| Year | Action | Detail | Cost | Result |
|---|---|---|---|---|
| 2112 | Advance | 24 months | - | success |
| 2110 | Advance | 24 months | - | success |
| 2108 | Advance | 24 months | - | success |
| 2106 | Advance | 24 months | - | success |
| 2104 | Advance | 24 months | - | success |
| 2102 | build_wire_line | - | $65 | success |
| 2102 | Build Police Station | (64, 90) | $500 | success |
| 2102 | Zone Commercial | (67, 93) | $105 | success |
| 2102 | Zone Residential | (64, 93) | $130 | success |
| 2102 | Zone Industrial | (61, 93) | $115 | success |
| 2102 | Zone Industrial | (67, 90) | $110 | success |
| 2102 | Zone Industrial | (61, 90) | $120 | success |
| 2102 | Zone Industrial | (67, 87) | $125 | success |
| 2102 | Zone Industrial | (64, 87) | $135 | success |
| 2102 | Zone Industrial | (61, 87) | $195 | success |
| 2102 | build_road_rect | (59, 85) | $400 | success |
| 2102 | Build Airport | (64, 90) | - | failed |
| 2102 | Build Stadium | (64, 90) | - | failed |
| 2102 | Advance | 24 months | - | success |
| 2100 | Advance | 24 months | - | success |
| 2098 | Advance | 24 months | - | success |
| 2096 | Build Airport | (64, 90) | - | failed |
| 2096 | Build Stadium | (64, 90) | - | failed |
| 2096 | Advance | 24 months | - | success |
| 2094 | Advance | 24 months | - | success |
| 2092 | Advance | 24 months | - | success |
| 2090 | Build Airport | (64, 90) | - | failed |
| 2090 | Build Stadium | (64, 90) | - | failed |
| 2090 | Advance | 24 months | - | success |
| 2088 | Advance | 24 months | - | success |
| 2086 | Advance | 24 months | - | success |
| 2084 | Build Airport | (64, 90) | $120 | failed |
| 2084 | Build Stadium | (64, 90) | $100 | failed |
| 2084 | Advance | 24 months | - | success |
| 2082 | Advance | 24 months | - | success |
| 2080 | Advance | 24 months | - | success |
| 2078 | build_wire_line | - | $75 | success |
| 2078 | Build Park | (64, 79) | $20 | success |
| 2078 | Zone Commercial | (67, 82) | $115 | success |
| 2078 | Zone Industrial | (64, 82) | $130 | success |
| 2078 | Zone Industrial | (61, 82) | $155 | success |
| 2078 | Zone Residential | (67, 79) | $120 | success |
| 2078 | Zone Residential | (61, 79) | $170 | success |
| 2078 | Zone Industrial | (67, 76) | $100 | success |
| 2078 | Zone Industrial | (64, 76) | $105 | success |
| 2078 | Zone Industrial | (61, 76) | $125 | success |
| 2078 | build_road_rect | (59, 74) | $400 | success |
| 2078 | Build Airport | (64, 79) | - | failed |
| 2078 | Build Stadium | (64, 79) | - | failed |
| 2078 | Advance | 24 months | - | success |
| 2076 | Advance | 24 months | - | success |
| 2074 | Advance | 24 months | - | success |
| 2072 | Build Airport | (64, 79) | - | failed |
| 2072 | Build Stadium | (64, 79) | - | failed |
| 2072 | Advance | 24 months | - | success |
| 2070 | Advance | 24 months | - | success |
| 2068 | Advance | 24 months | - | success |
| 2066 | Build Airport | (64, 79) | $110 | failed |
| 2066 | Build Stadium | (64, 79) | $20 | failed |
| 2066 | Advance | 24 months | - | success |
| 2064 | Advance | 24 months | - | success |
| 2062 | Advance | 24 months | - | success |
| 2060 | build_wire_line | - | $90 | success |
| 2060 | Build Police Station | (64, 68) | - | failed |
| 2060 | Zone Commercial | (67, 71) | - | failed |
| 2060 | Zone Residential | (64, 71) | $130 | success |
| 2060 | Zone Industrial | (61, 71) | $115 | success |
| 2060 | Zone Commercial | (67, 68) | - | failed |
| 2060 | Zone Residential | (61, 68) | $120 | success |
| 2060 | Zone Industrial | (67, 65) | - | failed |
| 2060 | Zone Commercial | (64, 65) | - | failed |
| 2060 | Zone Residential | (61, 65) | $125 | success |
| 2060 | build_road_rect | (59, 63) | $330 | success |
| 2060 | Build Airport | (64, 68) | - | failed |
| 2060 | Build Stadium | (64, 68) | - | failed |
| 2060 | Advance | 24 months | - | success |
| 2058 | Advance | 24 months | - | success |
| 2056 | Advance | 24 months | - | success |
| 2054 | Build Airport | (64, 68) | - | failed |
| 2054 | Build Stadium | (64, 68) | - | failed |
| 2054 | Advance | 24 months | - | success |
| 2052 | Advance | 24 months | - | success |
| 2050 | Advance | 24 months | - | success |
| 2048 | Build Airport | (64, 68) | - | failed |
| 2048 | Build Stadium | (64, 68) | - | failed |
| 2048 | Advance | 24 months | - | success |
| 2046 | Advance | 24 months | - | success |
| 2044 | Advance | 24 months | - | success |
| 2042 | Build Airport | (64, 68) | - | failed |
| 2042 | Build Stadium | (64, 68) | - | failed |
| 2042 | Advance | 12 months | - | success |
| 2041 | Advance | 24 months | - | success |
| 2039 | Advance | 24 months | - | success |
| 2037 | Advance | 24 months | - | success |
| 2035 | Advance | 24 months | - | success |
| 2033 | Advance | 24 months | - | success |
| 2031 | build_wire_line | - | $30 | success |
| 2031 | Build Park | (64, 57) | $80 | success |
| 2031 | Zone Residential | (67, 60) | - | failed |
| 2031 | Zone Residential | (64, 60) | - | failed |
| 2031 | Zone Industrial | (61, 60) | $150 | success |
| 2031 | Zone Commercial | (67, 57) | - | failed |
| 2031 | Zone Commercial | (61, 57) | $225 | success |
| 2031 | Zone Residential | (67, 54) | $120 | success |
| 2031 | Zone Residential | (64, 54) | $100 | success |
| 2031 | Zone Residential | (61, 54) | $160 | success |
| 2031 | build_road_rect | (59, 52) | $400 | success |
| 2031 | Zone Residential | (67, 49) | - | failed |
| 2031 | Zone Residential | (64, 49) | - | failed |
| 2031 | Zone Industrial | (61, 49) | $285 | success |
| 2031 | Zone Commercial | (67, 46) | - | failed |
| 2031 | Zone Commercial | (61, 46) | - | failed |
| 2031 | Zone Residential | (67, 43) | - | failed |
| 2031 | Zone Residential | (64, 43) | - | failed |
| 2031 | Zone Residential | (61, 43) | - | failed |
| 2031 | Set Budget | - | - | success |
| 2031 | build_road_rect | (59, 41) | $280 | success |
| 2031 | Build Coal Power | (103, 64) | - | failed |
| 2031 | Build Coal Power | (103, 47) | - | failed |
| 2031 | Build Coal Power | (115, 52) | - | failed |
| 2031 | Build Coal Power | (98, 52) | - | failed |
| 2031 | Build Coal Power | (92, 64) | - | failed |
| 2031 | Build Coal Power | (92, 47) | - | failed |
| 2031 | Build Coal Power | (104, 52) | - | failed |
| 2031 | Build Coal Power | (87, 52) | - | failed |
| 2031 | Build Coal Power | (81, 64) | - | failed |
| 2031 | Build Coal Power | (81, 47) | - | failed |
| 2031 | Build Coal Power | (93, 52) | - | failed |
| 2031 | Build Coal Power | (76, 52) | - | failed |
| 2031 | Build Coal Power | (70, 80) | - | failed |
| 2031 | Build Coal Power | (82, 85) | - | failed |
| 2031 | Build Coal Power | (65, 85) | - | failed |
| 2031 | Build Coal Power | (103, 80) | - | failed |
| 2031 | Build Coal Power | (115, 85) | - | failed |
| 2031 | Build Coal Power | (98, 85) | - | failed |
| 2031 | Build Coal Power | (92, 50) | - | failed |
| 2031 | Build Coal Power | (68, 74) | - | failed |
| 2031 | Build Coal Power | (92, 56) | - | failed |
| 2031 | Build Coal Power | (92, 92) | - | failed |
| 2031 | Build Coal Power | (74, 74) | - | failed |
| 2031 | Build Coal Power | (110, 74) | - | failed |
| 2031 | Build Coal Power | (80, 86) | - | failed |
| 2031 | Build Coal Power | (104, 62) | - | failed |
| 2031 | Build Coal Power | (80, 62) | - | failed |
| 2031 | Build Coal Power | (104, 86) | - | failed |
| 2031 | Build Coal Power | (92, 62) | - | failed |
| 2031 | Build Coal Power | (92, 86) | - | failed |
| 2031 | Build Coal Power | (80, 74) | - | failed |
| 2031 | Build Coal Power | (104, 74) | - | failed |
| 2031 | Build Coal Power | (92, 74) | - | failed |
| 2031 | Build Coal Power | (98, 74) | - | failed |
| 2031 | Build Coal Power | (86, 74) | - | failed |
| 2031 | Build Coal Power | (92, 80) | - | failed |
| 2031 | Build Coal Power | (92, 68) | - | failed |
| 2031 | Build Airport | (64, 46) | - | failed |
| 2031 | Build Stadium | (64, 46) | - | failed |
| 2031 | Advance | 24 months | - | success |
| 2029 | Advance | 24 months | - | success |
| 2027 | Advance | 24 months | - | success |
| 2025 | Build Coal Power | (103, 64) | - | failed |
| 2025 | Build Coal Power | (103, 47) | - | failed |
| 2025 | Build Coal Power | (115, 52) | - | failed |
| 2025 | Build Coal Power | (98, 52) | - | failed |
| 2025 | Build Coal Power | (92, 64) | - | failed |
| 2025 | Build Coal Power | (92, 47) | - | failed |
| 2025 | Build Coal Power | (104, 52) | - | failed |
| 2025 | Build Coal Power | (87, 52) | - | failed |
| 2025 | Build Coal Power | (81, 64) | - | failed |
| 2025 | Build Coal Power | (81, 47) | - | failed |
| 2025 | Build Coal Power | (93, 52) | - | failed |
| 2025 | Build Coal Power | (76, 52) | - | failed |
| 2025 | Build Coal Power | (70, 80) | - | failed |
| 2025 | Build Coal Power | (82, 85) | - | failed |
| 2025 | Build Coal Power | (65, 85) | - | failed |
| 2025 | Build Coal Power | (103, 80) | - | failed |
| 2025 | Build Coal Power | (115, 85) | - | failed |
| 2025 | Build Coal Power | (98, 85) | - | failed |
| 2025 | Build Coal Power | (92, 50) | - | failed |
| 2025 | Build Coal Power | (68, 74) | - | failed |
| 2025 | Build Coal Power | (92, 56) | - | failed |
| 2025 | Build Coal Power | (92, 92) | - | failed |
| 2025 | Build Coal Power | (74, 74) | - | failed |
| 2025 | Build Coal Power | (110, 74) | - | failed |
| 2025 | Build Coal Power | (80, 86) | - | failed |
| 2025 | Build Coal Power | (104, 62) | - | failed |
| 2025 | Build Coal Power | (80, 62) | - | failed |
| 2025 | Build Coal Power | (104, 86) | - | failed |
| 2025 | Build Coal Power | (92, 62) | - | failed |
| 2025 | Build Coal Power | (92, 86) | - | failed |
| 2025 | Build Coal Power | (80, 74) | - | failed |
| 2025 | Build Coal Power | (104, 74) | - | failed |
| 2025 | Build Coal Power | (92, 74) | - | failed |
| 2025 | Build Coal Power | (98, 74) | - | failed |
| 2025 | Build Coal Power | (86, 74) | - | failed |
| 2025 | Build Coal Power | (92, 80) | - | failed |
| 2025 | Build Coal Power | (92, 68) | - | failed |
| 2025 | Build Airport | (64, 46) | - | failed |
| 2025 | Build Stadium | (64, 46) | - | failed |
| 2025 | Advance | 24 months | - | success |
| 2023 | Advance | 24 months | - | success |
| 2019 | Set Budget | - | - | success |
| 2021 | Advance | 24 months | - | success |
| 2019 | Build Coal Power | (103, 64) | - | failed |
| 2019 | Build Coal Power | (103, 47) | - | failed |
| 2019 | Build Coal Power | (115, 52) | - | failed |
| 2019 | Build Coal Power | (98, 52) | - | failed |
| 2019 | Build Coal Power | (92, 64) | - | failed |
| 2019 | Build Coal Power | (92, 47) | - | failed |
| 2019 | Build Coal Power | (104, 52) | - | failed |
| 2019 | Build Coal Power | (87, 52) | - | failed |
| 2019 | Build Coal Power | (81, 64) | - | failed |
| 2019 | Build Coal Power | (81, 47) | - | failed |
| 2019 | Build Coal Power | (93, 52) | - | failed |
| 2019 | Build Coal Power | (76, 52) | - | failed |
| 2019 | Build Coal Power | (70, 80) | - | failed |
| 2019 | Build Coal Power | (82, 85) | - | failed |
| 2019 | Build Coal Power | (65, 85) | - | failed |
| 2019 | Build Coal Power | (103, 80) | - | failed |
| 2019 | Build Coal Power | (115, 85) | - | failed |
| 2019 | Build Coal Power | (98, 85) | - | failed |
| 2019 | Build Coal Power | (92, 50) | - | failed |
| 2019 | Build Coal Power | (68, 74) | - | failed |
| 2019 | Build Coal Power | (92, 56) | - | failed |
| 2019 | Build Coal Power | (92, 92) | - | failed |
| 2019 | Build Coal Power | (74, 74) | - | failed |
| 2019 | Build Coal Power | (110, 74) | - | failed |
| 2019 | Build Coal Power | (80, 86) | - | failed |
| 2019 | Build Coal Power | (104, 62) | - | failed |
| 2019 | Build Coal Power | (80, 62) | - | failed |
| 2019 | Build Coal Power | (104, 86) | - | failed |
| 2019 | Build Coal Power | (92, 62) | - | failed |
| 2019 | Build Coal Power | (92, 86) | - | failed |
| 2019 | Build Coal Power | (80, 74) | - | failed |
| 2019 | Build Coal Power | (104, 74) | - | failed |
| 2019 | Build Coal Power | (92, 74) | - | failed |
| 2019 | Build Coal Power | (98, 74) | - | failed |
| 2019 | Build Coal Power | (86, 74) | - | failed |
| 2019 | Build Coal Power | (92, 80) | - | failed |
| 2019 | Build Coal Power | (92, 68) | - | failed |
| 2019 | Build Airport | (64, 46) | - | failed |
| 2019 | Build Stadium | (64, 46) | - | failed |
| 2019 | Advance | 24 months | - | success |
| 2017 | Advance | 24 months | - | success |
| 2015 | Advance | 24 months | - | success |
| 2013 | Set Budget | - | - | success |
| 2013 | Build Coal Power | (103, 64) | - | failed |
| 2013 | Build Coal Power | (103, 47) | - | failed |
| 2013 | Build Coal Power | (115, 52) | - | failed |
| 2013 | Build Coal Power | (98, 52) | - | failed |
| 2013 | Build Coal Power | (92, 64) | - | failed |
| 2013 | Build Coal Power | (92, 47) | - | failed |
| 2013 | Build Coal Power | (104, 52) | - | failed |
| 2013 | Build Coal Power | (87, 52) | - | failed |
| 2013 | Build Coal Power | (81, 64) | - | failed |
| 2013 | Build Coal Power | (81, 47) | - | failed |
| 2013 | Build Coal Power | (93, 52) | - | failed |
| 2013 | Build Coal Power | (76, 52) | - | failed |
| 2013 | Build Coal Power | (70, 80) | - | failed |
| 2013 | Build Coal Power | (82, 85) | - | failed |
| 2013 | Build Coal Power | (65, 85) | - | failed |
| 2013 | Build Coal Power | (103, 80) | - | failed |
| 2013 | Build Coal Power | (115, 85) | - | failed |
| 2013 | Build Coal Power | (98, 85) | - | failed |
| 2013 | Build Coal Power | (92, 50) | - | failed |
| 2013 | Build Coal Power | (68, 74) | - | failed |
| 2013 | Build Coal Power | (92, 56) | - | failed |
| 2013 | Build Coal Power | (92, 92) | - | failed |
| 2013 | Build Coal Power | (74, 74) | - | failed |
| 2013 | Build Coal Power | (110, 74) | - | failed |
| 2013 | Build Coal Power | (80, 86) | - | failed |
| 2013 | Build Coal Power | (104, 62) | - | failed |
| 2013 | Build Coal Power | (80, 62) | - | failed |
| 2013 | Build Coal Power | (104, 86) | - | failed |
| 2013 | Build Coal Power | (92, 62) | - | failed |
| 2013 | Build Coal Power | (92, 86) | - | failed |
| 2013 | Build Coal Power | (80, 74) | - | failed |
| 2013 | Build Coal Power | (104, 74) | - | failed |
| 2013 | Build Coal Power | (92, 74) | - | failed |
| 2013 | Build Coal Power | (98, 74) | - | failed |
| 2013 | Build Coal Power | (86, 74) | - | failed |
| 2013 | Build Coal Power | (92, 80) | - | failed |
| 2013 | Build Coal Power | (92, 68) | - | failed |
| 2013 | Build Airport | (64, 46) | - | failed |
| 2013 | Build Stadium | (64, 46) | - | failed |
| 2013 | Advance | 24 months | - | success |
| 2011 | Advance | 24 months | - | success |
| 2007 | Set Budget | - | - | success |
| 2009 | Advance | 24 months | - | success |
| 2007 | Build Coal Power | (103, 64) | - | failed |
| 2007 | Build Coal Power | (103, 47) | $80 | failed |
| 2007 | Build Coal Power | (115, 52) | - | failed |
| 2007 | Build Coal Power | (98, 52) | - | failed |
| 2007 | Build Coal Power | (92, 64) | - | failed |
| 2007 | Build Coal Power | (92, 47) | $80 | failed |
| 2007 | Build Coal Power | (104, 52) | - | failed |
| 2007 | Build Coal Power | (87, 52) | - | failed |
| 2007 | Build Coal Power | (81, 64) | - | failed |
| 2007 | Build Coal Power | (81, 47) | $100 | failed |
| 2007 | Build Coal Power | (93, 52) | - | failed |
| 2007 | Build Coal Power | (76, 52) | - | failed |
| 2007 | Build Coal Power | (70, 80) | $120 | failed |
| 2007 | Build Coal Power | (82, 85) | - | failed |
| 2007 | Build Coal Power | (65, 85) | $100 | failed |
| 2007 | Build Coal Power | (103, 80) | - | failed |
| 2007 | Build Coal Power | (115, 85) | - | failed |
| 2007 | Build Coal Power | (98, 85) | - | failed |
| 2007 | Build Coal Power | (92, 50) | $30 | failed |
| 2007 | Build Coal Power | (68, 74) | $80 | failed |
| 2007 | Build Coal Power | (92, 56) | - | failed |
| 2007 | Build Coal Power | (92, 92) | - | failed |
| 2007 | Build Coal Power | (74, 74) | $50 | failed |
| 2007 | Build Coal Power | (110, 74) | - | failed |
| 2007 | Build Coal Power | (80, 86) | - | failed |
| 2007 | Build Coal Power | (104, 62) | - | failed |
| 2007 | Build Coal Power | (80, 62) | $20 | failed |
| 2007 | Build Coal Power | (104, 86) | $20 | failed |
| 2007 | Build Coal Power | (92, 62) | $10 | failed |
| 2007 | Build Coal Power | (92, 86) | - | failed |
| 2007 | Build Coal Power | (80, 74) | - | failed |
| 2007 | Build Coal Power | (104, 74) | - | failed |
| 2007 | Build Coal Power | (92, 74) | - | failed |
| 2007 | Build Coal Power | (98, 74) | - | failed |
| 2007 | Build Coal Power | (86, 74) | - | failed |
| 2007 | Build Coal Power | (92, 80) | - | failed |
| 2007 | Build Coal Power | (92, 68) | - | failed |
| 2007 | Build Airport | (64, 46) | - | failed |
| 2007 | Build Stadium | (64, 46) | - | failed |
| 2007 | Advance | 24 months | - | success |
| 2005 | Advance | 24 months | - | success |
| 2003 | Advance | 24 months | - | success |
| 2001 | build_wire_line | - | $5 | success |
| 2001 | Build Police Station | (108, 57) | $500 | success |
| 2001 | Zone Residential | (111, 60) | $105 | success |
| 2001 | Zone Commercial | (108, 60) | $105 | success |
| 2001 | Zone Industrial | (105, 60) | $125 | success |
| 2001 | Zone Commercial | (111, 57) | $120 | success |
| 2001 | Zone Commercial | (105, 57) | $185 | success |
| 2001 | Zone Commercial | (111, 54) | $160 | success |
| 2001 | Zone Residential | (108, 54) | $200 | success |
| 2001 | Zone Residential | (105, 54) | $190 | success |
| 2001 | build_road_rect | (103, 52) | $400 | success |
| 2001 | Build Airport | (108, 57) | $100 | failed |
| 2001 | Build Stadium | (108, 57) | $140 | failed |
| 2001 | Advance | 24 months | - | success |
| 1999 | Advance | 24 months | - | success |
| 1997 | Advance | 24 months | - | success |
| 1995 | build_wire_line | - | $20 | success |
| 1995 | Build Park | (97, 57) | $20 | success |
| 1995 | Zone Commercial | (100, 60) | $100 | success |
| 1995 | Zone Residential | (97, 60) | $105 | success |
| 1995 | Zone Industrial | (94, 60) | $145 | success |
| 1995 | Zone Industrial | (100, 57) | $120 | success |
| 1995 | Zone Industrial | (94, 57) | $105 | success |
| 1995 | Zone Industrial | (100, 54) | $135 | success |
| 1995 | Zone Industrial | (97, 54) | $125 | success |
| 1995 | Zone Industrial | (94, 54) | $105 | success |
| 1995 | build_road_rect | (92, 52) | $400 | success |
| 1995 | Build Airport | (97, 57) | - | failed |
| 1995 | Build Stadium | (97, 57) | - | failed |
| 1995 | Advance | 24 months | - | success |
| 1993 | Advance | 24 months | - | success |
| 1991 | Advance | 24 months | - | success |
| 1989 | Build Airport | (97, 57) | $10 | failed |
| 1989 | Build Stadium | (97, 57) | $60 | failed |
| 1989 | Advance | 24 months | - | success |
| 1987 | Advance | 24 months | - | success |
| 1985 | Advance | 24 months | - | success |
| 1983 | build_wire_line | - | $5 | success |
| 1983 | Build Police Station | (86, 57) | $500 | success |
| 1983 | Zone Industrial | (89, 60) | $105 | success |
| 1983 | Zone Commercial | (86, 60) | $105 | success |
| 1983 | Zone Residential | (83, 60) | $145 | success |
| 1983 | Zone Residential | (89, 57) | $100 | success |
| 1983 | Zone Residential | (83, 57) | $120 | success |
| 1983 | Zone Residential | (89, 54) | $100 | success |
| 1983 | Zone Residential | (86, 54) | $165 | success |
| 1983 | Zone Residential | (83, 54) | $105 | success |
| 1983 | build_road_rect | (81, 52) | $400 | success |
| 1983 | Build Airport | (86, 57) | $120 | failed |
| 1983 | Build Stadium | (86, 57) | - | failed |
| 1983 | Advance | 24 months | - | success |
| 1981 | Advance | 24 months | - | success |
| 1979 | Advance | 24 months | - | success |
| 1977 | Build Stadium | (86, 57) | $80 | failed |
| 1977 | Advance | 24 months | - | success |
| 1975 | Advance | 24 months | - | success |
| 1973 | Advance | 24 months | - | success |
| 1971 | build_wire_line | - | $40 | success |
| 1971 | Build Park | (75, 90) | $105 | success |
| 1971 | Zone Commercial | (78, 93) | - | failed |
| 1971 | Zone Industrial | (75, 93) | - | failed |
| 1971 | Zone Industrial | (72, 93) | $145 | success |
| 1971 | Zone Residential | (78, 90) | $100 | success |
| 1971 | Zone Residential | (72, 90) | $140 | success |
| 1971 | Zone Industrial | (78, 87) | $110 | success |
| 1971 | Zone Industrial | (75, 87) | $150 | success |
| 1971 | Zone Industrial | (72, 87) | $225 | success |
| 1971 | build_road_rect | (70, 85) | $400 | success |
| 1971 | Build Airport | (75, 90) | - | failed |
| 1971 | Build Stadium | (75, 90) | - | failed |
| 1971 | Advance | 24 months | - | success |
| 1969 | Advance | 24 months | - | success |
| 1967 | Advance | 24 months | - | success |
| 1965 | Build Airport | (75, 90) | - | failed |
| 1965 | Build Stadium | (75, 90) | - | failed |
| 1965 | Advance | 24 months | - | success |
| 1963 | Advance | 24 months | - | success |
| 1961 | Advance | 24 months | - | success |
| 1959 | Build Airport | (75, 90) | - | failed |
| 1959 | Build Stadium | (75, 90) | - | failed |
| 1959 | Advance | 12 months | - | success |
| 1958 | Advance | 24 months | - | success |
| 1956 | Advance | 24 months | - | success |
| 1954 | Advance | 24 months | - | success |
| 1952 | Advance | 24 months | - | success |
| 1950 | Advance | 24 months | - | success |
| 1948 | Zone Residential | (78, 82) | - | failed |
| 1948 | Zone Commercial | (75, 82) | - | failed |
| 1948 | Zone Residential | (72, 82) | - | failed |
| 1948 | Zone Residential | (78, 79) | - | failed |
| 1948 | Zone Industrial | (72, 79) | - | failed |
| 1948 | Zone Residential | (78, 76) | - | failed |
| 1948 | Zone Commercial | (75, 76) | - | failed |
| 1948 | Zone Residential | (72, 76) | $40 | failed |
| 1948 | build_road_rect | (70, 74) | - | failed |
| 1948 | Zone Residential | (78, 71) | - | failed |
| 1948 | Zone Commercial | (75, 71) | - | failed |
| 1948 | Zone Residential | (72, 71) | $20 | failed |
| 1948 | Zone Residential | (78, 68) | - | failed |
| 1948 | Zone Industrial | (72, 68) | - | failed |
| 1948 | Zone Residential | (78, 65) | $20 | failed |
| 1948 | Zone Commercial | (75, 65) | - | failed |
| 1948 | Zone Residential | (72, 65) | - | failed |
| 1948 | build_road_rect | (70, 63) | - | failed |
| 1948 | Zone Residential | (78, 60) | - | failed |
| 1948 | Zone Commercial | (75, 60) | - | failed |
| 1948 | Zone Residential | (72, 60) | $10 | failed |
| 1948 | Zone Residential | (78, 57) | - | failed |
| 1948 | Zone Industrial | (72, 57) | - | failed |
| 1948 | Zone Residential | (78, 54) | - | failed |
| 1948 | Zone Commercial | (75, 54) | - | failed |
| 1948 | Zone Residential | (72, 54) | - | failed |
| 1948 | build_road_rect | (70, 52) | $260 | success |
| 1948 | Build Airport | (75, 57) | $230 | failed |
| 1948 | Build Seaport | (108, 90) | $3,060 | success |
| 1948 | Build Stadium | (108, 90) | - | failed |
| 1948 | Advance | 24 months | - | success |
| 1946 | Advance | 24 months | - | success |
| 1944 | Advance | 24 months | - | success |
| 1942 | Build Airport | (108, 90) | - | failed |
| 1942 | Build Seaport | (108, 90) | - | failed |
| 1942 | Build Stadium | (108, 90) | - | failed |
| 1942 | Advance | 24 months | - | success |
| 1940 | Advance | 24 months | - | success |
| 1938 | Advance | 24 months | - | success |
| 1936 | Build Seaport | (108, 90) | - | failed |
| 1936 | Build Stadium | (108, 90) | - | failed |
| 1936 | Advance | 24 months | - | success |
| 1934 | Advance | 24 months | - | success |
| 1932 | Advance | 24 months | - | success |
| 1930 | build_wire_line | - | $10 | success |
| 1930 | Build Police Station | (108, 79) | $500 | success |
| 1930 | Zone Commercial | (111, 82) | $135 | success |
| 1930 | Zone Industrial | (108, 82) | $135 | success |
| 1930 | Zone Industrial | (105, 82) | $165 | success |
| 1930 | Zone Residential | (111, 79) | $150 | success |
| 1930 | Zone Residential | (105, 79) | $105 | success |
| 1930 | Zone Industrial | (111, 76) | $135 | success |
| 1930 | Zone Industrial | (108, 76) | $165 | success |
| 1930 | Zone Industrial | (105, 76) | $105 | success |
| 1930 | build_road_rect | (103, 74) | $400 | success |
| 1930 | Advance | 24 months | - | success |
| 1928 | Advance | 24 months | - | success |
| 1926 | Advance | 24 months | - | success |
| 1924 | build_wire_line | - | $30 | success |
| 1924 | Build Park | (108, 68) | $20 | success |
| 1924 | Zone Industrial | (111, 71) | $115 | success |
| 1924 | Zone Commercial | (108, 71) | $140 | success |
| 1924 | Zone Residential | (105, 71) | $145 | success |
| 1924 | Zone Residential | (111, 68) | $130 | success |
| 1924 | Zone Residential | (105, 68) | $105 | success |
| 1924 | Zone Residential | (111, 65) | $150 | success |
| 1924 | Zone Residential | (108, 65) | $200 | success |
| 1924 | Zone Residential | (105, 65) | $135 | success |
| 1924 | build_road_rect | (103, 63) | $400 | success |
| 1924 | Advance | 24 months | - | success |
| 1922 | Advance | 24 months | - | success |
| 1920 | Advance | 24 months | - | success |
| 1918 | build_wire_line | - | - | failed |
| 1918 | Build Police Station | (97, 90) | $500 | success |
| 1918 | Zone Commercial | (100, 93) | $100 | success |
| 1918 | Zone Residential | (97, 93) | $145 | success |
| 1918 | Zone Industrial | (94, 93) | $110 | success |
| 1918 | Zone Industrial | (100, 90) | $120 | success |
| 1918 | Zone Industrial | (94, 90) | $105 | success |
| 1918 | Zone Industrial | (100, 87) | $135 | success |
| 1918 | Zone Industrial | (97, 87) | $145 | success |
| 1918 | Zone Industrial | (94, 87) | $120 | success |
| 1918 | build_road_rect | (92, 85) | $400 | success |
| 1918 | Advance | 24 months | - | success |
Population 24,960
Funds $0
Year 2112
Score 248
Class City
Approval
Demand
Population Breakdown
Residential 560
Commercial 39
Industrial 47
Assessed Value
Value $18,735,000
Top Problems
Infrastructure
6 Police
0 Fire
1 Power
1 Ports
0 Airports
0 Stadiums
972 Roads
0 Rail
Power
Powered / Total 47 / 106 (44%)
Budget
Tax Rate 7%
Cash Flow $0
Fire 100%
Police 86%
Road 100%
Environment
Crime 24
Pollution 64
Land Value 83