
| 2040 | Build Road | (61, 61) | - | failed |
| 2040 | Build Road | (60, 60) | - | failed |
| 2040 | Advance | 12 months | - | success |
| 2039 | Advance | 24 months | - | success |
| 2037 | Advance | 24 months | - | success |
| 2035 | Build Power Line | (67, 55) | - | failed |
| 2035 | Build Power Line | (67, 50) | - | failed |
| 2035 | Build Park | (65, 65) | - | failed |
| 2035 | Build Park | (65, 55) | - | failed |
| 2035 | Zone Residential | (71, 62) | - | failed |
| 2035 | Zone Residential | (59, 62) | - | failed |
| 2035 | Zone Residential | (71, 58) | - | failed |
| 2035 | Zone Residential | (59, 58) | - | failed |
| 2035 | Build Road | (70, 60) | - | failed |
| 2035 | Build Road | (69, 60) | - | failed |
| 2035 | Build Road | (68, 60) | - | failed |
| 2035 | Build Road | (67, 60) | - | failed |
| 2035 | Build Road | (66, 60) | - | failed |
| 2035 | Build Road | (65, 60) | - | failed |
| 2035 | Build Road | (64, 60) | - | failed |
| 2035 | Build Road | (63, 60) | - | failed |
| 2035 | Build Road | (62, 60) | - | failed |
| 2035 | Build Road | (61, 60) | - | failed |
| 2035 | Build Road | (60, 60) | - | failed |
| 2035 | Advance | 12 months | - | success |
| 2034 | Advance | 24 months | - | success |
| 2032 | Advance | 24 months | - | success |
| 2030 | Build Park | (67, 51) | - | failed |
| 2030 | Build Park | (67, 52) | - | failed |
| 2030 | Zone Residential | (75, 61) | - | failed |
| 2030 | Zone Residential | (59, 61) | - | failed |
| 2030 | Build Road | (74, 60) | - | failed |
| 2030 | Build Road | (73, 59) | - | failed |
| 2030 | Build Road | (72, 58) | - | failed |
| 2030 | Build Road | (71, 57) | - | failed |
| 2030 | Build Road | (70, 56) | - | failed |
| 2030 | Build Road | (69, 55) | - | failed |
| 2030 | Build Road | (68, 54) | - | failed |
| 2030 | Build Road | (67, 53) | - | failed |
| 2030 | Build Road | (66, 54) | - | failed |
| 2030 | Build Road | (65, 55) | - | failed |
| 2030 | Build Road | (64, 56) | - | failed |
| 2030 | Build Road | (63, 57) | - | failed |
| 2030 | Build Road | (62, 58) | - | failed |
| 2030 | Build Road | (61, 59) | - | failed |
| 2030 | Build Road | (60, 60) | - | failed |
| 2030 | Advance | 12 months | - | success |
| 2029 | Advance | 24 months | - | success |
| 2027 | Advance | 24 months | - | success |
| 2025 | Build Power Line | (24, 25) | - | failed |
| 2025 | Build Power Line | (25, 24) | - | failed |
| 2025 | Build Park | (20, 25) | - | failed |
| 2025 | Build Park | (25, 20) | - | failed |
| 2025 | Zone Residential | (29, 29) | - | failed |
| 2025 | Zone Residential | (19, 19) | - | failed |
| 2025 | Build Road | (28, 28) | - | failed |
| 2025 | Build Road | (27, 27) | - | failed |
| 2025 | Build Road | (26, 26) | - | failed |
| 2025 | Build Road | (25, 25) | - | failed |
| 2025 | Build Road | (24, 24) | - | failed |
| 2025 | Build Road | (23, 23) | - | failed |
| 2025 | Build Road | (22, 22) | - | failed |
| 2025 | Build Road | (21, 21) | - | failed |
| 2025 | Build Road | (20, 20) | - | failed |
| 2025 | Advance | 12 months | - | success |
| 2024 | Advance | 24 months | - | success |
| 2022 | Advance | 24 months | - | success |
| 2020 | Build Power Line | (51, 20) | - | failed |
| 2020 | Build Power Line | (50, 20) | - | failed |
| 2020 | Build Park | (45, 19) | $10 | success |
| 2020 | Build Park | (45, 18) | - | failed |
| 2020 | Zone Commercial | (47, 23) | $205 | success |
| 2020 | Zone Commercial | (44, 23) | $215 | success |
| 2020 | Zone Commercial | (41, 23) | $205 | success |
| 2020 | Zone Residential | (46, 17) | $165 | success |
| 2020 | Zone Residential | (43, 17) | $205 | success |
| 2020 | Zone Residential | (40, 17) | $120 | success |
| 2020 | Build Road | (49, 20) | $10 | success |
| 2020 | Build Road | (48, 20) | $10 | success |
| 2020 | Build Road | (47, 20) | $10 | success |
| 2020 | Build Road | (46, 20) | $10 | success |
| 2020 | Build Road | (45, 20) | $10 | success |
| 2020 | Build Road | (44, 20) | $10 | success |
| 2020 | Build Road | (43, 20) | $10 | success |
| 2020 | Build Road | (42, 20) | $10 | success |
| 2020 | Build Road | (41, 20) | $10 | success |
| 2020 | Build Road | (40, 20) | $180 | success |
| 2020 | Advance | 12 months | - | success |
| 2019 | Advance | 24 months | - | success |
| 2017 | Advance | 24 months | - | success |
| 2015 | Build Power Line | (80, 80) | - | failed |
| 2015 | Build Road | (82, 82) | $65 | success |
| 2015 | Zone Industrial | (85, 75) | $305 | success |
| 2015 | Zone Industrial | (80, 80) | $730 | success |
| 2015 | Build Park | (20, 24) | - | failed |
| 2015 | Build Park | (24, 20) | - | failed |
| 2015 | Build Power Line | (25, 25) | - | failed |
| 2015 | Build Power Line | (20, 20) | - | failed |
| 2015 | Zone Residential | (29, 27) | - | failed |
| 2015 | Zone Residential | (26, 22) | $10 | failed |
| 2015 | Zone Residential | (22, 18) | - | failed |
| 2015 | Zone Residential | (18, 20) | - | failed |
| 2015 | Build Road | (27, 27) | - | failed |
| 2015 | Build Road | (26, 26) | - | failed |
| 2015 | Build Road | (25, 25) | - | failed |
| 2015 | Build Road | (24, 24) | - | failed |
| 2015 | Build Road | (23, 23) | - | failed |
| 2015 | Build Road | (22, 22) | - | failed |
| 2015 | Build Road | (21, 21) | - | failed |
| 2015 | Build Road | (20, 20) | - | failed |
| 2015 | Advance | 12 months | - | success |
| 2014 | Advance | 24 months | - | success |
| 2012 | Advance | 24 months | - | success |
| 2010 | Build Park | (63, 55) | - | failed |
| 2010 | Build Park | (65, 57) | - | failed |
| 2010 | Build Park | (59, 51) | - | failed |
| 2010 | Zone Industrial | (64, 52) | - | failed |
| 2010 | Zone Commercial | (67, 55) | - | failed |
| 2010 | Zone Commercial | (61, 49) | - | failed |
| 2010 | Zone Residential | (70, 60) | - | failed |
| 2010 | Zone Residential | (58, 48) | - | failed |
| 2010 | Build Road | (68, 58) | - | failed |
| 2010 | Build Road | (67, 57) | - | failed |
| 2010 | Build Road | (66, 56) | - | failed |
| 2010 | Build Road | (65, 55) | - | failed |
| 2010 | Build Road | (64, 54) | - | failed |
| 2010 | Build Road | (63, 53) | - | failed |
| 2010 | Build Road | (62, 52) | - | failed |
| 2010 | Build Road | (61, 51) | - | failed |
| 2010 | Build Road | (60, 50) | - | failed |
| 2010 | Set Budget | - | - | success |
| 2010 | Advance | 12 months | - | success |
| 2009 | Advance | 24 months | - | success |
| 2007 | Advance | 24 months | - | success |
| 2005 | Build Park | (61, 59) | - | failed |
| 2005 | Build Park | (59, 59) | - | failed |
| 2005 | Build Park | (60, 49) | - | failed |
| 2005 | Zone Residential | (63, 56) | - | failed |
| 2005 | Zone Residential | (57, 56) | - | failed |
| 2005 | Zone Residential | (63, 53) | - | failed |
| 2005 | Zone Residential | (57, 53) | - | failed |
| 2005 | Zone Residential | (63, 50) | - | failed |
| 2005 | Zone Residential | (57, 50) | - | failed |
| 2005 | Build Road | (60, 58) | - | failed |
| 2005 | Build Road | (60, 57) | - | failed |
| 2005 | Build Road | (60, 56) | - | failed |
| 2005 | Build Road | (60, 55) | - | failed |
| 2005 | Build Road | (60, 54) | - | failed |
| 2005 | Build Road | (60, 53) | - | failed |
| 2005 | Build Road | (60, 52) | - | failed |
| 2005 | Build Road | (60, 51) | - | failed |
| 2005 | Set Budget | - | - | success |
| 2005 | Build Road | (60, 50) | - | failed |
| 2005 | Advance | 12 months | - | success |
| 2004 | Advance | 24 months | - | success |
| 2002 | Advance | 24 months | - | success |
| 2000 | Build Park | (61, 55) | - | failed |
| 2000 | Build Park | (59, 53) | - | failed |
| 2000 | Build Park | (61, 51) | - | failed |
| 2000 | Zone Residential | (62, 60) | - | failed |
| 2000 | Zone Residential | (58, 58) | - | failed |
| 2000 | Zone Residential | (62, 56) | - | failed |
| 2000 | Zone Residential | (58, 54) | - | failed |
| 2000 | Zone Residential | (62, 52) | - | failed |
| 2000 | Zone Residential | (58, 50) | - | failed |
| 2000 | Build Road | (60, 60) | - | failed |
| 2000 | Build Road | (60, 59) | - | failed |
| 2000 | Build Road | (60, 58) | - | failed |
| 2000 | Build Road | (60, 57) | - | failed |
| 2000 | Build Road | (60, 56) | - | failed |
| 2000 | Build Road | (60, 55) | - | failed |
| 2000 | Build Road | (60, 54) | - | failed |
| 2000 | Build Road | (60, 53) | - | failed |
| 2000 | Build Road | (60, 52) | - | failed |
| 2000 | Build Road | (60, 51) | - | failed |
| 2000 | Build Road | (60, 50) | - | failed |
| 2000 | Advance | 12 months | - | success |
| 1999 | Advance | 24 months | - | success |
| 1997 | Advance | 24 months | - | success |
| 1995 | Build Park | (61, 49) | - | failed |
| 1995 | Build Park | (59, 49) | - | failed |
| 1995 | Build Park | (60, 49) | - | failed |
| 1995 | Zone Residential | (57, 58) | - | failed |
| 1995 | Zone Residential | (63, 56) | - | failed |
| 1995 | Zone Residential | (57, 54) | - | failed |
| 1995 | Zone Residential | (63, 52) | - | failed |
| 1995 | Zone Residential | (57, 50) | - | failed |
| 1995 | Build Road | (60, 58) | - | failed |
| 1995 | Build Road | (60, 57) | - | failed |
| 1995 | Build Road | (60, 56) | - | failed |
| 1995 | Build Road | (60, 55) | - | failed |
| 1995 | Build Road | (60, 54) | - | failed |
| 1995 | Build Road | (60, 53) | - | failed |
| 1995 | Build Road | (60, 52) | - | failed |
| 1995 | Build Road | (60, 51) | - | failed |
| 1995 | Build Road | (60, 50) | - | failed |
| 1995 | Advance | 12 months | - | success |
| 1994 | Advance | 24 months | - | success |
| 1992 | Advance | 24 months | - | success |
| 1990 | Build Park | (58, 50) | - | failed |
| 1990 | Build Park | (57, 50) | - | failed |
| 1990 | Build Park | (56, 50) | - | failed |
| 1990 | Build Park | (55, 50) | - | failed |
| 1990 | Zone Residential | (61, 58) | - | failed |
| 1990 | Zone Residential | (54, 58) | $10 | failed |
Population 3,460
Funds $11,669
Year 2105
Score 314
Class Town
Approval
Demand
Population Breakdown
Residential 85
Commercial 4
Industrial 7
Assessed Value
Value $4,475,000
Top Problems
Infrastructure
0 Police
0 Fire
1 Power
0 Ports
0 Airports
0 Stadiums
295 Roads
0 Rail
Power
Powered / Total 20 / 38 (53%)
Budget
Tax Rate 7%
Cash Flow $0
Fire 100%
Police 100%
Road 100%
Environment
Crime 62
Pollution 51
Land Value 65