Grand Dell
Ended
| Year | Action | Detail | Cost | Result |
|---|---|---|---|---|
| 2056 | Advance | 24 months | - | success |
| 2054 | Advance | 24 months | - | success |
| 2052 | Advance | 24 months | - | success |
| 2050 | build_wire_line | - | $35 | success |
| 2050 | Build Park | (30, 70) | $20 | success |
| 2050 | Zone Industrial | (33, 73) | $155 | success |
| 2050 | Zone Commercial | (30, 73) | $170 | success |
| 2050 | Zone Residential | (27, 73) | $155 | success |
| 2050 | Zone Residential | (33, 70) | $180 | success |
| 2050 | Zone Commercial | (27, 70) | $145 | success |
| 2050 | Zone Commercial | (33, 67) | $165 | success |
| 2050 | Zone Commercial | (30, 67) | $165 | success |
| 2050 | Zone Commercial | (27, 67) | $140 | success |
| 2050 | build_road_rect | (25, 65) | $400 | success |
| 2050 | Advance | 24 months | - | success |
| 2048 | Advance | 24 months | - | success |
| 2046 | Advance | 24 months | - | success |
| 2044 | build_wire_line | - | $25 | success |
| 2044 | Build Police Station | (19, 70) | $500 | success |
| 2044 | Zone Commercial | (22, 73) | $155 | success |
| 2044 | Zone Commercial | (19, 73) | $155 | success |
| 2044 | Zone Commercial | (16, 73) | $165 | success |
| 2044 | Zone Residential | (22, 70) | $170 | success |
| 2044 | Zone Residential | (16, 70) | $145 | success |
| 2044 | Zone Commercial | (22, 67) | $155 | success |
| 2044 | Zone Commercial | (19, 67) | $145 | success |
| 2044 | Zone Commercial | (16, 67) | $155 | success |
| 2044 | build_road_rect | (14, 65) | $400 | success |
| 2044 | Advance | 24 months | - | success |
| 2042 | Advance | 24 months | - | success |
| 2040 | Advance | 24 months | - | success |
| 2038 | build_wire_line | - | $45 | success |
| 2038 | Build Park | (8, 70) | $30 | success |
| 2038 | Zone Residential | (11, 73) | $110 | success |
| 2038 | Zone Commercial | (8, 73) | $165 | success |
| 2038 | Zone Industrial | (5, 73) | $115 | success |
| 2038 | Zone Commercial | (11, 70) | $160 | success |
| 2038 | Zone Commercial | (5, 70) | $130 | success |
| 2038 | Zone Commercial | (11, 67) | $135 | success |
| 2038 | Zone Residential | (8, 67) | $190 | success |
| 2038 | Zone Residential | (5, 67) | $135 | success |
| 2038 | build_road_rect | (3, 65) | $400 | success |
| 2038 | Zone Residential | (66, 62) | - | failed |
| 2038 | Zone Commercial | (63, 62) | - | failed |
| 2038 | Zone Industrial | (60, 62) | - | failed |
| 2038 | Zone Commercial | (66, 59) | - | failed |
| 2038 | Zone Commercial | (60, 59) | - | failed |
| 2038 | Zone Commercial | (66, 56) | - | failed |
| 2038 | Zone Residential | (63, 56) | - | failed |
| 2038 | Zone Residential | (60, 56) | - | failed |
| 2038 | build_road_rect | (58, 54) | $310 | success |
| 2038 | Zone Residential | (66, 51) | - | failed |
| 2038 | Zone Commercial | (63, 51) | - | failed |
| 2038 | Zone Industrial | (60, 51) | - | failed |
| 2038 | Zone Commercial | (66, 48) | - | failed |
| 2038 | Zone Commercial | (60, 48) | - | failed |
| 2038 | Zone Commercial | (66, 45) | - | failed |
| 2038 | Zone Residential | (63, 45) | - | failed |
| 2038 | Zone Residential | (60, 45) | - | failed |
| 2038 | build_road_rect | (58, 43) | $280 | success |
| 2038 | Advance | 24 months | - | success |
| 2036 | Advance | 24 months | - | success |
| 2034 | Advance | 24 months | - | success |
| 2032 | build_wire_line | - | $75 | success |
| 2032 | Build Park | (63, 37) | $100 | success |
| 2032 | Zone Residential | (66, 40) | - | failed |
| 2032 | Zone Commercial | (63, 40) | - | failed |
| 2032 | Zone Industrial | (60, 40) | $100 | success |
| 2032 | Zone Commercial | (66, 37) | - | failed |
| 2032 | Zone Commercial | (60, 37) | $105 | success |
| 2032 | Zone Commercial | (66, 34) | - | failed |
| 2032 | Zone Residential | (63, 34) | $105 | success |
| 2032 | Zone Residential | (60, 34) | $155 | success |
| 2032 | build_road_rect | (58, 32) | $370 | success |
| 2032 | Advance | 24 months | - | success |
| 2030 | Advance | 24 months | - | success |
| 2028 | Advance | 24 months | - | success |
| 2026 | build_wire_line | - | $20 | success |
| 2026 | Build Park | (63, 26) | $100 | success |
| 2026 | Zone Residential | (66, 29) | - | failed |
| 2026 | Zone Commercial | (63, 29) | $140 | success |
| 2026 | Zone Industrial | (60, 29) | $140 | success |
| 2026 | Zone Commercial | (66, 26) | - | failed |
| 2026 | Zone Commercial | (60, 26) | $155 | success |
| 2026 | Zone Commercial | (66, 23) | - | failed |
| 2026 | Zone Residential | (63, 23) | - | failed |
| 2026 | Zone Residential | (60, 23) | $105 | success |
| 2026 | build_road_rect | (58, 21) | $310 | success |
| 2026 | Advance | 24 months | - | success |
| 2024 | Advance | 24 months | - | success |
| 2022 | Advance | 24 months | - | success |
| 2020 | build_wire_line | - | $30 | success |
| 2020 | Build Park | (63, 15) | $115 | success |
| 2020 | Zone Commercial | (66, 18) | - | failed |
| 2020 | Zone Residential | (63, 18) | $10 | failed |
| 2020 | Zone Industrial | (60, 18) | $165 | success |
| 2020 | Zone Industrial | (66, 15) | - | failed |
| 2020 | Zone Industrial | (60, 15) | $185 | success |
| 2020 | Zone Industrial | (66, 12) | - | failed |
| 2020 | Zone Industrial | (63, 12) | $105 | success |
| 2020 | Zone Industrial | (60, 12) | $145 | success |
| 2020 | build_road_rect | (58, 10) | $310 | success |
| 2020 | Zone Commercial | (55, 62) | - | failed |
| 2020 | Zone Residential | (52, 62) | - | failed |
| 2020 | Zone Industrial | (49, 62) | - | failed |
| 2020 | Zone Industrial | (55, 59) | - | failed |
| 2020 | Zone Industrial | (49, 59) | - | failed |
| 2020 | Zone Industrial | (55, 56) | - | failed |
| 2020 | Zone Industrial | (52, 56) | - | failed |
| 2020 | Zone Industrial | (49, 56) | - | failed |
| 2020 | build_road_rect | (47, 54) | $220 | success |
| 2020 | Advance | 24 months | - | success |
| 2018 | Advance | 24 months | - | success |
| 2016 | Advance | 24 months | - | success |
| 2014 | build_wire_line | - | $35 | success |
| 2014 | Build Police Station | (41, 59) | $510 | success |
| 2014 | Zone Industrial | (44, 62) | - | failed |
| 2014 | Zone Commercial | (41, 62) | $130 | success |
| 2014 | Zone Commercial | (38, 62) | $100 | success |
| 2014 | Zone Residential | (44, 59) | - | failed |
| 2014 | Zone Residential | (38, 59) | $175 | success |
| 2014 | Zone Commercial | (44, 56) | - | failed |
| 2014 | Zone Commercial | (41, 56) | $165 | success |
| 2014 | Zone Commercial | (38, 56) | $185 | success |
| 2014 | build_road_rect | (36, 54) | $310 | success |
| 2014 | Advance | 24 months | - | success |
| 2012 | Advance | 24 months | - | success |
| 2010 | Advance | 24 months | - | success |
| 2008 | build_wire_line | - | $30 | success |
| 2008 | Build Park | (30, 59) | $30 | success |
| 2008 | Zone Commercial | (33, 62) | $160 | success |
| 2008 | Zone Commercial | (30, 62) | $190 | success |
| 2008 | Zone Commercial | (27, 62) | $160 | success |
| 2008 | Zone Residential | (33, 59) | $150 | success |
| 2008 | Zone Residential | (27, 59) | $195 | success |
| 2008 | Zone Commercial | (33, 56) | $150 | success |
| 2008 | Zone Commercial | (30, 56) | $185 | success |
| 2008 | Zone Commercial | (27, 56) | $195 | success |
| 2008 | build_road_rect | (25, 54) | $400 | success |
| 2008 | Advance | 24 months | - | success |
| 2006 | Advance | 24 months | - | success |
| 2004 | Advance | 24 months | - | success |
| 2002 | build_wire_line | - | $40 | success |
| 2002 | Build Park | (19, 59) | $20 | success |
| 2002 | Zone Commercial | (22, 62) | $115 | success |
| 2002 | Zone Commercial | (19, 62) | $155 | success |
| 2002 | Zone Commercial | (16, 62) | $145 | success |
| 2002 | Zone Residential | (22, 59) | $130 | success |
| 2002 | Zone Residential | (16, 59) | $115 | success |
| 2002 | Zone Commercial | (22, 56) | $150 | success |
| 2002 | Zone Commercial | (19, 56) | $165 | success |
| 2002 | Zone Commercial | (16, 56) | $105 | success |
| 2002 | build_road_rect | (14, 54) | $400 | success |
| 2002 | Advance | 24 months | - | success |
| 2000 | Advance | 24 months | - | success |
| 1998 | Advance | 24 months | - | success |
| 1996 | build_wire_line | - | $45 | success |
| 1996 | Build Park | (8, 59) | $20 | success |
| 1996 | Zone Residential | (11, 62) | $140 | success |
| 1996 | Zone Residential | (8, 62) | $185 | success |
| 1996 | Zone Industrial | (5, 62) | $115 | success |
| 1996 | Zone Commercial | (11, 59) | $140 | success |
| 1996 | Zone Commercial | (5, 59) | $120 | success |
| 1996 | Zone Commercial | (11, 56) | $125 | success |
| 1996 | Zone Commercial | (8, 56) | $100 | success |
| 1996 | Zone Residential | (5, 56) | $105 | success |
| 1996 | build_road_rect | (3, 54) | $400 | success |
| 1996 | Zone Residential | (55, 51) | - | failed |
| 1996 | Zone Residential | (52, 51) | - | failed |
| 1996 | Zone Industrial | (49, 51) | - | failed |
| 1996 | Zone Commercial | (55, 48) | - | failed |
| 1996 | Zone Commercial | (49, 48) | - | failed |
| 1996 | Zone Commercial | (55, 45) | $105 | success |
| 1996 | Zone Commercial | (52, 45) | - | failed |
| 1996 | Zone Residential | (49, 45) | - | failed |
| 1996 | build_road_rect | (47, 43) | $390 | success |
| 1996 | Advance | 24 months | - | success |
| 1994 | Advance | 24 months | - | success |
| 1992 | Advance | 24 months | - | success |
| 1990 | build_wire_line | - | $75 | success |
| 1990 | Build Park | (52, 37) | $20 | success |
| 1990 | Zone Residential | (55, 40) | $115 | success |
| 1990 | Zone Commercial | (52, 40) | $130 | success |
| 1990 | Zone Industrial | (49, 40) | $135 | success |
| 1990 | Zone Commercial | (55, 37) | $120 | success |
| 1990 | Zone Commercial | (49, 37) | $160 | success |
| 1990 | Zone Commercial | (55, 34) | $105 | success |
| 1990 | Zone Residential | (52, 34) | $105 | success |
| 1990 | Zone Residential | (49, 34) | $105 | success |
| 1990 | build_road_rect | (47, 32) | $400 | success |
| 1990 | Advance | 24 months | - | success |
| 1988 | Advance | 24 months | - | success |
| 1986 | Advance | 24 months | - | success |
| 1984 | build_wire_line | - | $30 | success |
| 1984 | Build Police Station | (52, 26) | $510 | success |
| 1984 | Zone Industrial | (55, 29) | $155 | success |
| 1984 | Zone Commercial | (52, 29) | $170 | success |
| 1984 | Zone Commercial | (49, 29) | $160 | success |
| 1984 | Zone Residential | (55, 26) | $190 | success |
| 1984 | Zone Residential | (49, 26) | $185 | success |
| 1984 | Zone Commercial | (55, 23) | $130 | success |
| 1984 | Zone Commercial | (52, 23) | $195 | success |
| 1984 | Zone Commercial | (49, 23) | $165 | success |
| 1984 | build_road_rect | (47, 21) | $400 | success |
| 1984 | Advance | 24 months | - | success |
| 1982 | Advance | 24 months | - | success |
| 1980 | Advance | 24 months | - | success |
| 1978 | build_wire_line | - | $10 | success |
| 1978 | Build Park | (52, 15) | $40 | success |
| 1978 | Zone Residential | (55, 18) | $135 | success |
| 1978 | Zone Residential | (52, 18) | $140 | success |
| 1978 | Zone Residential | (49, 18) | $130 | success |
| 1978 | Zone Residential | (55, 15) | $170 | success |
| 1978 | Zone Residential | (49, 15) | $135 | success |
| 1978 | Zone Residential | (55, 12) | $165 | success |
| 1978 | Zone Residential | (52, 12) | $180 | success |
| 1978 | Zone Residential | (49, 12) | $125 | success |
| 1978 | build_road_rect | (47, 10) | $400 | success |
| 1978 | Advance | 24 months | - | success |
| 1976 | Advance | 24 months | - | success |
| 1974 | Advance | 24 months | - | success |
| 1972 | build_wire_line | - | $30 | success |
| 1972 | Build Park | (41, 48) | $20 | success |
| 1972 | Zone Residential | (44, 51) | $115 | success |
| 1972 | Zone Residential | (41, 51) | $140 | success |
| 1972 | Zone Industrial | (38, 51) | $165 | success |
| 1972 | Zone Residential | (44, 48) | $130 | success |
| 1972 | Zone Commercial | (38, 48) | $145 | success |
| 1972 | Zone Residential | (44, 45) | $155 | success |
| 1972 | Zone Commercial | (41, 45) | $150 | success |
| 1972 | Zone Residential | (38, 45) | $145 | success |
| 1972 | build_road_rect | (36, 43) | $400 | success |
| 1972 | Advance | 24 months | - | success |
| 1970 | Advance | 24 months | - | success |
| 1968 | Advance | 24 months | - | success |
| 1966 | build_wire_line | - | $40 | success |
| 1966 | Build Park | (30, 48) | $40 | success |
| 1966 | Zone Industrial | (33, 51) | $145 | success |
| 1966 | Zone Commercial | (30, 51) | $180 | success |
| 1966 | Zone Residential | (27, 51) | $165 | success |
| 1966 | Zone Residential | (33, 48) | $180 | success |
| 1966 | Zone Residential | (27, 48) | $175 | success |
| 1966 | Zone Residential | (33, 45) | $175 | success |
| 1966 | Zone Residential | (30, 45) | $200 | success |
| 1966 | Zone Residential | (27, 45) | $155 | success |
| 1966 | build_road_rect | (25, 43) | $400 | success |
| 1966 | Advance | 24 months | - | success |
| 1964 | Advance | 24 months | - | success |
| 1962 | Advance | 24 months | - | success |
| 1960 | build_wire_line | - | $40 | success |
| 1960 | Build Park | (19, 48) | $30 | success |
| 1960 | Zone Commercial | (22, 51) | $155 | success |
| 1960 | Zone Commercial | (19, 51) | $165 | success |
| 1960 | Zone Commercial | (16, 51) | $115 | success |
| 1960 | Zone Residential | (22, 48) | $190 | success |
| 1960 | Zone Residential | (16, 48) | $165 | success |
| 1960 | Zone Commercial | (22, 45) | $145 | success |
| 1960 | Zone Commercial | (19, 45) | $195 | success |
| 1960 | Zone Commercial | (16, 45) | $185 | success |
| 1960 | build_road_rect | (14, 43) | $400 | success |
| 1960 | Advance | 24 months | - | success |
| 1958 | Advance | 24 months | - | success |
| 1956 | Advance | 24 months | - | success |
| 1954 | build_wire_line | - | $30 | success |
| 1954 | Build Police Station | (8, 48) | $500 | success |
| 1954 | Zone Industrial | (11, 51) | $100 | success |
| 1954 | Zone Residential | (8, 51) | $205 | success |
| 1954 | Zone Commercial | (5, 51) | $115 | success |
| 1954 | Zone Residential | (11, 48) | $140 | success |
| 1954 | Zone Residential | (5, 48) | $120 | success |
| 1954 | Zone Residential | (11, 45) | $105 | success |
| 1954 | Zone Residential | (8, 45) | $100 | success |
| 1954 | Zone Residential | (5, 45) | $135 | success |
| 1954 | build_road_rect | (3, 43) | $400 | success |
| 1954 | Advance | 24 months | - | success |
| 1952 | Advance | 24 months | - | success |
| 1950 | Advance | 24 months | - | success |
| 1948 | build_wire_line | - | $55 | success |
| 1948 | Build Park | (8, 37) | $40 | success |
| 1948 | Zone Commercial | (11, 40) | $130 | success |
| 1948 | Zone Residential | (8, 40) | $205 | success |
| 1948 | Zone Industrial | (5, 40) | $135 | success |
| 1948 | Zone Industrial | (11, 37) | $170 | success |
| 1948 | Zone Industrial | (5, 37) | $210 | success |
| 1948 | Zone Industrial | (11, 34) | $165 | success |
| 1948 | Zone Industrial | (8, 34) | $180 | success |
| 1948 | Zone Industrial | (5, 34) | $195 | success |
| 1948 | build_road_rect | (3, 32) | $400 | success |
| 1948 | Advance | 24 months | - | success |
| 1946 | Advance | 24 months | - | success |
| 1944 | Advance | 24 months | - | success |
| 1942 | build_wire_line | - | $30 | success |
| 1942 | Build Park | (8, 26) | $40 | success |
| 1942 | Zone Commercial | (11, 29) | $10 | failed |
| 1942 | Zone Residential | (8, 29) | $190 | success |
| 1942 | Zone Industrial | (5, 29) | $175 | success |
| 1942 | Zone Commercial | (11, 26) | $145 | success |
| 1942 | Zone Residential | (5, 26) | $170 | success |
| 1942 | Zone Commercial | (11, 23) | $125 | success |
| 1942 | Zone Residential | (8, 23) | $100 | success |
| 1942 | Zone Commercial | (5, 23) | $135 | success |
| 1942 | build_road_rect | (3, 21) | $400 | success |
| 1942 | Build Coal Power | (25, 33) | $3,110 | success |
| 1942 | Build Coal Power | (13, 21) | $10 | failed |
| 1942 | Build Coal Power | (37, 21) | - | failed |
| 1942 | Build Coal Power | (25, 21) | - | failed |
| 1942 | Build Coal Power | (31, 21) | - | failed |
| 1942 | Build Coal Power | (19, 21) | - | failed |
| 1942 | Build Coal Power | (25, 27) | - | failed |
| 1942 | Build Coal Power | (25, 15) | - | failed |
| 1942 | Advance | 24 months | - | success |
| 1940 | Advance | 24 months | - | success |
| 1938 | Advance | 24 months | - | success |
| 1936 | build_wire_line | - | $20 | success |
| 1936 | Build Park | (8, 15) | $20 | success |
| 1936 | Zone Residential | (11, 18) | $10 | failed |
| 1936 | Zone Commercial | (8, 18) | $175 | success |
| 1936 | Zone Industrial | (5, 18) | $175 | success |
| 1936 | Zone Commercial | (11, 15) | $125 | success |
| 1936 | Zone Commercial | (5, 15) | $210 | success |
| 1936 | Zone Commercial | (11, 12) | $165 | success |
| 1936 | Zone Residential | (8, 12) | $130 | success |
| 1936 | Zone Residential | (5, 12) | $165 | success |
| 1936 | build_road_rect | (3, 10) | $400 | success |
| 1936 | Build Airport | (41, 37) | $10,275 | success |
| 1936 | Advance | 24 months | - | success |
| 1934 | Advance | 24 months | - | success |
| 1932 | Advance | 24 months | - | success |
| 1930 | build_wire_line | - | $20 | success |
| 1930 | Build Park | (41, 26) | $20 | success |
| 1930 | Zone Residential | (44, 29) | $115 | success |
| 1930 | Zone Residential | (41, 29) | $120 | success |
| 1930 | Zone Industrial | (38, 29) | $165 | success |
| 1930 | Zone Commercial | (44, 26) | $120 | success |
| 1930 | Zone Commercial | (38, 26) | $115 | success |
| 1930 | Zone Residential | (44, 23) | $125 | success |
| 1930 | Zone Residential | (41, 23) | $105 | success |
| 1930 | Zone Residential | (38, 23) | $105 | success |
| 1930 | build_road_rect | (36, 21) | $400 | success |
| 1930 | Build Airport | (41, 26) | $110 | failed |
| 1930 | Advance | 24 months | - | success |
| 1928 | Advance | 24 months | - | success |
| 1926 | Advance | 24 months | - | success |
| 1924 | build_wire_line | - | $15 | success |
| 1924 | Build Police Station | (41, 15) | $500 | success |
| 1924 | Zone Industrial | (44, 18) | $115 | success |
| 1924 | Zone Commercial | (41, 18) | $120 | success |
| 1924 | Zone Residential | (38, 18) | $105 | success |
| 1924 | Zone Residential | (44, 15) | $130 | success |
| 1924 | Zone Residential | (38, 15) | $110 | success |
| 1924 | Zone Residential | (44, 12) | $115 | success |
| 1924 | Zone Residential | (41, 12) | $120 | success |
| 1924 | Zone Residential | (38, 12) | $110 | success |
| 1924 | build_road_rect | (36, 10) | $400 | success |
| 1924 | Build Stadium | (30, 37) | $5,205 | success |
| 1924 | Advance | 24 months | - | success |
| 1922 | Advance | 24 months | - | success |
| 1920 | Advance | 24 months | - | success |
| 1918 | Build Park | (30, 15) | $75 | success |
| 1918 | Zone Residential | (33, 18) | $105 | success |
| 1918 | Zone Residential | (30, 18) | $145 | success |
| 1918 | Zone Industrial | (27, 18) | $20 | failed |
| 1918 | Zone Commercial | (33, 15) | $120 | success |
| 1918 | Zone Commercial | (27, 15) | $30 | failed |
| 1918 | Zone Residential | (33, 12) | $155 | success |
| 1918 | Zone Residential | (30, 12) | $195 | success |
| 1918 | Zone Residential | (27, 12) | $160 | success |
| 1918 | build_road_rect | (25, 10) | $330 | success |
| 1918 | Build Seaport | (19, 37) | $3,250 | success |
| 1918 | Advance | 24 months | - | success |
| 1916 | Advance | 24 months | - | success |
| 1914 | Advance | 24 months | - | success |
| 1912 | build_wire_line | - | $20 | success |
| 1912 | Build Park | (19, 26) | $30 | success |
| 1912 | Zone Commercial | (22, 29) | $100 | success |
| 1912 | Zone Residential | (19, 29) | $125 | success |
| 1912 | Zone Industrial | (16, 29) | $175 | success |
| 1912 | Zone Industrial | (22, 26) | $105 | success |
| 1912 | Zone Industrial | (16, 26) | $210 | success |
| 1912 | Zone Industrial | (22, 23) | $105 | success |
| 1912 | Zone Industrial | (19, 23) | $160 | success |
| 1912 | Zone Industrial | (16, 23) | $185 | success |
| 1912 | build_road_rect | (14, 21) | $400 | success |
| 1912 | Advance | 24 months | - | success |
| 1910 | Advance | 24 months | - | success |
| 1908 | Advance | 24 months | - | success |
| 1906 | build_wire_line | - | $10 | success |
| 1906 | Build Park | (19, 15) | $20 | success |
| 1906 | Zone Residential | (22, 18) | - | failed |
| 1906 | Zone Residential | (19, 18) | $125 | success |
| 1906 | Zone Industrial | (16, 18) | $165 | success |
| 1906 | Zone Commercial | (22, 15) | $140 | success |
| 1906 | Zone Commercial | (16, 15) | $190 | success |
| 1906 | Zone Residential | (22, 12) | $100 | success |
| 1906 | Zone Residential | (19, 12) | $100 | success |
| 1906 | Zone Residential | (16, 12) | $150 | success |
| 1906 | build_road_rect | (14, 10) | $350 | success |
| 1906 | Advance | 24 months | - | success |
| 1904 | Advance | 24 months | - | success |
| 1902 | Advance | 24 months | - | success |
| 1900 | build_wire_line | - | $20 | success |
| 1900 | Build Park | (30, 26) | $20 | success |
| 1900 | Zone Residential | (33, 29) | $135 | success |
| 1900 | Zone Industrial | (30, 29) | $190 | success |
| 1900 | Zone Industrial | (27, 29) | $115 | success |
| 1900 | Zone Residential | (33, 26) | $170 | success |
| 1900 | Zone Commercial | (27, 26) | $120 | success |
| 1900 | Zone Industrial | (33, 23) | $155 | success |
| 1900 | Zone Industrial | (30, 23) | $175 | success |
| 1900 | Zone Residential | (27, 23) | $120 | success |
| 1900 | Set Budget | - | - | success |
| 1900 | build_road_rect | (25, 21) | $400 | success |
| 1900 | Advance | 1 month | - | success |
| 1900 | Build Coal Power | (25, 15) | $3,050 | success |
Population 51,360
Funds $86,802
Year 2056
Score 72
Class Capital
Approval
Demand
Population Breakdown
Residential 1,560
Commercial 102
Industrial 24
Assessed Value
Value $37,170,000
Top Problems
Infrastructure
5 Police
0 Fire
2 Power
1 Ports
1 Airports
1 Stadiums
1684 Roads
0 Rail
Power
Powered / Total 75 / 199 (38%)
Budget
Tax Rate 7%
Cash Flow $0
Fire 100%
Police 100%
Road 100%
Environment
Crime 37
Pollution 46
Land Value 75