| Year | Action | Detail | Cost | Result |
|---|---|---|---|---|
| 2205 | Advance | 12 months | - | success |
| 2204 | Advance | 24 months | - | success |
| 2202 | Build Airport | (110, 68) | - | failed |
| 2202 | Advance | 12 months | - | success |
| 2201 | Advance | 24 months | - | success |
| 2199 | Advance | 24 months | - | success |
| 2197 | Advance | 12 months | - | success |
| 2196 | Advance | 24 months | - | success |
| 2194 | Advance | 24 months | - | success |
| 2192 | Advance | 12 months | - | success |
| 2191 | Advance | 24 months | - | success |
| 2189 | Advance | 24 months | - | success |
| 2187 | Advance | 12 months | - | success |
| 2186 | Advance | 24 months | - | success |
| 2184 | Advance | 24 months | - | success |
| 2182 | Advance | 12 months | - | success |
| 2181 | Advance | 24 months | - | success |
| 2179 | Build Airport | (110, 68) | - | failed |
| 2179 | Advance | 12 months | - | success |
| 2178 | Advance | 24 months | - | success |
| 2176 | Build Airport | (110, 68) | - | failed |
| 2176 | Advance | 12 months | - | success |
| 2175 | Advance | 24 months | - | success |
| 2173 | Build Airport | (110, 68) | - | failed |
| 2173 | Advance | 12 months | - | success |
| 2172 | Advance | 24 months | - | success |
| 2170 | Build Airport | (110, 68) | - | failed |
| 2170 | Advance | 12 months | - | success |
| 2169 | Advance | 24 months | - | success |
| 2167 | Build Airport | (110, 68) | - | failed |
| 2167 | Advance | 12 months | - | success |
| 2166 | Advance | 24 months | - | success |
| 2164 | Build Airport | (110, 68) | - | failed |
| 2164 | Advance | 12 months | - | success |
| 2163 | Advance | 24 months | - | success |
| 2161 | Build Airport | (110, 68) | - | failed |
| 2161 | Advance | 12 months | - | success |
| 2160 | Advance | 24 months | - | success |
| 2158 | Build Airport | (110, 68) | - | failed |
| 2158 | Advance | 12 months | - | success |
| 2157 | Advance | 24 months | - | success |
| 2155 | Build Airport | (110, 68) | - | failed |
| 2155 | Advance | 12 months | - | success |
| 2154 | Advance | 24 months | - | success |
| 2152 | Build Airport | (110, 68) | - | failed |
| 2152 | Advance | 12 months | - | success |
| 2151 | Advance | 24 months | - | success |
| 2149 | Build Airport | (110, 68) | - | failed |
| 2149 | Advance | 12 months | - | success |
| 2148 | Advance | 24 months | - | success |
| 2146 | Build Airport | (110, 68) | - | failed |
| 2146 | Advance | 12 months | - | success |
| 2145 | Advance | 24 months | - | success |
| 2143 | Build Airport | (110, 68) | - | failed |
| 2143 | Advance | 12 months | - | success |
| 2142 | Advance | 24 months | - | success |
| 2140 | Build Airport | (110, 68) | - | failed |
| 2140 | Advance | 12 months | - | success |
| 2139 | Advance | 24 months | - | success |
| 2137 | Build Airport | (110, 68) | - | failed |
| 2137 | Advance | 12 months | - | success |
| 2136 | Advance | 24 months | - | success |
| 2134 | Build Airport | (110, 68) | - | failed |
| 2134 | Advance | 12 months | - | success |
| 2133 | Advance | 24 months | - | success |
| 2131 | Build Airport | (110, 68) | - | failed |
| 2131 | Advance | 12 months | - | success |
| 2130 | Advance | 24 months | - | success |
| 2128 | Build Airport | (110, 68) | - | failed |
| 2128 | Advance | 12 months | - | success |
| 2127 | Advance | 24 months | - | success |
| 2125 | Build Airport | (110, 68) | - | failed |
| 2125 | Advance | 12 months | - | success |
| 2124 | Advance | 24 months | - | success |
| 2122 | Build Airport | (110, 68) | - | failed |
| 2122 | Advance | 12 months | - | success |
| 2121 | Advance | 24 months | - | success |
| 2119 | Build Airport | (110, 68) | - | failed |
| 2119 | Advance | 12 months | - | success |
| 2118 | Advance | 24 months | - | success |
| 2116 | Build Airport | (110, 68) | - | failed |
| 2116 | Advance | 12 months | - | success |
| 2115 | Advance | 24 months | - | success |
| 2113 | Build Airport | (110, 68) | - | failed |
| 2113 | Advance | 12 months | - | success |
| 2112 | Advance | 24 months | - | success |
| 2110 | Build Airport | (110, 68) | - | failed |
| 2110 | Advance | 12 months | - | success |
| 2109 | Advance | 24 months | - | success |
| 2107 | Build Airport | (110, 68) | - | failed |
| 2107 | Advance | 12 months | - | success |
| 2106 | Advance | 24 months | - | success |
| 2104 | Build Airport | (110, 68) | - | failed |
| 2104 | Advance | 12 months | - | success |
| 2103 | Advance | 24 months | - | success |
| 2101 | Build Airport | (110, 68) | - | failed |
| 2101 | Advance | 12 months | - | success |
| 2100 | Advance | 24 months | - | success |
| 2098 | Build Airport | (110, 68) | - | failed |
| 2098 | Advance | 12 months | - | success |
| 2097 | Advance | 24 months | - | success |
| 2095 | Build Airport | (110, 68) | - | failed |
| 2095 | Advance | 12 months | - | success |
| 2094 | Advance | 24 months | - | success |
| 2092 | Build Airport | (110, 68) | - | failed |
| 2092 | Advance | 12 months | - | success |
| 2091 | Advance | 24 months | - | success |
| 2089 | Build Airport | (110, 68) | - | failed |
| 2089 | Advance | 12 months | - | success |
| 2088 | Advance | 24 months | - | success |
| 2086 | Build Airport | (110, 68) | - | failed |
| 2086 | Advance | 12 months | - | success |
| 2085 | Advance | 24 months | - | success |
| 2083 | Build Airport | (110, 68) | - | failed |
| 2083 | Advance | 12 months | - | success |
| 2082 | Advance | 24 months | - | success |
| 2080 | Build Airport | (110, 68) | - | failed |
| 2080 | Advance | 12 months | - | success |
| 2079 | Advance | 24 months | - | success |
| 2077 | Build Airport | (110, 68) | - | failed |
| 2077 | Advance | 12 months | - | success |
| 2076 | Advance | 24 months | - | success |
| 2074 | Build Airport | (110, 68) | - | failed |
| 2074 | Advance | 12 months | - | success |
| 2073 | Advance | 24 months | - | success |
| 2071 | Build Airport | (110, 68) | - | failed |
| 2071 | Advance | 12 months | - | success |
| 2070 | Advance | 24 months | - | success |
| 2068 | Build Airport | (110, 68) | - | failed |
| 2068 | Advance | 12 months | - | success |
| 2067 | Advance | 24 months | - | success |
| 2065 | Build Airport | (110, 68) | - | failed |
| 2065 | Advance | 12 months | - | success |
| 2064 | Advance | 24 months | - | success |
| 2062 | Build Airport | (110, 68) | - | failed |
| 2062 | Advance | 12 months | - | success |
| 2061 | Advance | 24 months | - | success |
| 2059 | Build Airport | (110, 68) | - | failed |
| 2059 | Advance | 12 months | - | success |
| 2058 | Advance | 24 months | - | success |
| 2056 | Build Airport | (110, 68) | - | failed |
| 2056 | Advance | 12 months | - | success |
| 2055 | Advance | 24 months | - | success |
| 2053 | Build Airport | (110, 68) | - | failed |
| 2053 | Advance | 12 months | - | success |
| 2052 | Advance | 24 months | - | success |
| 2050 | Build Airport | (110, 68) | - | failed |
| 2050 | Advance | 12 months | - | success |
| 2049 | Advance | 24 months | - | success |
| 2047 | build_wire_line | - | $35 | success |
| 2047 | Build Park | (99, 68) | $20 | success |
| 2047 | Zone Commercial | (102, 71) | $115 | success |
| 2047 | Zone Residential | (99, 71) | $120 | success |
| 2047 | Zone Industrial | (96, 71) | $165 | success |
| 2047 | Zone Commercial | (102, 68) | $115 | success |
| 2047 | Zone Residential | (96, 68) | $105 | success |
| 2047 | Zone Commercial | (102, 65) | $105 | success |
| 2047 | Zone Residential | (99, 65) | $115 | success |
| 2047 | Zone Commercial | (96, 65) | $135 | success |
| 2047 | build_road_rect | (94, 63) | $400 | success |
| 2047 | Build Airport | (99, 68) | - | failed |
| 2047 | Advance | 12 months | - | success |
| 2046 | Advance | 24 months | - | success |
| 2044 | Build Airport | (99, 68) | - | failed |
| 2044 | Advance | 12 months | - | success |
| 2043 | Advance | 24 months | - | success |
| 2041 | Build Airport | (99, 68) | - | failed |
| 2041 | Advance | 12 months | - | success |
| 2040 | Advance | 24 months | - | success |
| 2038 | Build Airport | (99, 68) | - | failed |
| 2038 | Advance | 12 months | - | success |
| 2037 | Advance | 24 months | - | success |
| 2035 | Build Airport | (99, 68) | - | failed |
| 2035 | Advance | 12 months | - | success |
| 2034 | Advance | 24 months | - | success |
| 2032 | Build Airport | (99, 68) | - | failed |
| 2032 | Advance | 12 months | - | success |
| 2031 | Advance | 24 months | - | success |
| 2029 | Build Airport | (99, 68) | - | failed |
| 2029 | Advance | 12 months | - | success |
| 2028 | Advance | 24 months | - | success |
| 2026 | Build Airport | (99, 68) | - | failed |
| 2026 | Advance | 12 months | - | success |
| 2025 | Advance | 24 months | - | success |
| 2023 | Build Airport | (99, 68) | - | failed |
| 2023 | Advance | 12 months | - | success |
| 2020 | Set Budget | - | - | success |
| 2022 | Advance | 24 months | - | success |
| 2020 | Build Airport | (99, 68) | - | failed |
| 2020 | Advance | 12 months | - | success |
| 2019 | Advance | 24 months | - | success |
| 2017 | Build Airport | (99, 68) | - | failed |
| 2017 | Advance | 12 months | - | success |
| 2014 | Set Budget | - | - | success |
| 2016 | Advance | 24 months | - | success |
| 2014 | Build Airport | (99, 68) | $80 | failed |
| 2014 | Advance | 12 months | - | success |
| 2013 | Advance | 24 months | - | success |
| 2011 | build_wire_line | - | $5 | success |
| 2011 | Build Fire Station | (88, 68) | $500 | success |
| 2011 | Zone Industrial | (91, 71) | $115 | success |
| 2011 | Zone Commercial | (88, 71) | $125 | success |
| 2011 | Zone Commercial | (85, 71) | $135 | success |
| 2011 | Zone Residential | (91, 68) | $115 | success |
| 2011 | Zone Residential | (85, 68) | $105 | success |
| 2011 | Zone Commercial | (91, 65) | $155 | success |
| 2011 | Zone Commercial | (88, 65) | $105 | success |
| 2011 | Zone Commercial | (85, 65) | $105 | success |
| 2011 | build_road_rect | (83, 63) | $400 | success |
| 2011 | Build Airport | (88, 68) | - | failed |
| 2011 | Advance | 12 months | - | success |
| 2010 | Advance | 24 months | - | success |
| 2008 | Build Airport | (88, 68) | - | failed |
| 2008 | Advance | 12 months | - | success |
| 2007 | Advance | 24 months | - | success |
| 2005 | Build Airport | (88, 68) | - | failed |
| 2005 | Advance | 12 months | - | success |
| 2004 | Advance | 24 months | - | success |
| 2002 | Build Airport | (88, 68) | $60 | failed |
| 2002 | Advance | 12 months | - | success |
| 2001 | Advance | 24 months | - | success |
| 1999 | build_wire_line | - | $30 | success |
| 1999 | Build Police Station | (77, 68) | $10 | failed |
| 1999 | Zone Commercial | (80, 71) | $130 | success |
| 1999 | Zone Industrial | (77, 71) | $195 | success |
| 1999 | Zone Industrial | (74, 71) | $50 | failed |
| 1999 | Zone Residential | (80, 68) | $140 | success |
| 1999 | Zone Residential | (74, 68) | $30 | failed |
| 1999 | Zone Industrial | (80, 65) | $150 | success |
| 1999 | Zone Industrial | (77, 65) | $40 | failed |
| 1999 | Zone Industrial | (74, 65) | - | failed |
| 1999 | build_road_rect | (72, 63) | $320 | success |
| 1999 | Zone Commercial | (69, 71) | - | failed |
| 1999 | Zone Industrial | (66, 71) | - | failed |
| 1999 | Zone Industrial | (63, 71) | - | failed |
| 1999 | Zone Residential | (69, 68) | - | failed |
| 1999 | Zone Residential | (63, 68) | - | failed |
| 1999 | Zone Industrial | (69, 65) | - | failed |
| 1999 | Zone Industrial | (66, 65) | - | failed |
| 1999 | Zone Industrial | (63, 65) | $100 | success |
| 1999 | build_road_rect | (61, 63) | $300 | success |
| 1999 | Build Airport | (66, 68) | - | failed |
| 1999 | Advance | 12 months | - | success |
| 1998 | Advance | 24 months | - | success |
| 1996 | Build Airport | (66, 68) | - | failed |
| 1996 | Advance | 12 months | - | success |
| 1995 | Advance | 24 months | - | success |
| 1993 | Build Airport | (66, 68) | - | failed |
| 1993 | Advance | 12 months | - | success |
| 1992 | Advance | 24 months | - | success |
| 1990 | build_wire_line | - | $75 | success |
| 1990 | Build Park | (55, 68) | $20 | success |
| 1990 | Zone Residential | (58, 71) | - | failed |
| 1990 | Zone Industrial | (55, 71) | $130 | success |
| 1990 | Zone Industrial | (52, 71) | $180 | success |
| 1990 | Zone Industrial | (58, 68) | $120 | success |
| 1990 | Zone Commercial | (52, 68) | $170 | success |
| 1990 | Zone Industrial | (58, 65) | $120 | success |
| 1990 | Zone Residential | (55, 65) | $195 | success |
| 1990 | Zone Residential | (52, 65) | $160 | success |
| 1990 | build_road_rect | (50, 63) | $400 | success |
| 1990 | Build Airport | (55, 68) | $180 | failed |
| 1990 | Advance | 12 months | - | success |
| 1989 | Advance | 24 months | - | success |
| 1987 | build_wire_line | - | $50 | success |
| 1987 | Build Park | (55, 57) | $20 | success |
| 1987 | Zone Residential | (58, 60) | $100 | success |
| 1987 | Zone Industrial | (55, 60) | $130 | success |
| 1987 | Zone Industrial | (52, 60) | $115 | success |
| 1987 | Zone Industrial | (58, 57) | $100 | success |
| 1987 | Zone Commercial | (52, 57) | $120 | success |
| 1987 | Zone Industrial | (58, 54) | $115 | success |
| 1987 | Zone Residential | (55, 54) | $120 | success |
| 1987 | Zone Residential | (52, 54) | $115 | success |
| 1987 | build_road_rect | (50, 52) | $400 | success |
| 1987 | Build Airport | (55, 57) | - | failed |
| 1987 | Advance | 12 months | - | success |
| 1986 | Advance | 24 months | - | success |
| 1984 | Build Airport | (55, 57) | $70 | failed |
| 1984 | Advance | 12 months | - | success |
| 1983 | Advance | 24 months | - | success |
| 1981 | build_wire_line | - | $55 | success |
| 1981 | Build Park | (55, 46) | $20 | success |
| 1981 | Zone Commercial | (58, 49) | $100 | success |
| 1981 | Zone Residential | (55, 49) | $125 | success |
| 1981 | Zone Industrial | (52, 49) | $125 | success |
| 1981 | Zone Commercial | (58, 46) | $105 | success |
| 1981 | Zone Residential | (52, 46) | $120 | success |
| 1981 | Zone Commercial | (58, 43) | $105 | success |
| 1981 | Zone Residential | (55, 43) | $100 | success |
| 1981 | Zone Commercial | (52, 43) | $105 | success |
| 1981 | build_road_rect | (50, 41) | $400 | success |
| 1981 | Build Airport | (55, 46) | $60 | failed |
| 1981 | Advance | 12 months | - | success |
| 1980 | Advance | 24 months | - | success |
| 1978 | build_wire_line | - | $20 | success |
| 1978 | Build Police Station | (55, 35) | $500 | success |
| 1978 | Zone Industrial | (58, 38) | $100 | success |
| 1978 | Zone Commercial | (55, 38) | $125 | success |
| 1978 | Zone Commercial | (52, 38) | $115 | success |
| 1978 | Zone Residential | (58, 35) | $105 | success |
| 1978 | Zone Residential | (52, 35) | $120 | success |
| 1978 | Zone Commercial | (58, 32) | $105 | success |
| 1978 | Zone Commercial | (55, 32) | $120 | success |
| 1978 | Zone Commercial | (52, 32) | $165 | success |
| 1978 | build_road_rect | (50, 30) | $400 | success |
| 1978 | Build Airport | (55, 35) | - | failed |
| 1978 | Advance | 12 months | - | success |
| 1977 | Advance | 24 months | - | success |
| 1975 | build_wire_line | - | $30 | success |
| 1975 | Build Park | (55, 24) | $20 | success |
| 1975 | Zone Residential | (58, 27) | $100 | success |
| 1975 | Zone Commercial | (55, 27) | $125 | success |
| 1975 | Zone Industrial | (52, 27) | $155 | success |
| 1975 | Zone Commercial | (58, 24) | $105 | success |
| 1975 | Zone Commercial | (52, 24) | $150 | success |
| 1975 | Zone Commercial | (58, 21) | $155 | success |
| 1975 | Zone Residential | (55, 21) | $180 | success |
| 1975 | Zone Residential | (52, 21) | $105 | success |
| 1975 | build_road_rect | (50, 19) | $400 | success |
| 1975 | Build Airport | (55, 24) | $80 | failed |
| 1975 | Advance | 12 months | - | success |
| 1974 | Advance | 24 months | - | success |
| 1972 | build_wire_line | - | $35 | success |
| 1972 | Build Park | (55, 13) | $20 | success |
| 1972 | Zone Industrial | (58, 16) | $100 | success |
| 1972 | Zone Commercial | (55, 16) | $120 | success |
| 1972 | Zone Residential | (52, 16) | $145 | success |
| 1972 | Zone Commercial | (58, 13) | $105 | success |
| 1972 | Zone Residential | (52, 13) | $220 | success |
| 1972 | Zone Commercial | (58, 10) | $100 | success |
| 1972 | Zone Commercial | (55, 10) | $120 | success |
| 1972 | Zone Commercial | (52, 10) | $230 | success |
| 1972 | build_road_rect | (50, 8) | $400 | success |
| 1972 | Build Airport | (55, 13) | $230 | failed |
| 1972 | Advance | 12 months | - | success |
| 1971 | Advance | 24 months | - | success |
| 1969 | build_wire_line | - | $25 | success |
| 1969 | Build Park | (110, 57) | $20 | success |
| 1969 | Zone Commercial | (113, 60) | $115 | success |
| 1969 | Zone Commercial | (110, 60) | $120 | success |
| 1969 | Zone Industrial | (107, 60) | $105 | success |
| 1969 | Zone Residential | (113, 57) | $120 | success |
| 1969 | Zone Commercial | (107, 57) | $105 | success |
| 1969 | Zone Commercial | (113, 54) | $130 | success |
| 1969 | Zone Residential | (110, 54) | $125 | success |
| 1969 | Zone Residential | (107, 54) | $105 | success |
| 1969 | build_road_rect | (105, 52) | $400 | success |
| 1969 | Build Airport | (110, 57) | - | failed |
| 1969 | Advance | 12 months | - | success |
| 1968 | Advance | 24 months | - | success |
| 1966 | Build Airport | (110, 57) | $50 | failed |
| 1966 | Advance | 12 months | - | success |
| 1965 | Advance | 24 months | - | success |
| 1963 | build_wire_line | - | $35 | success |
| 1963 | Build Police Station | (110, 46) | $500 | success |
| 1963 | Zone Industrial | (113, 49) | $115 | success |
| 1963 | Zone Commercial | (110, 49) | $130 | success |
| 1963 | Zone Residential | (107, 49) | $115 | success |
| 1963 | Zone Residential | (113, 46) | $120 | success |
| 1963 | Zone Residential | (107, 46) | $210 | success |
| 1963 | Zone Residential | (113, 43) | $165 | success |
| 1963 | Zone Residential | (110, 43) | $195 | success |
| 1963 | Zone Residential | (107, 43) | $195 | success |
| 1963 | build_road_rect | (105, 41) | $400 | success |
| 1963 | Build Airport | (110, 46) | $320 | failed |
| 1963 | Advance | 12 months | - | success |
| 1962 | Advance | 24 months | - | success |
| 1960 | build_wire_line | - | $5 | success |
| 1960 | Build Fire Station | (110, 35) | $500 | success |
| 1960 | Zone Residential | (113, 38) | $115 | success |
| 1960 | Zone Commercial | (110, 38) | $120 | success |
| 1960 | Zone Residential | (107, 38) | $130 | success |
| 1960 | Zone Residential | (113, 35) | $120 | success |
| 1960 | Zone Industrial | (107, 35) | $175 | success |
| 1960 | Zone Residential | (113, 32) | $145 | success |
| 1960 | Zone Commercial | (110, 32) | $165 | success |
| 1960 | Zone Residential | (107, 32) | $165 | success |
| 1960 | build_road_rect | (105, 30) | $400 | success |
| 1960 | Build Airport | (110, 35) | $220 | failed |
| 1960 | Advance | 12 months | - | success |
| 1959 | Advance | 24 months | - | success |
| 1957 | build_wire_line | - | $10 | success |
| 1957 | Build Park | (110, 24) | $20 | success |
| 1957 | Zone Industrial | (113, 27) | $115 | success |
| 1957 | Zone Commercial | (110, 27) | $115 | success |
| 1957 | Zone Commercial | (107, 27) | $110 | success |
| 1957 | Zone Residential | (113, 24) | $120 | success |
| 1957 | Zone Residential | (107, 24) | $110 | success |
| 1957 | Zone Commercial | (113, 21) | $105 | success |
| 1957 | Zone Commercial | (110, 21) | $105 | success |
| 1957 | Zone Commercial | (107, 21) | $100 | success |
| 1957 | build_road_rect | (105, 19) | $400 | success |
| 1957 | Build Airport | (110, 24) | - | failed |
| 1957 | Advance | 12 months | - | success |
| 1956 | Advance | 24 months | - | success |
| 1954 | build_wire_line | - | $65 | success |
| 1954 | Build Park | (110, 13) | $20 | success |
| 1954 | Zone Commercial | (113, 16) | $115 | success |
| 1954 | Zone Residential | (110, 16) | $120 | success |
| 1954 | Zone Industrial | (107, 16) | $110 | success |
| 1954 | Zone Commercial | (113, 13) | $130 | success |
| 1954 | Zone Residential | (107, 13) | $105 | success |
| 1954 | Zone Commercial | (113, 10) | $115 | success |
| 1954 | Zone Residential | (110, 10) | $160 | success |
| 1954 | Zone Commercial | (107, 10) | $105 | success |
| 1954 | build_road_rect | (105, 8) | $400 | success |
| 1954 | Build Airport | (110, 13) | - | failed |
| 1954 | Advance | 12 months | - | success |
| 1953 | Advance | 24 months | - | success |
| 1951 | Build Airport | (110, 13) | - | failed |
| 1951 | Advance | 12 months | - | success |
| 1950 | Advance | 24 months | - | success |
| 1948 | build_wire_line | - | $30 | success |
| 1948 | Build Police Station | (99, 57) | $500 | success |
| 1948 | Zone Residential | (102, 60) | $115 | success |
| 1948 | Zone Residential | (99, 60) | $120 | success |
| 1948 | Zone Industrial | (96, 60) | $155 | success |
| 1948 | Zone Commercial | (102, 57) | $130 | success |
| 1948 | Zone Commercial | (96, 57) | $195 | success |
| 1948 | Zone Residential | (102, 54) | $145 | success |
| 1948 | Zone Residential | (99, 54) | $200 | success |
| 1948 | Zone Residential | (96, 54) | $195 | success |
| 1948 | build_road_rect | (94, 52) | $400 | success |
| 1948 | Build Airport | (99, 57) | $300 | failed |
| 1948 | Advance | 12 months | - | success |
| 1947 | Advance | 24 months | - | success |
| 1945 | build_wire_line | - | $55 | success |
| 1945 | Build Park | (99, 13) | $20 | success |
| 1945 | Zone Commercial | (102, 16) | $115 | success |
| 1945 | Zone Industrial | (99, 16) | $120 | success |
| 1945 | Zone Industrial | (96, 16) | $155 | success |
| 1945 | Zone Residential | (102, 13) | $130 | success |
| 1945 | Zone Residential | (96, 13) | $165 | success |
| 1945 | Zone Industrial | (102, 10) | $115 | success |
| 1945 | Zone Industrial | (99, 10) | $130 | success |
| 1945 | Zone Industrial | (96, 10) | $100 | success |
| 1945 | build_road_rect | (94, 8) | $400 | success |
| 1945 | Build Airport | (99, 13) | - | failed |
| 1945 | Advance | 12 months | - | success |
| 1942 | Set Budget | - | - | success |
| 1944 | Advance | 24 months | - | success |
| 1942 | Build Airport | (99, 13) | $50 | failed |
| 1942 | Advance | 12 months | - | success |
| 1941 | Advance | 24 months | - | success |
| 1939 | build_wire_line | - | $5 | success |
| 1939 | Build Fire Station | (88, 57) | $500 | success |
| 1939 | Zone Commercial | (91, 60) | $115 | success |
| 1939 | Zone Residential | (88, 60) | $130 | success |
| 1939 | Zone Industrial | (85, 60) | $155 | success |
| 1939 | Zone Commercial | (91, 57) | $115 | success |
| 1939 | Zone Residential | (85, 57) | $180 | success |
| 1939 | Zone Commercial | (91, 54) | $155 | success |
| 1939 | Zone Residential | (88, 54) | $145 | success |
| 1939 | Zone Commercial | (85, 54) | $165 | success |
| 1939 | build_road_rect | (83, 52) | $400 | success |
| 1939 | Build Airport | (88, 57) | - | failed |
| 1939 | Advance | 12 months | - | success |
| 1938 | Advance | 24 months | - | success |
| 1936 | Build Airport | (88, 57) | $280 | failed |
| 1936 | Advance | 12 months | - | success |
| 1935 | Advance | 24 months | - | success |
| 1933 | build_wire_line | - | $20 | success |
| 1933 | Build Park | (88, 13) | $20 | success |
| 1933 | Zone Commercial | (91, 16) | $100 | success |
| 1933 | Zone Residential | (88, 16) | $100 | success |
| 1933 | Zone Industrial | (85, 16) | $160 | success |
| 1933 | Zone Commercial | (91, 13) | $130 | success |
| 1933 | Zone Residential | (85, 13) | $110 | success |
| 1933 | Zone Commercial | (91, 10) | $135 | success |
| 1933 | Zone Commercial | (88, 10) | $160 | success |
| 1933 | Zone Residential | (85, 10) | $135 | success |
| 1933 | build_road_rect | (83, 8) | $400 | success |
| 1933 | Build Airport | (88, 13) | - | failed |
| 1933 | Advance | 12 months | - | success |
| 1932 | Advance | 24 months | - | success |
| 1930 | Build Airport | (88, 13) | $290 | failed |
| 1930 | Advance | 12 months | - | success |
| 1929 | Advance | 24 months | - | success |
| 1927 | Zone Industrial | (80, 60) | - | failed |
| 1927 | Zone Commercial | (77, 60) | - | failed |
| 1927 | Zone Commercial | (74, 60) | - | failed |
| 1927 | Zone Residential | (80, 57) | - | failed |
| 1927 | Zone Residential | (74, 57) | - | failed |
| 1927 | Zone Commercial | (80, 54) | - | failed |
| 1927 | Zone Commercial | (77, 54) | - | failed |
| 1927 | Zone Commercial | (74, 54) | - | failed |
| 1927 | build_road_rect | (72, 52) | - | failed |
| 1927 | Zone Industrial | (80, 16) | - | failed |
| 1927 | Zone Commercial | (77, 16) | $10 | failed |
| 1927 | Zone Commercial | (74, 16) | - | failed |
| 1927 | Zone Residential | (80, 13) | $50 | failed |
| 1927 | Zone Residential | (74, 13) | - | failed |
| 1927 | Zone Commercial | (80, 10) | $20 | failed |
| 1927 | Zone Commercial | (77, 10) | - | failed |
| 1927 | Zone Commercial | (74, 10) | - | failed |
| 1927 | build_road_rect | (72, 8) | $10 | success |
| 1927 | Zone Industrial | (69, 60) | - | failed |
| 1927 | Zone Commercial | (66, 60) | - | failed |
| 1927 | Zone Commercial | (63, 60) | - | failed |
Population 44,480
Funds $1,019
Year 2205
Score 234
Class City
Approval
Demand
Population Breakdown
Residential 1,128
Commercial 77
Industrial 60
Assessed Value
Value $29,290,000
Top Problems
Infrastructure
4 Police
4 Fire
2 Power
1 Ports
0 Airports
1 Stadiums
1453 Roads
0 Rail
Power
Powered / Total 95 / 203 (47%)
Budget
Tax Rate 7%
Cash Flow $0
Fire 100%
Police 100%
Road 100%
Environment
Crime 45
Pollution 45
Land Value 71