Ashen Heath
Ended
| Year | Action | Detail | Cost | Result |
|---|---|---|---|---|
| 2195 | Advance | 12 months | - | success |
| 2194 | Advance | 24 months | - | success |
| 2192 | Advance | 24 months | - | success |
| 2190 | Advance | 12 months | - | success |
| 2189 | Advance | 24 months | - | success |
| 2187 | Advance | 24 months | - | success |
| 2185 | Advance | 24 months | - | success |
| 2183 | Advance | 24 months | - | success |
| 2181 | Build Airport | (9, 75) | $40 | failed |
| 2181 | Advance | 24 months | - | success |
| 2179 | Advance | 24 months | - | success |
| 2177 | build_wire_line | - | $40 | success |
| 2177 | Build Fire Station | (64, 64) | $500 | success |
| 2177 | Zone Commercial | (67, 67) | $115 | success |
| 2177 | Zone Residential | (64, 67) | $125 | success |
| 2177 | Zone Industrial | (61, 67) | $105 | success |
| 2177 | Zone Commercial | (67, 64) | $125 | success |
| 2177 | Zone Residential | (61, 64) | $155 | success |
| 2177 | Zone Commercial | (67, 61) | $140 | success |
| 2177 | Zone Residential | (64, 61) | $185 | success |
| 2177 | Zone Commercial | (61, 61) | $195 | success |
| 2177 | build_road_rect | (59, 59) | $400 | success |
| 2177 | Build Airport | (64, 64) | - | failed |
| 2177 | Advance | 24 months | - | success |
| 2175 | Advance | 24 months | - | success |
| 2173 | Build Airport | (64, 64) | - | failed |
| 2173 | Advance | 24 months | - | success |
| 2171 | Advance | 24 months | - | success |
| 2169 | Build Airport | (64, 64) | - | failed |
| 2169 | Advance | 24 months | - | success |
| 2167 | Advance | 24 months | - | success |
| 2165 | Build Airport | (64, 64) | - | failed |
| 2165 | Advance | 24 months | - | success |
| 2163 | Advance | 24 months | - | success |
| 2161 | Build Airport | (64, 64) | - | failed |
| 2161 | Advance | 24 months | - | success |
| 2159 | Advance | 24 months | - | success |
| 2157 | Build Airport | (64, 64) | - | failed |
| 2157 | Advance | 24 months | - | success |
| 2155 | Advance | 24 months | - | success |
| 2153 | Build Airport | (64, 64) | - | failed |
| 2153 | Advance | 24 months | - | success |
| 2151 | Advance | 24 months | - | success |
| 2149 | Build Airport | (64, 64) | $150 | failed |
| 2149 | Advance | 24 months | - | success |
| 2147 | Advance | 24 months | - | success |
| 2145 | build_wire_line | - | $30 | success |
| 2145 | Build Park | (64, 53) | - | failed |
| 2145 | Zone Residential | (67, 56) | - | failed |
| 2145 | Zone Commercial | (64, 56) | $125 | success |
| 2145 | Zone Industrial | (61, 56) | $135 | success |
| 2145 | Zone Commercial | (67, 53) | - | failed |
| 2145 | Zone Commercial | (61, 53) | $195 | success |
| 2145 | Zone Commercial | (67, 50) | - | failed |
| 2145 | Zone Residential | (64, 50) | - | failed |
| 2145 | Zone Residential | (61, 50) | $30 | failed |
| 2145 | build_road_rect | (59, 48) | $310 | success |
| 2145 | Build Airport | (64, 53) | - | failed |
| 2145 | Advance | 24 months | - | success |
| 2143 | Advance | 24 months | - | success |
| 2141 | Build Airport | (64, 53) | - | failed |
| 2141 | Advance | 24 months | - | success |
| 2139 | Advance | 24 months | - | success |
| 2137 | Build Airport | (64, 53) | - | failed |
| 2137 | Advance | 24 months | - | success |
| 2135 | Advance | 24 months | - | success |
| 2133 | Build Airport | (64, 53) | - | failed |
| 2133 | Advance | 24 months | - | success |
| 2131 | Advance | 24 months | - | success |
| 2129 | Build Airport | (64, 53) | - | failed |
| 2129 | Advance | 24 months | - | success |
| 2127 | Advance | 24 months | - | success |
| 2125 | Build Airport | (64, 53) | - | failed |
| 2125 | Advance | 24 months | - | success |
| 2123 | Advance | 24 months | - | success |
| 2121 | Build Airport | (64, 53) | - | failed |
| 2121 | Advance | 24 months | - | success |
| 2119 | Advance | 24 months | - | success |
| 2117 | Build Airport | (64, 53) | - | failed |
| 2117 | Advance | 24 months | - | success |
| 2115 | Advance | 24 months | - | success |
| 2113 | Build Airport | (64, 53) | - | failed |
| 2113 | Advance | 24 months | - | success |
| 2111 | Advance | 24 months | - | success |
| 2109 | Build Airport | (64, 53) | - | failed |
| 2109 | Advance | 24 months | - | success |
| 2107 | Advance | 24 months | - | success |
| 2105 | Build Airport | (64, 53) | - | failed |
| 2105 | Advance | 24 months | - | success |
| 2103 | Advance | 24 months | - | success |
| 2101 | Build Airport | (64, 53) | - | failed |
| 2101 | Advance | 24 months | - | success |
| 2099 | Advance | 24 months | - | success |
| 2097 | Build Airport | (64, 53) | - | failed |
| 2097 | Advance | 24 months | - | success |
| 2095 | Advance | 24 months | - | success |
| 2093 | Build Airport | (64, 53) | - | failed |
| 2093 | Advance | 24 months | - | success |
| 2091 | Advance | 24 months | - | success |
| 2089 | Build Airport | (64, 53) | - | failed |
| 2089 | Advance | 24 months | - | success |
| 2087 | Advance | 24 months | - | success |
| 2085 | Build Airport | (64, 53) | - | failed |
| 2085 | Advance | 24 months | - | success |
| 2083 | Advance | 24 months | - | success |
| 2081 | Build Airport | (64, 53) | - | failed |
| 2081 | Advance | 24 months | - | success |
| 2079 | Advance | 24 months | - | success |
| 2077 | Build Airport | (64, 53) | - | failed |
| 2077 | Advance | 24 months | - | success |
| 2075 | Advance | 24 months | - | success |
| 2073 | Build Airport | (64, 53) | - | failed |
| 2073 | Advance | 24 months | - | success |
| 2071 | Advance | 24 months | - | success |
| 2069 | Build Airport | (64, 53) | - | failed |
| 2069 | Advance | 24 months | - | success |
| 2067 | Advance | 24 months | - | success |
| 2065 | Build Airport | (64, 53) | - | failed |
| 2065 | Advance | 24 months | - | success |
| 2063 | Advance | 24 months | - | success |
| 2061 | Build Airport | (64, 53) | - | failed |
| 2061 | Advance | 24 months | - | success |
| 2059 | Advance | 24 months | - | success |
| 2057 | build_wire_line | - | $25 | success |
| 2057 | Build Park | (64, 42) | $95 | success |
| 2057 | Zone Industrial | (67, 45) | - | failed |
| 2057 | Zone Commercial | (64, 45) | - | failed |
| 2057 | Zone Residential | (61, 45) | - | failed |
| 2057 | Zone Residential | (67, 42) | $120 | success |
| 2057 | Zone Residential | (61, 42) | - | failed |
| 2057 | Zone Residential | (67, 39) | $100 | success |
| 2057 | Zone Residential | (64, 39) | $105 | success |
| 2057 | Zone Residential | (61, 39) | - | failed |
| 2057 | build_road_rect | (59, 37) | $400 | success |
| 2057 | Build Airport | (64, 42) | - | failed |
| 2057 | Advance | 24 months | - | success |
| 2055 | Advance | 24 months | - | success |
| 2053 | Build Airport | (64, 42) | - | failed |
| 2053 | Advance | 24 months | - | success |
| 2051 | Advance | 24 months | - | success |
| 2049 | Build Airport | (64, 42) | - | failed |
| 2049 | Advance | 24 months | - | success |
| 2047 | Advance | 24 months | - | success |
| 2045 | Build Airport | (64, 42) | - | failed |
| 2045 | Advance | 24 months | - | success |
| 2043 | Advance | 24 months | - | success |
| 2041 | Build Airport | (64, 42) | $40 | failed |
| 2041 | Advance | 24 months | - | success |
| 2039 | Advance | 24 months | - | success |
| 2037 | build_wire_line | - | $25 | success |
| 2037 | Build Police Station | (64, 31) | $500 | success |
| 2037 | Zone Residential | (67, 34) | - | failed |
| 2037 | Zone Residential | (64, 34) | $125 | success |
| 2037 | Zone Residential | (61, 34) | $145 | success |
| 2037 | Zone Residential | (67, 31) | - | failed |
| 2037 | Zone Residential | (61, 31) | $175 | success |
| 2037 | Zone Residential | (67, 28) | - | failed |
| 2037 | Zone Residential | (64, 28) | - | failed |
| 2037 | Zone Residential | (61, 28) | $125 | success |
| 2037 | build_road_rect | (59, 26) | $400 | success |
| 2037 | Build Airport | (64, 31) | - | failed |
| 2037 | Advance | 24 months | - | success |
| 2035 | Advance | 24 months | - | success |
| 2033 | Build Airport | (64, 31) | $160 | failed |
| 2033 | Advance | 24 months | - | success |
| 2031 | Advance | 24 months | - | success |
| 2029 | build_wire_line | - | $15 | success |
| 2029 | Build Park | (64, 20) | $95 | success |
| 2029 | Zone Residential | (67, 23) | - | failed |
| 2029 | Zone Commercial | (64, 23) | - | failed |
| 2029 | Zone Residential | (61, 23) | $135 | success |
| 2029 | Zone Residential | (67, 20) | - | failed |
| 2029 | Zone Industrial | (61, 20) | $185 | success |
| 2029 | Zone Residential | (67, 17) | - | failed |
| 2029 | Zone Commercial | (64, 17) | $135 | success |
| 2029 | Zone Residential | (61, 17) | $130 | success |
| 2029 | build_road_rect | (59, 15) | $310 | success |
| 2029 | Build Airport | (64, 20) | - | failed |
| 2029 | Advance | 24 months | - | success |
| 2027 | Advance | 24 months | - | success |
| 2025 | Build Airport | (64, 20) | $20 | failed |
| 2025 | Advance | 24 months | - | success |
| 2023 | Advance | 24 months | - | success |
| 2021 | Build Park | (64, 9) | $20 | success |
| 2021 | Zone Residential | (67, 12) | $115 | success |
| 2021 | Zone Residential | (64, 12) | $120 | success |
| 2021 | Zone Industrial | (61, 12) | $100 | success |
| 2021 | Zone Commercial | (67, 9) | $130 | success |
| 2021 | Zone Commercial | (61, 9) | $100 | success |
| 2021 | Zone Residential | (67, 6) | $140 | success |
| 2021 | Zone Residential | (64, 6) | $100 | success |
| 2021 | Zone Residential | (61, 6) | - | failed |
| 2021 | build_road_rect | (59, 4) | $270 | success |
| 2021 | Build Airport | (64, 9) | $120 | failed |
| 2021 | Advance | 24 months | - | success |
| 2019 | Advance | 24 months | - | success |
| 2017 | build_wire_line | - | $65 | success |
| 2017 | Build Fire Station | (53, 64) | $500 | success |
| 2017 | Zone Industrial | (56, 67) | $100 | success |
| 2017 | Zone Commercial | (53, 67) | $145 | success |
| 2017 | Zone Residential | (50, 67) | $165 | success |
| 2017 | Zone Residential | (56, 64) | $115 | success |
| 2017 | Zone Residential | (50, 64) | $195 | success |
| 2017 | Zone Residential | (56, 61) | $135 | success |
| 2017 | Zone Residential | (53, 61) | $155 | success |
| 2017 | Zone Residential | (50, 61) | $195 | success |
| 2017 | build_road_rect | (48, 59) | $400 | success |
| 2017 | Build Airport | (53, 64) | $210 | failed |
| 2017 | Advance | 24 months | - | success |
| 2015 | Advance | 24 months | - | success |
| 2013 | build_wire_line | - | $45 | success |
| 2013 | Build Park | (42, 64) | $20 | success |
| 2013 | Zone Industrial | (45, 67) | $115 | success |
| 2013 | Zone Commercial | (42, 67) | $120 | success |
| 2013 | Zone Residential | (39, 67) | $120 | success |
| 2013 | Zone Residential | (45, 64) | $120 | success |
| 2013 | Zone Residential | (39, 64) | $110 | success |
| 2013 | Zone Residential | (45, 61) | $110 | success |
| 2013 | Zone Residential | (42, 61) | $110 | success |
| 2013 | Zone Residential | (39, 61) | $110 | success |
| 2013 | build_road_rect | (37, 59) | $400 | success |
| 2013 | Build Airport | (42, 64) | $250 | failed |
| 2013 | Advance | 24 months | - | success |
| 2011 | Advance | 24 months | - | success |
| 2009 | build_wire_line | - | $45 | success |
| 2009 | Build Park | (31, 64) | $20 | success |
| 2009 | Zone Industrial | (34, 67) | $115 | success |
| 2009 | Zone Residential | (31, 67) | $120 | success |
| 2009 | Zone Residential | (28, 67) | $155 | success |
| 2009 | Zone Commercial | (34, 64) | $120 | success |
| 2009 | Zone Commercial | (28, 64) | $155 | success |
| 2009 | Zone Residential | (34, 61) | $100 | success |
| 2009 | Zone Residential | (31, 61) | $100 | success |
| 2009 | Zone Residential | (28, 61) | $150 | success |
| 2009 | build_road_rect | (26, 59) | $400 | success |
| 2009 | Zone Industrial | (23, 67) | $135 | success |
| 2009 | Zone Residential | (20, 67) | - | failed |
| 2009 | Zone Residential | (17, 67) | $20 | failed |
| 2009 | Zone Commercial | (23, 64) | - | failed |
| 2009 | Zone Commercial | (17, 64) | - | failed |
| 2009 | Zone Residential | (23, 61) | $10 | failed |
| 2009 | Zone Residential | (20, 61) | - | failed |
| 2009 | Zone Residential | (17, 61) | - | failed |
| 2009 | build_road_rect | (15, 59) | $390 | success |
| 2009 | Build Airport | (20, 64) | $170 | failed |
| 2009 | Advance | 24 months | - | success |
| 2007 | Advance | 24 months | - | success |
| 2005 | build_wire_line | - | $50 | success |
| 2005 | Build Police Station | (9, 64) | - | failed |
| 2005 | Zone Industrial | (12, 67) | $100 | success |
| 2005 | Zone Commercial | (9, 67) | $140 | success |
| 2005 | Zone Residential | (6, 67) | $115 | success |
| 2005 | Zone Residential | (12, 64) | - | failed |
| 2005 | Zone Residential | (6, 64) | $120 | success |
| 2005 | Zone Residential | (12, 61) | - | failed |
| 2005 | Zone Residential | (9, 61) | - | failed |
| 2005 | Zone Residential | (6, 61) | - | failed |
| 2005 | build_road_rect | (4, 59) | $390 | success |
| 2005 | Build Airport | (9, 64) | - | failed |
| 2005 | Advance | 24 months | - | success |
| 2003 | Advance | 24 months | - | success |
| 2001 | build_wire_line | - | $50 | success |
| 2001 | Build Park | (53, 53) | $95 | success |
| 2001 | Zone Commercial | (56, 56) | $115 | success |
| 2001 | Zone Residential | (53, 56) | - | failed |
| 2001 | Zone Industrial | (50, 56) | - | failed |
| 2001 | Zone Industrial | (56, 53) | $135 | success |
| 2001 | Zone Industrial | (50, 53) | - | failed |
| 2001 | Zone Industrial | (56, 50) | $100 | success |
| 2001 | Zone Industrial | (53, 50) | $105 | success |
| 2001 | Zone Industrial | (50, 50) | - | failed |
| 2001 | build_road_rect | (48, 48) | $400 | success |
| 2001 | Zone Commercial | (56, 45) | - | failed |
| 2001 | Zone Residential | (53, 45) | $120 | success |
| 2001 | Zone Industrial | (50, 45) | $105 | success |
| 2001 | Zone Industrial | (56, 42) | - | failed |
| 2001 | Zone Industrial | (50, 42) | - | failed |
| 2001 | Zone Industrial | (56, 39) | - | failed |
| 2001 | Zone Industrial | (53, 39) | - | failed |
| 2001 | Zone Industrial | (50, 39) | - | failed |
| 2001 | build_road_rect | (48, 37) | $340 | success |
| 2001 | Build Airport | (53, 42) | - | failed |
| 2001 | Advance | 24 months | - | success |
| 1999 | Advance | 24 months | - | success |
| 1997 | build_wire_line | - | $50 | success |
| 1997 | Build Park | (53, 31) | $70 | success |
| 1997 | Zone Commercial | (56, 34) | $115 | success |
| 1997 | Zone Commercial | (53, 34) | - | failed |
| 1997 | Zone Commercial | (50, 34) | - | failed |
| 1997 | Zone Commercial | (56, 31) | $120 | success |
| 1997 | Zone Residential | (50, 31) | $105 | success |
| 1997 | Zone Residential | (56, 28) | $165 | success |
| 1997 | Zone Commercial | (53, 28) | $125 | success |
| 1997 | Zone Commercial | (50, 28) | $105 | success |
| 1997 | build_road_rect | (48, 26) | $400 | success |
| 1997 | Build Airport | (53, 31) | - | failed |
| 1997 | Advance | 24 months | - | success |
| 1995 | Advance | 24 months | - | success |
| 1993 | Build Airport | (53, 31) | - | failed |
| 1993 | Advance | 12 months | - | success |
| 1992 | Advance | 24 months | - | success |
| 1990 | Advance | 24 months | - | success |
| 1988 | Advance | 24 months | - | success |
| 1986 | Advance | 24 months | - | success |
| 1984 | Build Coal Power | (60, 4) | $3,000 | success |
| 1984 | Build Coal Power | (43, 4) | - | failed |
| 1984 | Build Coal Power | (37, 16) | - | failed |
| 1984 | Build Coal Power | (49, 4) | - | failed |
| 1984 | Build Coal Power | (32, 4) | - | failed |
| 1984 | Build Coal Power | (26, 16) | - | failed |
| 1984 | Build Coal Power | (38, 4) | - | failed |
| 1984 | Build Coal Power | (21, 4) | - | failed |
| 1984 | Build Coal Power | (15, 16) | - | failed |
| 1984 | Build Coal Power | (27, 4) | - | failed |
| 1984 | Build Coal Power | (10, 4) | - | failed |
| 1984 | Build Coal Power | (26, 2) | - | failed |
| 1984 | Build Coal Power | (26, 50) | - | failed |
| 1984 | Build Coal Power | (2, 26) | - | failed |
| 1984 | Build Coal Power | (50, 26) | - | failed |
| 1984 | Build Coal Power | (26, 8) | - | failed |
| 1984 | Build Coal Power | (26, 44) | - | failed |
| 1984 | Build Coal Power | (8, 26) | - | failed |
| 1984 | Build Coal Power | (44, 26) | - | failed |
| 1984 | Build Coal Power | (14, 38) | - | failed |
| 1984 | Build Coal Power | (38, 14) | - | failed |
| 1984 | Build Coal Power | (14, 14) | - | failed |
| 1984 | Build Coal Power | (38, 38) | - | failed |
| 1984 | Build Coal Power | (26, 14) | - | failed |
| 1984 | Build Coal Power | (26, 38) | - | failed |
| 1984 | Build Coal Power | (14, 26) | - | failed |
| 1984 | Build Coal Power | (38, 26) | - | failed |
| 1984 | Build Coal Power | (26, 26) | - | failed |
| 1984 | Build Coal Power | (32, 26) | - | failed |
| 1984 | Build Coal Power | (20, 26) | - | failed |
| 1984 | Build Coal Power | (26, 32) | - | failed |
| 1984 | Build Coal Power | (26, 20) | - | failed |
| 1984 | Build Airport | (53, 31) | - | failed |
| 1984 | Advance | 24 months | - | success |
| 1982 | Advance | 24 months | - | success |
| 1980 | Build Coal Power | (48, 27) | - | failed |
| 1980 | Build Coal Power | (48, 10) | - | failed |
| 1980 | Build Coal Power | (60, 15) | - | failed |
| 1980 | Build Coal Power | (43, 15) | - | failed |
| 1980 | Build Coal Power | (48, 16) | - | failed |
| 1980 | Build Coal Power | (60, 4) | - | failed |
| 1980 | Build Coal Power | (43, 4) | - | failed |
| 1980 | Build Coal Power | (37, 16) | - | failed |
| 1980 | Build Coal Power | (49, 4) | - | failed |
| 1980 | Build Coal Power | (32, 4) | - | failed |
| 1980 | Build Coal Power | (26, 16) | - | failed |
| 1980 | Build Coal Power | (38, 4) | - | failed |
| 1980 | Build Coal Power | (21, 4) | - | failed |
| 1980 | Build Coal Power | (15, 16) | - | failed |
| 1980 | Build Coal Power | (27, 4) | - | failed |
| 1980 | Build Coal Power | (10, 4) | - | failed |
| 1980 | Build Coal Power | (26, 2) | - | failed |
| 1980 | Build Coal Power | (26, 50) | - | failed |
| 1980 | Build Coal Power | (2, 26) | - | failed |
| 1980 | Build Coal Power | (50, 26) | - | failed |
| 1980 | Build Coal Power | (26, 8) | - | failed |
| 1980 | Build Coal Power | (26, 44) | - | failed |
| 1980 | Build Coal Power | (8, 26) | - | failed |
| 1980 | Build Coal Power | (44, 26) | - | failed |
| 1980 | Build Coal Power | (14, 38) | - | failed |
| 1980 | Build Coal Power | (38, 14) | - | failed |
| 1980 | Build Coal Power | (14, 14) | - | failed |
| 1980 | Build Coal Power | (38, 38) | - | failed |
| 1980 | Build Coal Power | (26, 14) | - | failed |
| 1980 | Build Coal Power | (26, 38) | - | failed |
| 1980 | Build Coal Power | (14, 26) | - | failed |
| 1980 | Build Coal Power | (38, 26) | - | failed |
| 1980 | Build Coal Power | (26, 26) | - | failed |
| 1980 | Build Coal Power | (32, 26) | - | failed |
| 1980 | Build Coal Power | (20, 26) | - | failed |
| 1980 | Build Coal Power | (26, 32) | - | failed |
| 1980 | Build Coal Power | (26, 20) | - | failed |
| 1980 | Build Airport | (53, 31) | - | failed |
| 1980 | Advance | 24 months | - | success |
| 1978 | Advance | 24 months | - | success |
| 1976 | Build Coal Power | (48, 27) | - | failed |
| 1976 | Build Coal Power | (48, 10) | - | failed |
| 1976 | Build Coal Power | (60, 15) | - | failed |
| 1976 | Build Coal Power | (43, 15) | - | failed |
| 1976 | Build Coal Power | (48, 16) | - | failed |
| 1976 | Build Coal Power | (60, 4) | - | failed |
| 1976 | Build Coal Power | (43, 4) | - | failed |
| 1976 | Build Coal Power | (37, 16) | - | failed |
| 1976 | Build Coal Power | (49, 4) | - | failed |
| 1976 | Build Coal Power | (32, 4) | - | failed |
| 1976 | Build Coal Power | (26, 16) | - | failed |
| 1976 | Build Coal Power | (38, 4) | - | failed |
| 1976 | Build Coal Power | (21, 4) | - | failed |
| 1976 | Build Coal Power | (15, 16) | - | failed |
| 1976 | Build Coal Power | (27, 4) | - | failed |
| 1976 | Build Coal Power | (10, 4) | - | failed |
| 1976 | Build Coal Power | (26, 2) | - | failed |
| 1976 | Build Coal Power | (26, 50) | - | failed |
| 1976 | Build Coal Power | (2, 26) | - | failed |
| 1976 | Build Coal Power | (50, 26) | - | failed |
| 1976 | Build Coal Power | (26, 8) | - | failed |
| 1976 | Build Coal Power | (26, 44) | - | failed |
| 1976 | Build Coal Power | (8, 26) | - | failed |
| 1976 | Build Coal Power | (44, 26) | - | failed |
| 1976 | Build Coal Power | (14, 38) | - | failed |
| 1976 | Build Coal Power | (38, 14) | - | failed |
| 1976 | Build Coal Power | (14, 14) | - | failed |
| 1976 | Build Coal Power | (38, 38) | - | failed |
| 1976 | Build Coal Power | (26, 14) | - | failed |
| 1976 | Build Coal Power | (26, 38) | - | failed |
| 1976 | Build Coal Power | (14, 26) | - | failed |
| 1976 | Build Coal Power | (38, 26) | - | failed |
| 1976 | Build Coal Power | (26, 26) | - | failed |
| 1976 | Build Coal Power | (32, 26) | - | failed |
| 1976 | Build Coal Power | (20, 26) | - | failed |
| 1976 | Build Coal Power | (26, 32) | - | failed |
| 1976 | Build Coal Power | (26, 20) | - | failed |
| 1976 | Build Airport | (53, 31) | - | failed |
| 1976 | Advance | 24 months | - | success |
| 1974 | Advance | 24 months | - | success |
| 1972 | Set Budget | - | - | success |
| 1972 | Build Coal Power | (48, 27) | $50 | failed |
| 1972 | Build Coal Power | (48, 10) | - | failed |
| 1972 | Build Coal Power | (60, 15) | $130 | failed |
| 1972 | Build Coal Power | (43, 15) | $40 | failed |
| 1972 | Build Coal Power | (48, 16) | - | failed |
| 1972 | Build Coal Power | (60, 4) | - | failed |
| 1972 | Build Coal Power | (43, 4) | - | failed |
| 1972 | Build Coal Power | (37, 16) | - | failed |
| 1972 | Build Coal Power | (49, 4) | - | failed |
| 1972 | Build Coal Power | (32, 4) | - | failed |
| 1972 | Build Coal Power | (26, 16) | - | failed |
| 1972 | Build Coal Power | (38, 4) | - | failed |
| 1972 | Build Coal Power | (21, 4) | - | failed |
| 1972 | Build Coal Power | (15, 16) | - | failed |
| 1972 | Build Coal Power | (27, 4) | - | failed |
| 1972 | Build Coal Power | (10, 4) | - | failed |
| 1972 | Build Coal Power | (26, 2) | - | failed |
| 1972 | Build Coal Power | (26, 50) | - | failed |
| 1972 | Build Coal Power | (2, 26) | $40 | failed |
| 1972 | Build Coal Power | (50, 26) | - | failed |
| 1972 | Build Coal Power | (26, 8) | - | failed |
| 1972 | Build Coal Power | (26, 44) | - | failed |
| 1972 | Build Coal Power | (8, 26) | - | failed |
| 1972 | Build Coal Power | (44, 26) | - | failed |
| 1972 | Build Coal Power | (14, 38) | $10 | failed |
| 1972 | Build Coal Power | (38, 14) | - | failed |
| 1972 | Build Coal Power | (14, 14) | - | failed |
| 1972 | Build Coal Power | (38, 38) | - | failed |
| 1972 | Build Coal Power | (26, 14) | - | failed |
| 1972 | Build Coal Power | (26, 38) | - | failed |
| 1972 | Build Coal Power | (14, 26) | - | failed |
| 1972 | Build Coal Power | (38, 26) | - | failed |
| 1972 | Build Coal Power | (26, 26) | - | failed |
| 1972 | Build Coal Power | (32, 26) | - | failed |
| 1972 | Build Coal Power | (20, 26) | - | failed |
| 1972 | Build Coal Power | (26, 32) | - | failed |
| 1972 | Build Coal Power | (26, 20) | - | failed |
| 1972 | Build Airport | (53, 31) | $70 | failed |
| 1972 | Advance | 24 months | - | success |
| 1970 | Advance | 24 months | - | success |
| 1968 | build_wire_line | - | $30 | success |
| 1968 | Build Fire Station | (53, 20) | $500 | success |
| 1968 | Zone Industrial | (56, 23) | $115 | success |
| 1968 | Zone Commercial | (53, 23) | $135 | success |
| 1968 | Zone Commercial | (50, 23) | $175 | success |
| 1968 | Zone Residential | (56, 20) | $120 | success |
| 1968 | Zone Residential | (50, 20) | $190 | success |
| 1968 | Zone Commercial | (56, 17) | $155 | success |
| 1968 | Zone Commercial | (53, 17) | $175 | success |
| 1968 | Zone Commercial | (50, 17) | $115 | success |
| 1968 | build_road_rect | (48, 15) | $400 | success |
| 1968 | Build Airport | (53, 20) | - | failed |
| 1968 | Advance | 24 months | - | success |
| 1966 | Advance | 24 months | - | success |
| 1964 | Build Airport | (53, 20) | - | failed |
| 1964 | Advance | 24 months | - | success |
| 1962 | Advance | 24 months | - | success |
| 1960 | Build Airport | (53, 20) | $250 | failed |
| 1960 | Advance | 24 months | - | success |
| 1958 | Advance | 24 months | - | success |
| 1956 | build_wire_line | - | $35 | success |
| 1956 | Build Park | (53, 9) | $20 | success |
| 1956 | Zone Commercial | (56, 12) | $135 | success |
| 1956 | Zone Residential | (53, 12) | $180 | success |
| 1956 | Zone Industrial | (50, 12) | $130 | success |
| 1956 | Zone Industrial | (56, 9) | $130 | success |
| 1956 | Zone Industrial | (50, 9) | $125 | success |
| 1956 | Zone Industrial | (56, 6) | $115 | success |
| 1956 | Zone Industrial | (53, 6) | $120 | success |
| 1956 | Zone Industrial | (50, 6) | $105 | success |
| 1956 | build_road_rect | (48, 4) | $400 | success |
| 1956 | Zone Commercial | (45, 56) | - | failed |
| 1956 | Zone Residential | (42, 56) | - | failed |
| 1956 | Zone Industrial | (39, 56) | - | failed |
| 1956 | Zone Industrial | (45, 53) | - | failed |
| 1956 | Zone Industrial | (39, 53) | - | failed |
| 1956 | Zone Industrial | (45, 50) | - | failed |
| 1956 | Zone Industrial | (42, 50) | - | failed |
| 1956 | Zone Industrial | (39, 50) | - | failed |
| 1956 | build_road_rect | (37, 48) | $310 | success |
Population 53,760
Funds $0
Year 2195
Score 316
Class Capital
Approval
Demand
Population Breakdown
Residential 1,320
Commercial 84
Industrial 87
Assessed Value
Value $32,865,000
Top Problems
Infrastructure
3 Police
5 Fire
2 Power
1 Ports
0 Airports
1 Stadiums
2163 Roads
0 Rail
Power
Powered / Total 98 / 197 (50%)
Budget
Tax Rate 7%
Cash Flow $0
Fire 100%
Police 63%
Road 100%
Environment
Crime 53
Pollution 48
Land Value 69